This document contains questions and answers related to Solicitation 140L6224Q0009 for the JO Sandhills Fence Rebuild project. The solicitation requires furnishing materials, labor, and equipment to construct approximately 16,621 linear feet of 4-wire wildlife friendly fence, including removal and disposal of the existing woven wire and barbed wire fence. The work also includes vegetation clearing along the fence route.

The key details include:

  • Suggested equipment for vegetation removal is a tracked skid steer with mowing attachment
  • Contractors can store equipment and materials on-site, but security is their responsibility
  • There is no access to utilities on-site, and no official facilities nearby for showers or restrooms
  • Contractors can access the site at their convenience, and camping is permitted on public lands near the site
  • Disposal of existing materials can be done incrementally or all at once, and roll-offs can access the site
  • A site visit is scheduled for April 11, 2024 at 9:00 AM MT at the BLM - WY Rawlins Field Office.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140L6224Q0009

AMD 002

Questions Addressed Solicitation: 140L6224Q0009 JO Sandhills Fence Rebuild

1. What type of mower is needed for vegetation clearing? Will removal/disposal of trees, brush, etc. be required or is it simply high grass to cut down?

a) Mowing will include the removal of shrub and brush (i.e. sagebrush and mountain shrubs) and no large trees. Suggested equipment for vegetation removal (i.e., mowing) would be a tracked skid steer with mowing attachment. The solicitation requires a mowed swath/buffer of 16 feet (8 feet on each side of the fence route).

2. Can equipment and materials be stored onsite? If so, is it secured from access and potential theft?

a) Equipment and materials can be stored on-site, however security from theft of vandalism would be the responsibility of the contractor. No such resources will be provided by the BLM.

3. Is there access to any utilities onsite? Water and electricity are the only considerations we’re seeking.

a) There is no such access to utilities. This is a rangeland worksite and there or no public utilities (water/electricity) in proximity.

4. Should teams be able to camp onsite, is there any location nearby for showers, restrooms, etc.? Can work teams come and go from the jobsite areas as they please or will there be controlled hours of access?

a) Work teams may access the project site at their convenience. Access to the project area is public and not restricted. Camping would be permitted on public lands near the project site. BLM rules and restrictions would apply. The 14-day camping limit would be waived for contractors working on this project. There are no official facilities (i.e., showers or bathrooms) in proximity to the project site. The nearest such facilities would be in the nearest towns of Baggs or Rawlins Wyoming.

5. Are there designated areas for staging of materials to be disposed of upon tear-out of the existing fence? Is the disposal required to happen incrementally or can it be completed in full upon or near completion of installation? Can roll-offs access the site for a dumpster swap if necessary?

a) A material staging area can be identified, if requested. Disposal, of old materials, will be at the contractor’s convenience and may be accomplished at once or in multiple trips if required. Access by roll-offs can be made to areas close to the project site (est. 1 – 1.5 miles).