Bid_Schedule-_Revised_0003.pdf
PDF 16 KB Posted
- Attached to
- JO SANDHILLS FENCE REBUILD
- Solicitation number
- 140L6224Q0009
About this file
The document is a Bid Schedule for the JO Sandhills Fence Rebuild 2024 project, Solicitation Number 140L6224Q0009, issued by the Department of the Interior Bureau of Land Management Wyoming Region.
The project requires furnishing materials, labor, and equipment to construct approximately 16,621 linear feet of new 4-wire wildlife friendly fence, as well as the removal and disposal of the existing 16,621 linear feet of woven wire and barbed wire fence. The work also includes vegetation removal (mowing) along the entire 16,621 linear foot fence route to a width of 16 feet. Due to the sandy soil conditions, every fourth line post must be a wood post set to a minimum depth of 3.5 feet. A site visit is scheduled for April 11, 2024 at 9:00 AM MT at the BLM Rawlins Field Office. Bid items include mobilization/demobilization, fence removal and disposal, new fence construction (labor and materials), vegetation removal, and installation of H-braces, wire gates, and 3-post corner panels.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Question_Addressed_0004.docx | DOCX document | |
| Sol_140L6224Q0009_Amd_0004.pdf | ||
| Sol_140L6224Q0009_Amd_0003.pdf | ||
| Questions_Addressed_0002.docx | DOCX document | |
| Sol_140L6224Q0009_Amd_0002.pdf | ||
| Questions_Addressed_-_JO_Sandhills_Fence_FY24_0001.docx | DOCX document | |
| Sol_140L6224Q0009_Amd_0001.pdf | ||
| Attachment_6-__Limitations_on_Subcontracting_Breakout.pdf | ||
| Sol_140L6224Q0009.pdf | ||
| Attachment_4-_Wage_Determination_WY20240037.docx | DOCX document | |
| Attachment_5-_SF_1442_Completion_Instructions.pdf | ||
| Attachment_1-_Specifications_-_Statement_of_Work_JO_Sandhills_Fence_Rebuild.pdf | ||
| Attachment_3-_Bid_Schedule.xlsx | XLSX spreadsheet | |
| Attachment_2-_Drawings_and_Maps.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item Description Unit Quantity Unit Price Cost Amount
1 Mobilization / Demobilization LS 1.00 $0.00
2 Fence Removal and Disposal LF 16621.00 $0.00
Construct New 4-Wire Fence (3
Barbed, 1 Smooth) - Labor LF 16621.00 $0.00
Construct New 4-Wire Fence (3
Barbed, 1 Smooth) - Materials LF 16621.00 $0.00
5 Vegetation Removal (Mowing) LF 16621.00 $0.00
6 H-braces EA 22 $0.00
7 Wire Gates EA 10 $0.00
8 3-Post Corner Panels EA 12 $0.00
TOTAL $0.00
The removal of 16,621 Liner Feet (LF) (est. 3.15 Miles) of existing four wire and woven wire fence. The removal of vegetation (16' buffer) along the existing fence line route. The construction of 16,621 LF of "New" 4-wire wildlife friendly fence utilizing all new materials. New construction will include the use of a wood line post every
66' (every 4th post @ 16.5' foot spacing).
Project Location
JO Sandhills Fence Rebuild 2024 - 14L6224Q0009
Contract/Project Name
Rawlins BLM Field Office - Carbon County, Wyoming
Project Description: