Questions_Addressed_0001.docx
DOCX document 19 KB Posted
- Attached to
- LX BAR CBNG RECLAMATION Federal contract opportunity
- Solicitation number
- 140L6222R0017
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L6222R0017_Amd_0002.pdf | ||
| Questions_Addressed_0002.docx | DOCX document | |
| Pre_Bid_Conference_0001.pdf | ||
| Sol_140L6222R0017_Amd_0001.pdf | ||
| Wage_Determination_WY20220036.pdf | ||
| Attachment_2_Data_Sheet.pdf | ||
| Attachment_3_Bid_Schedule_Worksheet.pdf | ||
| Attachment_1_Statement_of_Work_.pdf | ||
| Sol_140L6222R0017.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140L6222R0017
AMD 001
Questions Addressed Solicitation: 140L6222R0017 LX Bar CBNG Reclamation
1. Instructions about proposal contents listed in Section L include the following:
Schedule B with prices filled in – page 6 of solicitation and Attachment 4 – Schedule B Worksheet – Can be attached to SF-1442.
There is no “Attachment 4 – Schedule B Worksheet.” There is a PDF titled “Attachment_3_Bid_Schedule_Worksheet,” but it does not match the schedule of items listed in Section B (and it mentions a “bid schedule” when this is an RFP). Please clarify.
a. Schedule B in the Contract is the shortened, and condensed version which lumps all the unit priced items up in the major categories for a firm-fixed price contract.
Schedule B - Worksheet is the breakout so we have a guide to invoice and pay off of along with the unit prices so we will have something to compare prices with and estimates future prices.
2. What is the disturbance area?
a. There is no defined disturbance area, work within the already existing disturbance and all disturbed areas most be reclaimed and reseeded.
3. Can cover crop be added to seed mix?
a. Yes, as long as correct mix is used.
4. Completion date listed in section F.3. is November 2022.
a. Period of performance is 10/01/2022 – 09/30/2023. Specific schedules within period of performance will be discussed once awarded.
5. What is payment based on?
a. Payment is LS not by quantity.
6. Is an engineer design required for the reclamation?
a. No Engineer design required.