140L6221R0013

AMENDMENT: 0002

1. As far as the stays goes, you need stays in the actual fence wire as well as gates or this fence will need rebuilt in a year.

Per the statement of work, stays are only needed in the wire fence.

2. Also, the POP was extended to July 30th 2021, and then in the next sentence states you have 120 days to get it done.

This was a typo, the POP end date has been changed to July 30, 2022. Please see the Standard Form (SF) 30 as well for the performance end date.

3. Looking at the specs/drawings attached to the proposal, the drawings appear to be for a permanent fence, not a drop or lay down fence?

The drawings attached in Amendment 0001 were typical drawing for a 3-wire/4-wire fence.

Attached with Amendment 0002 is a typical laydown drawing. The drawing shows steel posts along with wood posts, but these fences will be constructed using all wood.

4. To clarify a few things, I think we are misunderstood about the questions. There is woven/netwire mentioned in the solicitation, I sent a picture showing where it is.

The statement of work has been updated.

***CHANGE END DATE FOR QUESTIONS FROM 07/13/2021 TO 07/08/2021 3:00 P.M. MOUNTAIN TIME. QUESTIONS SUBMITTED AFTER THIS TIME WILL NO LONGER BE ANSWERED. ***