PAGE

SECTION 02826

FENCE-DRAINAGE CROSSINGS

PART 1: GENERAL

1.1

SUMMARY

A. Section Includes: Furnishing and installing drainage crossings at the locations shown on the drawings, or as staked in the field.

1.1

PROJECT/SITE CONDITIONS

A. Requirements: Access roads shall not be constructed along fence lines and to the construction site unless written approval is granted by the Contracting Officer. Cross country travel with wheeled or tracked vehicles shall be only to and along fence lines.

PART 2: PRODUCTS

2.1

MATERIALS

A. Wire Fence Materials: Shall be according to Section 02824 - Wire Fences and Gates and as shown on the drawings.

PART 3: EXECUTION

3.1

PREPARATION

A. Clearing: Clearing shall be limited to hand clearing. Only vegetation that interferes with the fence shall be removed. All debris shall be disposed of in the immediate vicinity.

3.2

INSTALLATION

A. Type A: Construct Type A drainage crossings as shown on the drawings, with an auxiliary fence of wire, rock weights, and posts constructed under and independent of the main fence, so that when the crossing washes out, the main fence will not be damaged.

PART 4: MEASUREMENT AND PAYMENT

4.1

METHOD OF MEASUREMENT

A. Units: The work described in this section will be measured and paid for as complete units.

4.2

BASIS OF PAYMENT

A. Payment: This will not be a separate pay item for this bid.

END OF SECTION 02826