140L6221R0006 AMD 0002 QUESTIONS AND ANSWERS SITE VISIT_0002.pdf
PDF 97 KB Posted
- Attached to
- JOHN BLUE ROCK GRINDING PHASE 2
- Solicitation number
- 140L6221R0006
About this file
This document provides questions and answers from a site visit related to solicitation number 140L6221R0006 for the John Blue Rock Grinding Phase 2 opportunity with the Department of the Interior Bureau of Land Management Wyoming Region. The solicitation is for a construction project to grind existing rock formations at the John Blue site. Questions from potential offerors covered project specifications, materials requirements, safety protocols, and the performance period. The Bureau aimed to clarify scope and requirements to enable responsive proposals due by April 15th, 2023. The period of performance is expected to last 12 months following award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 140L6221R0006 AMD 0004 QUESTION AND ANSWER_0004.pdf | ||
| Sol_140L6221R0006_Amd_0004.pdf | ||
| 140L6221R0006 AMD 0004 UPDATE BID SCHEDULE_0004.xlsx | XLSX spreadsheet | |
| 140L6221R0006 AMD 0003 QUESTIONS AND ANSWERS_0003.pdf | ||
| Sol_140L6221R0006_Amd_0003.pdf | ||
| SITE VISIT PRE BID MEETING_0002.pdf | ||
| Sol_140L6221R0006_Amd_0002.pdf | ||
| Sol_140L6221R0006_Amd_0001.pdf | ||
| Project Map.jpg | JPG image | |
| John Blue Road 01009 General Information and Requirements Final.docx | DOCX document | |
| Bid Schedule John Blue Road Grinding Phase 2.xlsx | XLSX spreadsheet | |
| rds rubber waterbar.pdf | ||
| Typical Road Cross Sections (02315 1B).pdf | ||
| Location Map.docx | DOCX document | |
| Road Map.jpg | JPG image | |
| Project Location.png | PNG image | |
| Sol_140L6221R0006.pdf | ||
| Typical Road Sections (02315 1A).pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140L6221R0006
AMENDMENT: 0002
QUESTIONS AND ANSWERS – SITE VISIT
1. Was the depth of the rubber water diverter in roadway in the specification?
Yes, we want them installed per the specifications.
2. If the depth cannot be reached at the specified location of the diverters, is it okay to move them?
Yes, but still close enough to the identified location in the specifications to have them be effective to mitigate the water.
3. What concentrate mixture of the stabilization?
Follow the manufacturers recommendations for applying the stabilization.
4. Pumping from River?
Is okay if you have a permit and its approved. Must meet the water specifications in the contract.
5. Width of roadway?
Some of the road is not 24 feet as required by the grinding contract. I understand there will be sections that cannot be met by the width of the roadway due to the road narrowing in some points. Grind as far as possible to meet the requirement of 24 feet. Ideal is 24 feet wide road.