This is a Conservation Practice specification sheet (#643) that details requirements and guidelines for installing Zeedyk structures in riparian areas and wet meadows. The document outlines four types of low-profile, hand-built treatments made of rock or wood: One Rock Dams, Zuni Bowls, Rock Rundowns, and Media Lunas.

The specifications include detailed construction methods, materials requirements, and site preparation instructions for each structure type. For example, One Rock Dams require angular rock between 6-18 inches in length, with 70-80% between 6-12 inches and 10% between 12-18 inches. The document provides extensive diagrams, photos, and step-by-step installation guidelines. It also specifies maintenance requirements, including annual inspections after peak runoff events and replacement of dislodged materials. A sample project described in the document involves treating a 1,000-foot reach called "Old Cabin" with a Zuni bowl (8x6x1 ft) and One Rock Dam (6x5x1 ft) to address a 2-foot headcut that is lowering the water table and impacting wetland vegetation.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Restoration of Rare or Declining Natural Communities:

Zeedyk Structures for Riparian Areas and Wet Meadows

Conservation Practice 643 - Specification Sheet

Client: Date:

Location: County:

Contract #: Tract/Field:

Planner: Acres:

Practice Description Zeedyk structures are low profile, hand-built treatments made of rock or wood intended to restore hydrologic and ecological function of wet meadows and small streams impacted by head-cutting, gully erosion, and channel incision. The structures help to slow and disperse water, dissipate energy, capture sediment, and increase soil moisture thereby promoting mesic and wetland plant species expansion that prevents further degradation and fosters channel recovery. Typical installation requires multiple structures to achieve desired effects within a reach.

Site Conditions/Objectives Reach ID Length Baseline Conditions Management Objectives Success Criteria

Old Cabin 1000 ft

2 ft high headcut lowering water table. Wetland vegetation shifting to upland species in meadow.

Stop headcut progression.

Preserve 5 ac meadow upstream. Raise bed elevation and water table of incised channel downstream.

No change to 10% increase in sedge and rush cover immediately upstream of headcut.

Sediment capture elevates bed by 1 ft at ORD.

Treatment Specifications

Reach ID Structure No. Structure Type Dimensions (ft)

(L x W x H) Materials Site-Specific Notes

Old cabin 1 Zuni bowl 8x6x1 1.8 cu yds rock

Ensure the rock placement at headcut pour-over is flush with sod

Old cabin 2 One rock dam 6x5x1 1 cu yds rock

Top of dam should match height of inset floodplain upstream

Materials, equipment, and staging instructions

(Provide detailed information on total materials and equipment required for the project. For example, 5 cu yds of angular rock from onsite will be collected to meet building needs, or reference rock quarry specs – Appendix 5. Hand tools needed include: shovels, picks, rock crib, etc. Also describe any specific details in staging this site for work, such as, number of smaller staging piles and location, access restrictions to delivery vehicles, sensitive areas where disturbance should be avoided, etc.)

Planned installation dates

(Insert planned installation dates and other timing guidance, such as, avoid disturbing vegetation during the primary bird nesting and brood rearing periods and abide by regulatory work window requirements)

Conservation Practice 643 – Specification Sheet

Permits, notifications, and stipulations

(List federal/state/local permits obtained and any notification requirements.

Document additional stipulations or conservation measures required to comply with Conference/Biological Opinions/Reports)

Design drawings, plan maps, and additional notes:

See conservation plan map for location of structures. Also refer to attached appendices for standard structure drawings and installation instructions. Site-specific conditions may warrant minor modifications to structure designs to ensure proper function. Seeding not required if surrounding vegetation or seedbank is sufficient for regeneration of desired plants. Should re-vegetation be necessary, refer to appropriate practice specifications (612, 550, or 342).

CLIENT’S ACKNOWLEDGEMENT STATEMENT:

The Client acknowledges that:

a. They have received a copy of the specification and understand the contents and requirements.

b. It shall be the responsibility of the client to obtain all necessary permits and/or rights, and to comply with all ordinances and laws pertaining to the application of this practice.

Accepted by:/s/ Date:

CERTIFICATION:

I have completed a review of the information provided by the client or have conducted a site visit and certify this practice has been applied according to NRCS standards and specifications.

Certified by:/s/ Job title: Date:

Operation and Maintenance At a minimum, structures will be inspected annually after peak runoff events. Typically, structure maintenance and repair is most important following the first runoff event before the structure has the opportunity to fill with sediment and be colonized by vegetation. Rocks or logs that have become dislodged or washed out should be replaced to ensure proper function. Minor adjustments to the original structure may be needed if it appears water is not flowing as desired or is causing unintended erosion.

Because multiple structures operate as a complex within a reach, the failure of an individual structure may not be problematic if undesired impacts are not occurring and management objectives are still being achieved in the planned reach. By the third year, maintenance needs should be minimal.

The structures are designed to initiate restoration of natural processes but additional interventions are often necessary to slowly build incised channels back up to desired floodplain levels. As structures fill with sediment and vegetation, it may be desirable to plan a new project with additional structures on top of or near existing structures to further raise the water table and expand riparian and wet meadow areas.

Appendix 1. One Rock Dam. Figure from Sponholtz, C. and A.C. Anderson (2013). Erosion Control Field Guide.

Quivira Coalition and Watershed Artisans.

Example of a One Rock Dam. Photo from Gunnison Basin Climate Working Group.

Flow

Appendix 2. Zuni Bowl. Figure from Sponholtz, C. and A.C. Anderson (2013). Erosion Control Field Guide.

Example of a Zuni Bowl. Photo from Gunnison Basin Climate Working Group.

One Rock Dam

Zuni Bowl

Appendix 3. Rock Rundown. Primarily applicable in low energy headcuts < 2 ft high. Figure from Sponholtz, C.

and A.C. Anderson (2013). Erosion Control Field Guide. Quivira Coalition and Watershed Artisans.

Example of a Rock Rundown. Photo from Gunnison Basin Climate Working Group.

Appendix 4. Media Luna. Figure from Sponholtz, C. and A.C. Anderson (2013). Erosion Control Field Guide.

Example of a Media Luna. Photo from Gunnison Basin Climate Working Group.

Appendix 5. Log and Fabric Step Falls (Headcut Control Structure For Moist Soils). This structure is used to control headcuts advancing through wet soil areas such as wet meadows, springs, and seeps. The erosive action can be stopped if a healthy mat of wet soil plants can become established to hold the headwall in place. Text and figures from Zeedyk, W.D. and J. Jansens (2009). An Introduction to Erosion Control. Santa Fe, NM: Quivira Coalition. 3rd edition.

Materials Needed

1. Geotextile Fabric (silt fencing fabric in 3 foot widths works well and is convenient to use).

2. Logs: Logs 6 to 10 inches in diameter and varying lengths from 4 to 8 feet long. (For example, bottom tier, 8 feet long, second tier, 6 feet, third tier, 4 feet.) Logs should be straight, trimmed and green, or seasoned, but not rotten. Any protruding knots, limbs, or knobs make stacking very difficult and should be trimmed.

3. Wire: one roll of smooth fencing wire or barbed wire.

4. Fencing staples: 2 inches long, about 2 lbs.

5. Sod clumps: 6” X 6” X 3”. Dig locally.

Tools Needed

1. Shovel (for digging)

2. Pick (for squaring sidewalls)

3. Crowbar (for wedging logs together)

4. Axe (for cutting roots, trimming)

5. Utility knife (for cutting fabric)

6. Claw hammer (for driving staples)

7. Fencing pliers (for cutting wire)

8. Wheel barrow (transport logs, tools, materials)

9. Log carrier (optional – for lifting, carrying logs)

Construction Steps:

1. Prepare the site by “squaring up” the headwall, sidewalls, and bottom of the channel. Eliminate the scour pool and any irregularities (rocks, roots, or indentations) in the channel bottom, sidewalls, or headwall. Use a shovel, spade, pick, or crowbar to shape the site. Save and stockpile sod clumps of wet soil grasses and sedges for use in the final step.

2. When preparation is finished, cut and drape geotextile fabric across the headwall, sidewalls, and channel bottom. Three pieces work better than one. The first should start about 2 feet above the lip of the headwall, extend down the headwall, and cover the channel bottom for 6-8 feet (the length of the bottom tier of logs). The second should be draped over one side wall and part way across the channel bottom. The third should be draped over the opposite sidewall in a like manner. Temporarily anchor the fabric in place by weighting the ends with rock or sod clumps.

Once logs are placed, the extra flap of material will be folded back over the logs.

3. Install logs in the prepared site using as many tiers as necessary to stack them even with the lip of the headwall. (See Figures below). Logs within each tier should be of the same diameter; between tiers, they can be of different diameters. Logs in the bottom tier should be the longest;

the top tier, the shortest. For example, if three tiers are needed, make the bottom tier 8 feet long, the middle tier 6 feet, and the top tier 4 feet long. It is important to wedge logs tightly against the face of the headwall and sidewalls. When all tiers are in place, fold the extra flap of fabric back over the top logs. Using smooth wire and fencing staples, wire each tier of logs together as you go. (Wire tier one logs before installing tier two, etc.) Tamp soil into any open spaces between fabric, headwall, and sidewalls.

4. Working upstream from the lip of headwall, excavate a smooth platform level with the top tier of installed logs and one log-diameter wider on either side of the channel. The platform should extend at least 4 feet upstream from the lip of the headwall. Line the platform with the fabric extending out over the installed logs by 3-4 feet and upstream for 1-1.5 feet.

5. Using logs of equal diameter, install the final tier by wedging and tamping each log firmly in place (see Figure below). The logs should be long enough to extend about 2 feet downstream from the lip of the headwall. Wire this tier together and to the rest of the structure. Tuck the upstream flap of fabric in place along the leading edge (upstream face) of the logs in the final tier.

6. Transplant live green sod clumps of aquatic grasses, sedges, or rushes to the leading edge and sides of the final tier of logs. Completely fill any cracks or holes between the fabric and channel walls with live sod. This is a key step. The success of the log structure depends on your successfully establishing a living mat of wet soil grasses and grass-like plants along the upstream edge and sides of the structure.

7. After installation is complete, return to the site periodically (every 2-3 weeks initially, then less frequently) to fill any developing cracks or holes with fresh sod clumps until a healthy mat of vegetation is successfully established and no new cracks or holes develop.

Example of a Log and Fabric structure before and after installation. Photo from Gunnison Basin Climate Working Group.

2013 - Before 2016 - After

Before sorting After sorting

Appendix 5. “Recipe” for sourcing rock for Zeedyk structures from quarries when on-site materials are insufficient.

From Liz With, Shawn Conner, and Brooke Vasquez, Gunnison Basin, Colorado (2017).

Specification: The rip-rap rock mix for restoration structures shall be angular granitic rock between 6-18 inches (in length) with the following composition:

• 70-80% between 6-12 inches

• 10% should be 12-18 inches

• A small percentage (5-10%) should consist of gravel and rock fragments

Description: The recipe will slightly depend on the quarry the rock is being pulled from and the proportion of the size of the rock being blasted. You may need to adjust the ratios a little to get the rock right for your local situation.

70% of the material should be screened through a 6" grizzly (rock sorter with only vertical bars - see photo to right). This will allow mostly stuff less than 6" through. Then take the over-burden that was already screened off (so you minimize the amount of small stuff being added) and put it over a 1' grizzly for the remaining 30%. This will ensure that rock much larger than 1' will be removed. Since the grizzly only has vertical bars, there will be slightly larger material that is able to fit through on a smaller axis, but the majority of the materials delivered should be moveable by hand without the need for heavy machinery. It does mean sorting the material twice, which the quarry may charge an extra fee for, but it makes it worth it because all the rock delivered is usable and without much waste. This means that you are able to reduce hauling costs which, in most situations, is much more expensive than material costs.

Other considerations: The pits need to be weed free and as little dirt as possible should be hauled with the rock.

If you are working on a steeper area or one with more water, you may want to reduce the amount of small rock and increase the large stuff to deal with the increased velocities. If you have a quarry that you know your producers will be working with regularly, it is more than worth it to take a trip out to that quarry and look at the material available and talk with the operator about what the project needs. Since these are natural materials, people have to deal with a lot of variability—it’s not like buying pipe. There is an increased need to ensure that the materials acquired are actually appropriate to completing the task at hand.