140L5725Q0003_-_Attachment_010_-_Bid_Schedule_updated.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- BLM Stream and Wetland Meadow Restoration
- Solicitation number
- 140L5725Q0003
About this file
This is a bid schedule spreadsheet for stream and wetland meadow restoration work for the BLM Utah Region. The schedule is divided into multiple Contract Line Item Numbers (CLINs) covering both base and optional tasks for stream restoration and wetland/mesic meadow restoration projects.
The work includes detailed assessments, restoration planning, monitoring activities, and implementation across multiple phases. For stream restoration, tasks involve LTPBR (Low-Tech Process Based Restoration) techniques, including providing training for 30 students, materials like posts and willows, and monitoring via drone flights and surveys. For wetland/mesic meadow restoration, tasks include Zeedyke techniques implementation, providing training materials like "Let the Water do the Work" handbook, and equipment such as UTVs for rock hauling. Each CLIN section contains similar task structures requiring condition assessments, restoration plans, monitoring, permitting, and final reporting. The spreadsheet is formatted as a pricing template with blank fields for contractors to input their costs.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Stream and Wetland Meadow Restoration Bid Schedule | ||||||||||||||||||
| Base Year (Stream Restoration) | CLIN 10 | Description of Work | Price | Optional Task 1 (Stream Restoration) | CLIN 30 | Description of Work | Price | Tasks | CLIN 50 | Description of Work | Price | Tasks | CLIN 70 | Description of Work | Price | |||
| 1 | Complete a detailed riparian and geomorphic condition assessment using a variety of tools (e.g., BRAT, RCAT) | $ - 0 | 1 | Complete a detailed riparian and geomorphic condition assessment using a variety of tools (e.g., BRAT, RCAT) | $ - 0 | Optional Task 2 (Stream Restoration) | 1 | Complete a detailed riparian and geomorphic condition assessment using a variety of tools (e.g., BRAT, RCAT) | $ - 0 | Optional Task 3 (Stream Restoration) BLM will Construct Structures (No Training Required) | 1 | Complete a detailed riparian and geomorphic condition assessment using a variety of tools (e.g., BRAT, RCAT) | $ - 0 | |||||
| 2 | Complete a restoration plan using LTPBR techniques and principles | $ - 0 | 2 | Complete a restoration plan using LTPBR techniques and principles | $ - 0 | 2 | Complete a restoration plan using LTPBR techniques and principles | $ - 0 | 2 | Complete a restoration plan using LTPBR techniques and principles | $ - 0 | |||||||
| 3 | Pre and Post Monitoring (e.g., drone flights, aerial imagery, stream surveys, photos) | $ - 0 | 3 | Pre and Post Monitoring (e.g., drone flights, aerial imagery, stream surveys, photos) | $ - 0 | 3 | Pre and Post Monitoring (e.g., drone flights, aerial imagery, stream surveys, photos) | $ - 0 | 3 | Pre and Post Monitoring (e.g., drone flights, aerial imagery, stream surveys, photos) | $ - 0 | |||||||
| 4 | Restoration Design Plan and Permitting (e.g., stream alteration permits) (Final Submitted to BLM) | $ - 0 | 4 | Restoration Design Plan and Permitting (e.g., stream alteration permits) (Final Submitted to BLM) | $ - 0 | 4 | Restoration Design Plan and Permitting (e.g., stream alteration permits) (Final Submitted to BLM) | $ - 0 | 4 | Restoration Design Plan and Permitting (e.g., stream alteration permits) (Final Submitted to BLM) | $ - 0 | |||||||
| 5 | Provide materials (e.g., LTPBR handbook and pocket guide) to stakeholders and partners (30 students) | $ - 0 | 5 | Provide materials (e.g., LTPBR handbook and pocket guide) to stakeholders and partners (30 students) | $ - 0 | 5 | Project Implementation (provide materials (e.g., posts, willow, hydraulic post pounder, etc…) and contractor will build LTPBR structures) | $ - 0 | 5 | Final Monitoring Report | $ - 0 | |||||||
| 6 | Provide on-the-ground training (e.g., 4-days (40 hours) (30 students) | $ - 0 | 6 | Provide on-the-ground training (e.g., 4-days (40 hours) (30 students) | $ - 0 | 6 | Final Monitoring Report | $ - 0 | CLIN 70 Total | $ - 0 | ||||||||
| 7 | Provide Materials and equipment to complete the on-the-ground training (e.g., posts, willow, hydraulic post pounder, etc…) | $ - 0 | 7 | Provide Materials and equipment to complete the on-the-ground training (e.g., posts, willow, hydraulic post pounder, etc…) | $ - 0 | CLIN 50 Total | $ - 0 | CLIN 80 | Description of Work | Price | ||||||||
| 8 | Final Monitoring Report | $ - 0 | 8 | Final Monitoring Report | $ - 0 | CLIN 60 | Optional Task 2 Stream Restoration Total | $ - 0 | Optional Task 3 (Stream Restoration) BLM will Construct Structures (No Training Required) | 1 | Complete a detailed wetland and mesic meadow condition assessment | $ - 0 | ||||||
| CLIN 10 Total | $ - 0 | CLIN 30 Total | $ - 0 | Optional Task 2 (Wetland and Mesic Meadow Restoration | 1 | Complete a detailed wetland and mesic meadow condition assessment | $ - 0 | 2 | Complete a restoration plan utilizing Zeedyke techniques and principles | $ - 0 | ||||||||
| 2 | Complete a restoration plan utilizing Zeedyke techniques and principles | $ - 0 | 3 | Pre and Post Monitoring (e.g., drone flights, aerial imagery, wetland and mesic meadow surveys, photos) | $ - 0 | |||||||||||||
| CLIN 20 | Description of Work | Price | CLIN 40 | Description of Work | Price | 3 | Pre and Post Monitoring (e.g., drone flights, aerial imagery, wetland and mesic meadow surveys, photos) | $ - 0 | 4 | Restoration Design Plan and Permitting (e.g., stream alteration permits) (Final Submitted to BLM) | $ - 0 | |||||||
| Base Year (Wetland/Mesic Meadow Restoration) | 1 | Complete a detailed wetland and mesic meadow condition assessment | $ - 0 | Optional Task 1 (Wetland/Mesic Meadow Restoration) | 1 | Complete a detailed wetland and mesic meadow condition assessment | $ - 0 | 4 | Restoration Design Plan and Permitting (e.g., stream alteration permits) (Final Submitted to BLM) | $ - 0 | 5 | Final Monitoring Report | $ - 0 | |||||
| 2 | Complete a restoration plan utilizing Zeedyke techniques and principles | $ - 0 | 2 | Complete a restoration plan utilizing Zeedyke techniques and principles | $ - 0 | 5 | Project Implementation (e.g., rock, UTVs haul rock to project site, etc…) and contractor will build Zeedyke structures | $ - 0 | CLIN 80 Total | $ - 0 | ||||||||
| 3 | Pre and Post Monitoring (e.g., drone flights, aerial imagery, wetland and mesic meadow surveys, photos) | $ - 0 | 3 | Pre and Post Monitoring (e.g., drone flights, aerial imagery, wetland and mesic meadow surveys, photos) | $ - 0 | 6 | Final Monitoring Report | $ - 0 | ||||||||||
| 4 | Restoration Design Plan and Permitting (e.g., permitting) (Final Submitted to BLM) | $ - 0 | 4 | Restoration Design Plan and Permitting (e.g., permitting) (Final Submitted to BLM) | $ - 0 | CLIN 60 Total | $ - 0 | |||||||||||
| 5 | Provide materials (e.g., Let the Water do the Work: Induced Meandering, an Evolving Method for Restoring Incised Channels) to stakeholders and partners (30 students) | $ - 0 | 5 | Provide materials (e.g., Let the Water do the Work: Induced Meandering, an Evolving Method for Restoring Incised Channels) to stakeholders and partners (30 students) | $ - 0 | |||||||||||||
| 6 | Provide on-the-ground training (e.g., 4-days (40 hours) (30 students) | $ - 0 | 6 | Provide on-the-ground training (e.g., 4-days (40 hours) (30 students) | $ - 0 | |||||||||||||
| 7 | Provide Materials and equipment to complete the on-the-ground training (e.g., rock, UTVs haul rock to project site, etc…) | $ - 0 | 7 | Provide Materials and equipment to complete the on-the-ground training (e.g., rock, UTVs haul rock to project site, etc…) | $ - 0 | |||||||||||||
| 8 | Final Monitoring Report | $ - 0 | 8 | Final Monitoring Report | $ - 0 | |||||||||||||
| CLIN 20 Total | $ - 0 | CLIN 40 Total | $ - 0 |
CLIN 10 & CLIN 20 Grand Total $ - 0