140L5725Q0003_Amendment_0001_0001.pdf

PDF 583 KB Posted

Attached to
BLM Stream and Wetland Meadow Restoration
Solicitation number
140L5725Q0003
Issued by

About this file

This is a Request for Quote (RFQ) Amendment 0001 issued by the Bureau of Land Management Utah Region for stream and wetland meadow restoration services in Rich County, Utah. The solicitation (140L5725Q0003) is set aside for small businesses under NAICS code 541620 with a $19M size standard and requires two main projects: 1) Implementation of Low-Tech Process Based Restoration (LTPBR) to reduce erosion and improve habitat along approximately 2 miles of BLM-administered streams, and 2) Implementation of Zeedyke techniques to reduce erosion and improve watershed function.

The period of performance is January 10, 2025 to January 9, 2027, with questions due by December 6, 2024 at 1:00 PM Mountain Time and quotes due by December 16, 2024 at 3:00 PM Mountain Time. The award will be made using a tradeoff approach evaluating key personnel, technical approach, schedule and price, with technical factors considered more important than price. Base requirements include condition assessments, restoration planning, monitoring, design plans, permitting, training for 30 students, and materials/equipment. The contract includes optional tasks for additional stream and wetland restoration work. All submissions must be sent via email to the Contract Specialist Mark Renforth.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

LUA

SALT LAKE CITY UT 84101

440 WEST 200 SOUTH, SUITE 500

BLM UT-STATE OFC ADM SVCS BR(UT952)

0011276645 CODE 16. ADMINISTERED BYCODE

X

X

X

541620

SIZE STANDARD:

100.00 % FOR:SET ASIDE:UNRESTRICTED ORLUA

REQUEST FOR

PROPOSAL

(RFP)

INVITATION

FOR BID (IFB)

10. THIS ACQUISITION ISCODE

REQUEST FOR

QUOTE (RFQ)

14. METHOD OF SOLICITATION

13b. RATING

NORTH AMERICAN INDUSTRY

CLASSIFICATION STANDARD

(NAICS):

SMALL BUSINESS

01/03/2025 1500 MS

12/03/2024

334-846-2890Mark Renforth (No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

140L5725Q0003

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 37 0040680006OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

TELEPHONE NO.

17a. CONTRACTOR/

Salt Lake City UT 84116 491 North John Glenn Road

BLM-UT SALT LAKE FIELD OFFICE

15. DELIVER TO

SALT LAKE CITY UT 84101

440 WEST 200 SOUTH, SUITE 500

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$19

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FREE ON BOARD

(FOB) DESTINATION UNLESS

BLOCK IS MARKED

11.

SEE SCHEDULEX

12. DISCOUNT TERMS THIS CONTRACT IS A RATED

ORDER UNDER THE DEFENSE

PRIORITIES AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

8(A)

BLM UT-STATE OFC ADM SVCS BR(UT952)

WOMEN-OWNED SMALL

BUSINESS (WOSB)

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

BLM Stream and Wetland Meadow Restoration Period of Performance: 01/10/2025 to 01/09/2027

00010 Base Year Stream Restoration to include:

1.) Complete a detailed riparian and geomorphic condition assessment using a variety of tools (e.g., BRAT, RCAT) 2.) Complete a restoration plan using LTPBR techniques and principles

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

X

XX

DATED

Tori Blunt Mayes

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Government Use Only)

OFFER

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT: REFERENCE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 11/2021) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

3.) Pre and Post Monitoring (e.g., drone flights, aerial imagery, stream surveys, photos)

4.) Restoration Design Plan and Permitting (e.g., stream alteration permits) (Final Submitted to

BLM)

5.) Provide materials (e.g., LTPBR handbook and pocket guide) to stakeholders and partners (30 students)

6.)Provide on-the-ground training (e.g., 4-days

(40 hours) (30 students)

7.)Provide Materials and equipment to complete the on-the-ground training (e.g., posts, willow, hydraulic post pounder, etc.)

8.)Final Monitoring Report

00020 Base Year Wetland/Mesic Meadow Restoration to include:

1.) Complete a detailed wetland and mesic meadow condition assessment

2.) Complete a restoration plan utilizing Zeedyke techniques and principles

3.) Pre and Post Monitoring (e.g., drone flights, aerial imagery, stream surveys, photos)

4.) Restoration Design Plan and Permitting (e.g., Continued ...

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37 2 of

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 37

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140L5725Q0003 stream alteration permits) (Final Submitted to

BLM)

5.) Provide materials (e.g., Let the Water do the

Work: Induced Meandering, an Evolving Method for

Restoring Incised Channels) to stakeholders and partners (30 students)

6.) Provide on-the-ground training (e.g., 4-days

(40 hours) (30 students)

7.) Provide Materials and equipment to complete the on-the-ground training (e.g., rock, UTVs haul rock to project site, etc.)

8.) Final Monitoring Report

00030 Optional Task 1 Stream Restoration may include any or all of the following:

1.) Complete a detailed riparian and geomorphic condition assessment using a variety of tools

(e.g., BRAT, RCAT)

2.) Complete a restoration plan using LTPBR techniques and principles

3.) Pre and Post Monitoring (e.g., drone flights, aerial imagery, stream surveys, photos)

4.) Restoration Design Plan and Permitting (e.g., stream alteration permits) (Final Submitted to

BLM)

5.) Provide materials (e.g., LTPBR handbook and pocket guide) to stakeholders and partners (30 students)

6.) Provide on-the-ground training (e.g., 4-days

(40 hours) (30 students)

7.) Provide Materials and equipment to complete the on-the-ground training (e.g., posts, willow, hydraulic post pounder, etc.)

8.) Final Monitoring Report

(Option Line Item)

00040 Optional Task 1 Wetland/Mesic Meadow Restoration may include any or all of the following:

1.) Complete a detailed wetland and mesic meadow

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

4 37

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140L5725Q0003 condition assessment

2.) Complete a restoration plan utilizing Zeedyke techniques and principles

3.) Pre and Post Monitoring (e.g., drone flights, aerial imagery, wetland and mesic meadow surveys, photos)

4.) Restoration Design Plan and Permitting (e.g., permitting) (Final Submitted to BLM)

5.) Provide materials (e.g., Let the Water do the

Work: Induced Meandering, an Evolving Method for

Restoring Incised Channels) to stakeholders and partners (30 students)

6.) Provide on-the-ground training (e.g., 4-days

(40 hours) (30 students)

7.) Provide Materials and equipment to complete the on-the-ground training (e.g., rock, UTVs haul rock to project site, etc.)

8.) Final Monitoring Report

(Option Line Item)

00050 Optional Task 2 Stream Restoration may include any or all of the following:

1.) Complete a detailed riparian and geomorphic condition assessment using a variety of tools

(e.g., BRAT, RCAT)

2.) Complete a restoration plan using LTPBR techniques and principles

3.) Pre and Post Monitoring (e.g., drone flights, aerial imagery, stream surveys, photos)

4.) Restoration Design Plan and Permitting (e.g., stream alteration permits) (Final Submitted to

BLM)

5.) Project Implementation (provide materials

(e.g., posts, willow, hydraulic post pounder, etc.) and contractor will build LTPBR structures)

6.) Final Monitoring Report

(Option Line Item)

00060 Optional Task 2 Wetland and Mesic Meadow

Restoration may include any or all of the following:

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

5 37

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140L5725Q0003

1.) Complete a detailed wetland and mesic meadow condition assessment

2.) Complete a restoration plan utilizing Zeedyke techniques and principles

3.) Pre and Post Monitoring (e.g., drone flights, aerial imagery, wetland and mesic meadow surveys, photos)

4.) Restoration Design Plan and Permitting (e.g., stream alteration permits) (Final Submitted to

BLM)

5.) Project Implementation (e.g., rock, UTVs haul rock to project site, etc.) and contractor will build Zeedyke structures

6.) Final Monitoring Report

(Option Line Item)

00070 Optional Task 3 Stream Restoration BLM will

Construct Structures (No Training Required) may include any or all of the following:

1.) Complete a detailed riparian and geomorphic condition assessment using a variety of tools

(e.g., BRAT, RCAT)

2.) Complete a restoration plan using LTPBR techniques and principles

3.) Pre and Post Monitoring (e.g., drone flights, aerial imagery, stream surveys, photos)

4.) Restoration Design Plan and Permitting (e.g., stream alteration permits) (Final Submitted to

BLM)

5.) Final Monitoring Report

(Option Line Item)

00080 Optional Task 3 Stream Restoration BLM will

Construct Structures (No Training Required) may include any or all of the following:

1.) Complete a detailed wetland and mesic meadow condition assessment

2.) Complete a restoration plan utilizing Zeedyke techniques and principles

3.) Pre and Post Monitoring (e.g., drone flights, aerial imagery, wetland and mesic meadow surveys, Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

6 37

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140L5725Q0003 photos)

4.) Restoration Design Plan and Permitting (e.g., stream alteration permits) (Final Submitted to

BLM)

5.) Final Monitoring Report

(Option Line Item)

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Request for Quotation 140L5725Q0003 Amendment 0001

SLFO Upper Bear River Stream Structures/Zeedykes

Type of Contract: Firm Fixed Priced (FFP), Single Award Contract Place of Performance: Rich County, UT Period of Performance: 01/01/2025 – 12/31/2029.

NAICS: 541620 SIZE STD: $19.0M SET-ASIDE: Total Small Business

Bureau of Land Management Contacts

Contracting Officer (CO) Contract Specialists (CS) (Primary POC)

Program Official

Name: Tori Blunt Mayes Mark Renforth

Dan Fletcher

Email: tbluntmayes@blm.gov mrenforth@blm.gov dfletcher@blm.gov

Quote Submittal Information:

Site Visit: No formal site visit will be held.

Questions Due Date: December 6, 2024, at 1:00 PM Mountain Time All questions must be submitted in writing via email to mrenforth@blm.gov with subject line: RFQ 140L5725Q0003 – SLFO Upper Bear River Stream Structures/Zeedykes. No questions will be accepted via phone calls.

Quote Due Date: December 16, at 3:00 PM Mountain Time via email to mrenforth@blm.gov. (See Quotation Submittal below)

Basis For Award: Quotes will be evaluated using a Low-Price approach. (See Basis for Contract Award below)

SOLICITATION NO: 140L5725Q0003 Amendment 0001

PROJECT DESCRIPTION: SLFO Upper Bear River Stream/Zeedykes

GENERAL

(a) The Bureau of Land Management (BLM) is seeking quotations for environmental services as attached in the accompanying project documentation (see attachments). The BLM intends to conduct this acquisition by use of simplified acquisition procedures in accordance with FAR Part 13. A single contract award will be made to the responsible quoter whose quotation represents the best value in accordance with the evaluation methodology outlined in the “basis for contract award.”

(b) To assure timely and equitable evaluation of quotations, respondents are cautioned to strictly comply with all instructions within this solicitation to ensure submission of a complete quote. Respondents are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and any stated technical requirements. Failure to adhere to solicitation requirements, at the time of submission, may result in a respondent’s quote being deemed unacceptable to the Government and the respondent may be eliminated from award consideration. It is the responsibility of respondents to ensure their quote is received by the Government at the designated due date and time.

(c) Quoters are cautioned to submit adequate information to enable the Government to fully ascertain each respondent’s capability to perform the requirements in accordance with the requirements of the request for quotation (RFQ).

(d) If a respondent believes that requirements in these instructions contain an error, omission, or are otherwise flawed, the respondent shall immediately notify the contracting officer via email with supporting rationale prior to the question deadline specified on the cover page of this document.

(e) This RFQ does not commit the Government to any costs incurred during the preparation and submission of quotes or for any other costs incurred by any firm submitting a quote in response to this solicitation. Note specifically that the respondent will not be participating in a sealed bid procurement process. Issuance of this RFQ does not constitute an award commitment on behalf of the Government.

(f) Quotations must be valid for a minimum of 60 days.

(g) Respondents must complete and maintain an active registration in the System for Award Management (SAM) at SAM.gov prior to close of solicitation. The Government will obtain representations and certifications through this system.

(h) All questions should be emailed directly to the contracting office primary POC by the deadline listed on the first page of this document. Only written questions will be considered and responded to by the Government. Responses to questions will be posted as an amendment to the solicitation. Respondents shall not contact any Government personnel related to this requirement other than contracting office personnel.

(i) Depending on the value of the subsequent contract award, the awardee may be required to submit either Alternative Payment Protections or Performance/Payment Bonds. Refer to the “Post-Award Bonds and Alternative Payment Protections” requirements as outlined in the “Special Contract Requirements” section of this solicitation.

LIST OF ATTACHMENTS

Number Description Number of Pages

001 Upper Bear River Stream Structure SOW 8 002 UBR-Map Stream Structure 1 003 Upper Bear River-Stream Structures Example 26 004 Stream Structure(BDA-PALS) Project Evaluation Criteria 3 005 Upper Bear River Wet-Mesic Meadow SOW ZeeDykes 8 006 Range Technical_Note_40_Gunnison_Zeedyk-Structures_5-18 51 007 Zeedyke Structure for Riparian Areas and Wet Meadows-NRCS Specification Sheet 13 008 UBR-Map Zeedyke Structure 1 009 Zeedyke Project Evaluation Criteria 3 010 Bid Schedule 1 011 Wage Determination 2015-5491 05.02.2024 11

BASIS FOR CONTRACT AWARD

The Government anticipates awarding a firm-fixed price construction contract to a registered/certified small business concern, using FAR Part 13 Simplified Acquisition Procedures. The Government contemplates a single award contract resulting from this solicitation.

Quotes will be evaluated using a tradeoff approach. This process permits tradeoffs among price and non-price factors and allows the Government to accept other than the lowest priced quote. The Government will perform a comparative evaluation (comparing quotes to each other) to select the contractor that is best suited and provides the best value, considering the evaluation factors in this solicitation.

The Government's objective is to obtain the best overall value considered necessary to achieve the project objectives, with a realistic and reasonable price. The Government reserves the right to make an award to other than the lowest-priced quoter if the superior technical submission, warrants paying a premium. The technical (non-price) factors listed below, when combined, are considered more important than price.

Formal ratings and scoring will NOT be used, rather the evaluators will compare one quote to another, factor by factor and then overall at the end. Should initial quotes not provide the Government with a satisfactory total solution, the Government reserves the right to engage with quoting firms to obtain a better understand and to reach a best value determination. The Government reserves the right to engage all, some, or none of the firms submitting quotations in response to this RFQ. Once the Government determines that a firm is the best-suited (e.g. the apparent successful awardee), the Government reserves the right to engage with only that firm to address any remaining issues, if necessary, and finalize a contract with that firm. These issues may include technical and price. If the parties cannot successfully address any remaining issues, as determined pertinent at the sole discretion of the Government, the Government reserves the right to engage the next best-suited firm based on the original analysis and address any remaining issues. Once the Government has engaged the next best-suited firm, no further engagements with the previous firm will be entertained until after the contract has been awarded. This process will continue until an agreement is successfully reached and a contract is awarded.

Quotes will be evaluated using the criteria listed in this section. Noncompliance with the Request for Quote (RFQ) requirements may be grounds to eliminate the quote from consideration for contract award. Failure to include all information requested may adversely affect the evaluation. A quote that is orderly and sufficiently documented will enable the Government to perform a thorough and fair evaluation.

After solicitation closing, the Contracting Officer will conduct quote compliance review for determination of basic quote adequacy prior to providing commencing evaluation. Failure to provide a complete quote identified in the solicitation may result in the quote being removed from further consideration for award.

EVALUATION FACTORS FOR CONTRACT AWARD

1. KEY PERSONNEL

2. TECHNICAL APPROACH

3. SCHEDULE

4. PRICE

Attachment 004 and Attachment 009 provide detailed evaluation criterion for each project. language

Clauses

52.212-4 CONTRACT TERMS AND CONDITIONS –COMMERCIAL PRODUCTS ANDCOMMERCIAL

SERVICES (NOV 2023)

---Addendum to 52.212-4---

DIAR 1452.201-70 AUTHORITIES AND DELEGATIONS (SEP 2011)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph

(e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph(d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

(End of Clause)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):Federal Acquisition Regulation:

https://www.acquisition.gov/farDepartment of the Interior Acquisition Regulation:

https://www.acquisition.gov/diar

(End of clause)

DOI-AAAP-0028 ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS-

INVOICEPROCESSING PLATFORM (IPP) (FEB 2021)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

'Payment request' means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is:

https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

Contractor's Commercial Invoice to include all elements of a Proper Invoice pursuant to FAR 52.212-4(g).

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment.

The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone(866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 30 days contract expiring. .

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 30days;

provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least (SEE QUESTION 2) before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years 0 months.

--- End of Addendum to 52.212-4---

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES

OREXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

(MAY2024)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements(Jan

2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance

Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31U.S.C.

3903 and 10 U.S.C. 3801).

(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 (

19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[X] (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I (Nov 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).

[ ] (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509)).

[ ] (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

(4) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) ( 41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

[ ] (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020)(Pub. L. 109-282) ( 31 U.S.C. 6101 note).

[ ] (6) [Reserved].

[ ] (7) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743of Div. C).

[ ] (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct2016) (Pub. L. 111-117, section 743 of Div. C).

[X] (9) 52.204-27 Prohibition on a ByteDance Covered Application (JUN 2023)

(10) 52.204–28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (Dec 2023) ( Pub. L. 115–390, title II).

[X] (11)(i) 52.204–30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (Dec2023) ( Pub. L. 115–390, title II).

(ii) Alternate[ ] I (Dec 2023) of 52.204–30.

[X] (12) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Nov 2021) (31 U.S.C. 6101 note).

[ ] (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct2018) (41 U.S.C. 2313).

[ ] (14) [Reserved] [ ] (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022) (15 U.S.C. 657a).

[ ] (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C.

657a).

(17) [Reserve[ ]d]

[X] (18) (i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

[ ] (ii) Alternate I (Mar 2020) of 52.219-6.

[ ] (19) (i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

[ ] (ii) Alternate I (Mar 2020) of 52.219-7.

[X](20) 52.219-8, Utilization of Small Business Concerns (FEB 2024) (15 U.S.C. 637(d)(2) and (3)).

[ ] (21) (i) 52.219-9, Small Business Subcontracting Plan (Sep 2023) (15 U.S.C. 637(d)(4)).

[ ] (ii) Alternate I (Nov 2016) of 52.219-9.

[ ] (iii) Alternate II (Nov 2016) of 52.219-9.

[ ] (iv) Alternate III (Jun 2020) of 52.219-9.

[ ] (v) Alternate IV (Sep 2023) of 52.219-9 [ ] (22) (i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)).

[ ] (ii) Alternate I (Mar 2020) of 52.219-13.

[X](23) 52.219-14, Limitations on Subcontracting (OCT 2022) (15 U.S.C. 637(a)(14))(Deviation

OCT2022).

[ ] (24) 52.219-16, Liquidated Damages-Subcontracting Plan (Sep 2021) (15 U.S.C. 637(d)(4)(F)(i)).

[ ] (25) 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (FEB 2024) (15 U.S.C.657f).

[X] (26) (i) 52.219-28, Post Award Small Business Program Representation (Feb 2024) (15 U.S.C.632(a)(2)).

[ ] (ii) Alternate I (MAR 2020) of 52.219-28.

[ ] (27) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Oct 2022) (15 U.S.C. 637(m)).

[ ] (28) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Oct 2022) (15 U.S.C. 637(m)).

[ ] (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar 2020) (15

U.S.C.644(r)).

[X] (30) 52.219-33, Nonmanufacturer Rule (Sep 2021) (15U.S.C. 637(a)(17)).

[X] (31) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).

[ ] (32) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (FEB 2024) (E.O.13126).

[X] (33) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

[X] (34) (i) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).

[ ] (ii) Alternate I (Feb 1999) of 52.222-26.

[X] (35) (i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) (38 U.S.C. 4212).

[ ] (ii) Alternate I (Jul 2014) of 52.222-35.

[X] (36) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793).

[ ] (ii) Alternate I (Jul 2014) of 52.222-36.

[X] (37) 52.222-37, Employment Reports on Veterans (Jun 2020) (38 U.S.C. 4212).

[ ] (38) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec2010) (E.O. 13496).

[X] (39) (i) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O.13627).

[ ] (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

[ ] (40) 52.222-54, Employment Eligibility Verification (May 2022). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in 22.1803.)

[ ] (41) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items(May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

[ ] (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

[ ](42) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (May 2024) ( 42 U.S.C. 7671, et seq.).

[ ](43) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (May 2024) ( 42 U.S.C. 7671, et seq.).

[ ](44) 52.223-20, Aerosols (May 2024) ( 42 U.S.C. 7671, et seq.).

[ ](45) 52.223-21, Foams (May 2024) ( 42 U.S.C. 7671, et seq.).

[ ] (47) (i) 52.224-3 Privacy Training (Jan 2017) (5 U.S.C. 552 a).

[ ] (ii) Alternate I (Jan 2017) of 52.224-3.

[ ] (48) (i) 52.225-1, Buy American-Supplies (Oct 2022) (41 U.S.C. chapter 83).

[X] (49) (i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (NOV 2023) (19 U.S.C.3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter 29(sections 4501-4732), Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109- 283,110-138, 112-41, 112-42, and 112-43.

[ ] (ii) Alternate I [Reserved].

[ ] (iii) Alternate II (Dec 2022) of 52.225-3.

[ ] (iv) Alternate III (NOV 2023) of 52.225-3.

[ ] (50) 52.225-5, Trade Agreements (NOV 2023) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

[X] (51) 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

[ ] (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008;

10U.S.C. Subtitle A, Part V, Subpart G Note).

[ ] (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

[ ] (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42U.S.C. 5150).

[X](55) 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024)( E.O. 13513).

[ ] (56) 52.229-12, Tax on Certain Foreign Procurements (Feb 2021).

[X] (57) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial Services (Nov 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

[ ] (58) 52.232-30, Installment Payments for Commercial Products and Commercial Services (Nov2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

[X] (59) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (Oct 2018)(31 U.S.C. 3332).

[ ] (60) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management(Jul 2013) (31 U.S.C. 3332).

[ ] (61) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).

[ ] (62) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

[ ] (63) 52.242-5, Payments to Small Business Subcontractors (Jan 2017) (15 U.S.C. 637(d)(13)).

[ ] (64) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2021) (46U.S.C. 55305 and 10 U.S.C. 2631).

[ ] (ii) Alternate I (Apr 2003) of 52.247-64.

[ ] (iii) Alternate II (Nov 2021) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[X] (1) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter67).

[X] (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41U.S.C. chapter 67).

This Statement is for Information Only: It is not a Wage Determination

Employee Class Monetary Wage‐Fringe Benefits

[List as necessary]

[X] (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment(Multiple Year and Option Contracts) (Aug 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

[ ] (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment(May 2014) ( 29U.S.C.206 and 41 U.S.C. chapter 67).

[ ] (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C.

chapter 67).

[ ] (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) (41 U.S.C. chapter 67).

[ ] (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022).

[ ] (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2022) (E.O. 13706).

[ ] (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) (42 U.S.C.1792).

(c) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records-Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(d) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the

Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1), in a subcontract for commercial products or commercial services. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) ( 41 U.S.C. 3509).

(ii) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) ( 41 U.S.C. 4712).

(iii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(iv) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).

(v) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance

Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(vi) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of Division Rof Pub.

L. 117-328).

(vii) (A) 52.204–30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (Dec 2023) (Pub. L.

115–390, title II).

(B) Alternate I (Dec 2023) of 52.204–30.

(viii) 52.219-8, Utilization of Small Business Concerns (Feb 2024) ( 15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(ix) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

(x) 52.222-26, Equal Opportunity (Sep 2015) (E.O.11246).

(xi) 52.222-35, Equal Opportunity for Veterans (Jun 2020) ( 38 U.S.C. 4212).

(xii) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) ( 29 U.S.C. 793).

(xiii) 52.222-37, Employment Reports on Veterans (Jun 2020) ( 38 U.S.C. 4212).

(xiv) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010)(E.O.

13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(xv) 52.222-41, Service Contract Labor Standards (Aug 2018) ( 41 U.S.C. chapter 67).

(xvi) (A) 52.222-50, Combating Trafficking in Persons (Nov 2021) ( 22 U.S.C. chapter 78 and E.O13627).

(B) Alternate I (Mar 2015) of 52.222-50 ( 22 U.S.C. chapter 78 and E.O. 13627).

(xvii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) ( 41 U.S.C. chapter67).

(xviii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (May 2014) ( 41 U.S.C. chapter 67).

(xix) 52.222-54, Employment Eligibility Verification (May 2022) (E.O. 12989).

(xx) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022).

(xxi) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2022) (E.O. 13706).

(xxii) (A) 52.224-3, Privacy Training (Jan 2017) ( 5 U.S.C. 552a).

(B) Alternate I (Jan 2017) of 52.224-3.

(xxiii) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10U.S.C. Subtitle A, Part V, Subpart G Note).

(xxiv) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) ( 42 U.S.C.1792).

Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xxv) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31U.S.C.

3903 and 10 U.S.C. 3801). Flow down required in accordance with paragraph (c) of 52.232-40.

(xxvi) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2021) ( 46 U.S.C.55305 and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the Contractor may include in its subcontracts for commercial products and commercial services a minimal number of additional clauses necessary to satisfy its contractual obligations.

Contract Documents, Exhibits, or Attachments

Provisions

52.212-1 INSTRUCTIONS TO OFFERORS–COMMERCIAL PRODUCTS AND

COMMERCIALSERVICES (SEP 2023)

---Addendum to 52.212-1---

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

Federal Acquisition Regulation: https://www.acquisition.gov/farDepartment of the Interior Acquisition Regulation: https://www.acquisition.gov/diar

(End of provision)

52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)

DIAR 1452.215-71 USE AND DISCLOSURE OF PROPOSAL INFORMATION -- DEPARTMENT

OFTHE INTERIOR (APR 1984)

(a) Definitions. For the purposes of this provision and the Freedom of Information Act (5 U.S.C. 552), thefollowing terms shall have the meaning set forth below:

(1) "Trade Secret" means an unpatented, secret, commercially valuable plan, appliance, formula, or process, which is used for making, preparing, compounding, treating or processing articles or materials which are trade commodities.

(2) "Confidential commercial or financial information" means any business information (other than trade secrets) which is exempt from the mandatory disclosure requirement of the Freedom of Information Act, 5 U.S.C. 552. Exemptions from mandatory disclosure which may be applicable to business information contained in proposals include exemption (4), which covers "commercial and financial information obtained from a person and privileged or confidential," and exemption (9), which covers "geological and geophysical information, including maps, concerning wells."

(b) If the offeror, or its subcontractor(s), believes that the proposal contains trade secrets or confidential commercial or financial information exempt from disclosure under the Freedom of Information Act, (5 U.S.C. 552), the cover page of each copy of the proposal shall be marked with the following legend: “The information specifically identified on pages ______ of this proposal constitutes trade secrets or confidential commercial and financial information which the offeror believes to be exempt from disclosure under the Freedom of Information Act. The offeror requests that this information not be disclosed to the public, except as may be required by law. The offeror also requests that this information not be used in whole or part by the government for any purpose other than to evaluate the proposal, except that if a contract is awarded to the offeror as a result of or in connection with the submission of the proposal, the Government shall have the right to use the information to the extent provided in the contract."

(c)The offeror shall also specifically identify trade secret information and confidential commercial and financial information on the pages of the proposal on which it appears and shall mark each such page with the following legend: “This page contains trade secrets or confidential commercial and financial information which the offeror believes to be exempt from disclosure under the Freedom of Information Act and which is subject to the legend contained on the cover page of this proposal."

(d) Information in a proposal identified by an offeror as trade secret information or confidential commercial and financial information shall be used by the Government only for the purpose of evaluating the proposal, except that (i) if a contract is awarded to the offeror as a result of or in connection with submission of the proposal, the Government shall have the right to use the information as provided in the contract, and (ii) if the same information is obtained from another source without restriction it may be used without restriction.

(e) If a request under the Freedom of Information Act seeks access to information in a proposal identified as trade secret information or confidential commercial and financial information, full consideration will be given to the offeror's view that the information constitutes trade secrets or confidential commercial or financial information. The offeror will also be promptly notified of the request and given an opportunity to provide additional evidence and argument in support of its position, unless administratively unfeasible to do so. If it is determined that information claimed by the offeror to be trade secret information or confidential commercial or financial information is not exempt from disclosure under the Freedom of Information Act, the offeror will be notified of this determination prior to disclosure of the information.

(f) The Government assumes no liability for the disclosure or use of information contained in a proposal if not marked in accordance with paragraphs (b) and (c) of this provision. If a request under the Freedom of Information Act is made for information in a proposal not marked in accordance with paragraphs (b) and(c) of this provision, the offeror concerned shall be promptly notified of the request and given an opportunity to provide its position to the Government. However, failure of an offeror to mark information contained in a proposal as trade secret information or confidential commercial or financial information will be treated by the Government as evidence that the information is not exempt from disclosure under the Freedom of Information Act, absent a showing that the failure to mark was due to unusual or extenuating circumstances, such as a showing that the offeror had intended to mark, but that markings were omitted from the offeror's proposal due to clerical error.

(End of provision)

‐‐‐End of Addendum to 52.212‐1‐‐‐

52.212-2 Evaluation—Commercial Products and Commercial Services (Nov 2021)(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

Technical and past performance, when combined, are

(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .