This document is a Questions and Answers (Q&A) file, Part 2 of 2, for a janitorial services contract for the BLM-NV Caliente Field Office and Fire Station.

The contract (Solicitation Number 140L3926Q0031) covers janitorial services at two facilities totaling 10,858 square feet: the Field Office (7,316 square feet, 87.5% carpeted) and Fire Station (3,542 square feet, 65% carpeted). Services are required Monday through Friday, excluding federal holidays and weekends, with no specific start or finish times mandated. The contract begins December 1, 2026. Routine services include daily trash removal, restroom cleaning, carpet vacuuming, and floor cleaning, with seasonal fire station restroom cleaning twice weekly from November 1 through March 31. Weekly window cleaning applies to interior windows only in specified office areas. Interior cleaning should occur outside normal business hours (7:00 a.m. to 5:00 p.m.), with fire station cleaning beginning before moving to the field office during the November-March period. The government furnishes toilet paper, paper towels, hand soap, trash bags, and toilet seat covers; contractors must provide all other supplies and equipment. Keys and secure storage for supplies will be provided. The government maintains on-site supply surplus for timely replenishment. No bonding, state licensing, or minimum insurance requirements apply, though contractors must ensure staff accident coverage.

Personnel requiring facility access must be identified two weeks before performance begins and undergo background screening and credentialing within 10 working days. The government covers screening and fingerprinting costs (currently $125 per person) for up to four initial personnel; additional personnel costs are contractor-funded. If credentialing is incomplete by the start date due to agency delay, contractors may operate under supervised access. All personnel submissions, including subcontractor employees, must be coordinated through the prime contractor. Facility details include 26 standard 3x5-foot windows, restrooms with specific plumbing fixtures, and multiple HVAC vents and light fixtures requiring quarterly cleaning. Historical labor hours and staffing data are unavailable. The Contracting Officer's Representative is Raymond Sandavol. Federal holidays and closures are excluded from pricing and do not require rescheduling or payment adjustment; additional guidance on government-directed closures will be provided by the Contracting Officer.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Caliente Field Office and Fire Station Janitorial Services Issuing Office: BLM-NV State Office

Location: BLM-NV Caliente Field Office Solicitation Number: 140L3926Q0031

Questions & Answers Part 2 of 2

1. The Statement of Work requires personnel requiring facility access to be identified at least two weeks before performance begins and references both "10 days" and "10 working days" for initiating personnel screening and credentialing. Please clarify the anticipated award date, the correct screening timeline, and how the Government intends to coordinate credentialing if award occurs fewer than two weeks before the December 1, 2026 start date. If background screening, credentialing, facility access approvals, or PIV issuance are not completed by the start date, may contractor personnel begin work under supervised/escorted access, or will the performance start date be adjusted accordingly?

Response: SOW revised to reflect 10 working days. Added the following: “If background screening, credentialing, facility access, or PIV issuance is not completed by the contract start date due to an agency delay, the contractor will be allowed supervised access to the facility.

2. Please confirm which contractor personnel are required to complete credentialing, fingerprinting, background screening, and obtain a federal identification card. Specifically, if the prime contractor's owner performs only remote contract administration and does not require facility access, would the owner be exempt from these requirements? Additionally, if on-site services are performed by a first-tier subcontractor, please confirm whether only the subcontractor's on-site personnel and supervisor are subject to these requirements.

Response: All personnel who require access to the facility to perform tasks identified in the SOW will be required to complete credentialing, fingerprinting, and background screening. If the prime contractor/owner does not anticipate a need to enter the facility under the terms of this contract, they will not be required to undergo screening.

3. Please confirm the approximate fingerprint processing cost per individual.

Response: As stated in the SOW, the BLM shall assume costs associated with completing the initial security and background checks for the Contractor and/or their original crew (not to exceed a total of 4). Beyond the original crew, the Contractor shall be responsible for all costs to complete the security and background checks for additional personnel.

The current fee for security and background checks is $125.00 per person. This fee is subject to change without notice.

4. The credentialing instructions reference form "OPB 3206-0261." Please confirm whether this refers to OF-306 or another form and provide all required credentialing documents, including the E-QIP Account Setup Request form.

Response: The OPB 3206-0261 and the OF-306 are not the same form. The OF-306 is the Declaration for Federal Employment and the OPB 3206-0261 is the Personnel Vetting Questionnaire (SF-85). The OF‑306 is for general federal employment eligibility, while OPB 3206‑0261 (SF‑85) is the national security clearance questionnaire. All forms and required documentation will be provided by the Department after the contract is awarded.

5. Please clarify which personnel may be required to travel to BLM facilities for credentialing and whether the Government-funded initial screening for up to four individuals applies to the subcontractor's initial workforce.

Response: The Contractor shall identify four individual who will be responsible for performing the work identified in the SOW under this contract (sub-contractors included).

Those four individuals will require access to the facility to perform the required duties. The screening/credentialing cost for those four individuals will be covered by the BLM. Should the contractor decide to hire five or more, the cost of the fifth individual and all others will be borne by the contractor. Additionally, the BLM will cover the cost of screening to replace individuals who are terminated or resign during the term of the contract.

6. Specifically, may contractor personnel begin work under escort while background screening, credentialing, or PIV card issuance is pending?

Response: Yes, provided the delay is at the hands of the agency. See response to question one for additional details.

7. If first-tier subcontractor personnel will perform the on-site services, may those personnel be submitted directly through the COR for credentialing and background processing, or must all submissions be coordinated through the prime contractor?

Response: All submissions must be coordinated through the prime contractor.

8. Will the Government provide keys, alarm codes, and after-hours access necessary for contract performance? Additionally, will secure on-site storage space be provided for contractor supplies and equipment?

Response: Yes, keys will be provided to allow after-hours access. Yes, contractor will be provided with a secure space for supplies and equipment.

9. Who will serve as the Contracting Officer's Representative (COR)?

Response: Raymond Sandavol

Location: BLM-NV Caliente Field Office Solicitation Number: 140L3926Q0031

10. What is the process and expected lead time for replenishing Government-furnished consumable supplies? Additionally, what actions should the contractor take if supplies are depleted before replacement stock is received?

Response: The BLM generally maintains a surplus of supplies on site and consumables can be readily replaced without delay. However, the contractor should notify BLM in advance when supplies are getting low to maintain service without interruption. Should supplies be depleted, notify BLM immediately so that additional supplies can be purchased.

11. The Statement of Work requires cleaning of the Fire Station restrooms/showers during the period November 1 through March 31 and describes the service frequency as "bi-weekly."

Please clarify whether "bi-weekly" means twice per week or once every two weeks.

Additionally, should this seasonal work be included within the annual contract line-item price or priced separately?

Response: SOW amended. This should occur twice weekly. SOW has been revised to reflect this. Pricing can be included in the annual contract line-item. Please do not price separately.

12. The Statement of Work references attached floor plans for Offices 1, 2, and 3; however, the solicitation posting does not include these attachments. Please provide the floor plans for the Caliente Field Office and Fire Station or amend the solicitation to include them.

Response: Floor plans attached in amendment P00001.

13. The Statement of Work states that routine services are performed Monday through Friday, year-round, while another section defines office hours as Monday through Friday excluding Federal holidays. Please clarify:

a. Whether services are required on Federal holidays that fall on weekdays;

b. Whether Federal holidays and facility closures should be excluded from pricing;

c. Whether services missed because of Federal holidays or Government-directed facility closures must be rescheduled;

d. Whether contract payments will be adjusted for Government facility closures; and

e. Whether there are any restrictions on cleaning hours due to Fire Station operations.

Response: a) SOW amended. Services are not required on holidays or weekends. Removed the following sentence from the SOW to limit confusion: “Services scheduled for Friday may be performed during the subsequent weekend.”

b) Holidays and weekends should be excluded from pricing

c) Holidays are not included; thus, rescheduling is not required. Additional guidance will be provided by the CO in the event of government-directed facility closures at the time of the event.

d) Additional guidance will be provided by CO in the event of government-directed facility closures at the time of the event.

e) Cleaning should typically be scheduled outside of normal business hours, which are generally 7:00am to 5:00pm.

14. Are there specific start and finish times?

Response: No

15. What is the required service frequency and schedule (daily/weekly/monthly/periodic tasks, days of week, service hours, holiday treatment), and which tasks are periodic/deep-clean, floor, carpet, or window tasks?

Response: Section D of the SOW titled “EACH SPECIFICALLY STATED SERVICE SHALL BE PERFORMED AS AND WHEN INDICATED” specifies task and cleaning frequency.

Please refer to that section for specific details.

16. Are there restrictions on cleaning hours due to Fire Station operations? Or security requirements apply during performance, particularly for the Fire Station?

Response: Cleaning should typically be scheduled outside of normal business hours, which are generally 7:00am to 5:00pm. No additional security measures are required. However, during the March 31 through November 1 fire station cleaning period, please start cleaning at the fire station and then move to the field office.

17. Are federal holidays and facility closures excluded from required service? Should service be rescheduled? Will the Government adjust payment for closures?

Response: See response to question #13 a-d.

18. Section D.3.A of the Statement of Work requires washing all windows, windowsills, venetian blinds, and window screens at the Field Office and Fire Station Offices 1, 2, and 3 on a weekly basis. Please confirm that the weekly requirement applies to the full scope described, including interior and exterior windows, blinds, screens, and sills.

Response: SOW revised to reflect cleaning the inside of all windows in the Field Office and office space 1, 2, and 3 of the Fire Station once a week. Cleaning consists of thoroughly washing, the inside of all windows including the windowsills and venetian blinds.

19. What is the total facility square footage?

Response: 10,858 square feet

20. Please provide available facility workload data, including:

a. Carpeted square footage;

b. Hard-floor square footage;

c. Number of restrooms and plumbing fixtures;

i. Office

ii. Fire Station

d. Number and approximate size of windows;

e. Number of HVAC vents, grilles, registers, and ducts;

f. Number of ceiling light fixtures included in quarterly cleaning requirements;

g. Parking-lot trash can count.

Response:

a) & b) Field Office is 7,316 square feet and approximately 87.5% is carpeted. Entrance ways, foyers, break room and bathrooms are not.

Fire Station is approximately 3,542 square feet approximately 65% is carpeted. Entryways, bathrooms, kitchen, closets and utility rooms are not.

c) Field Office -- Men: 1 sink, 2 toilets, 1 urinal. Women: 1 sink, 3 toilets. Both have one ADA toilet. Fire Station: Men & Women: 2 toilets, one sink, one shower each

d) 26 - 3x5 ft standard windows. One rear doorway window approximately 6x8ft. One front door with 2 windows approximately 8x8ft.

e) Field Office: 25 air ducts in ceiling. (2) 9"x18" exhaust fan covers. Fire Station: (28) small 5"x11" air ducts, one 24"x32" return duct, one 5"x15" return duct and 2 12"x12" exhaust fan covers.

f) Field Office: (68) 4ft x 18" fluorescent light fixtures in ceiling. (6) 4"x4 x4 ft. fluorescent light fixtures on walls at back and front entrances. Bathrooms: (2) 4 ft. X 18" fluorescent light fixture in ceiling, (2) 4" x 4" x 4 ft. fluorescent light fixture in wall

Fire Station: (13) 12" x 4 ft. fluorescent ceiling light fixtures, (12) 9" LED circular light fixtures & (5) 6" LED circular. Bathrooms: (4) 6" LED lights in ceiling + (2) 24" fluorescent lights over sinks

21. Are estimated cleaning labor hours, historical staffing levels, or historical contract costs available?

Response: Historical cleaning hours/staffing data are not available.

22. Are any insurance, bonding or state licensing requirements intended? Are there minimum insurance requirements for this contract?

Response: Bonding and state licensing not required. It is the contractor’s responsibility to ensure that their staff is covered in the event of an accident.

23. Which supplies/equipment are Government-supplied, and which must the contractor furnish, per the statement that the contractor shall furnish all supplies necessary "except those identified as government-supplied"?

Response: The government furnishes toilet paper, paper towels, hand soap, trash bags and toilet seat covers.