Sol_140L3725R0004_Amd_0005.pdf
PDF 233 KB Posted
- Attached to
- NIFC 300 JWH MPR Suite Federal contract opportunity
- Solicitation number
- 140L3725R0004
About this file
This document is an Amendment (Amendment 0005) to Solicitation 140L3725R0004 for the NIFC 300-JWH NICC & MPR Infrastructure Repairs project by the Bureau of Land Management's Fire and Aviation division. The amendment provides several key specification changes for both the MPR and NICC sites, including: 1) Modifications to Section 015000 Temporary Facilities and Controls, requiring contractors to implement safety requirements based on their specific construction type and safety program, 2) Removal of the entire Section 230130.52 on Existing HVAC Air Distribution System Cleaning, with instructions to protect existing HVAC systems from construction contaminants, and 3) A clarification regarding safety facilities, specifically that safety showers are not mandatory but water is available if required by the contractor's safety program.
The amendment, effective 06/18/2025, emphasizes contractor flexibility in implementing safety measures and protecting existing infrastructure during the repair work. The solicitation is issued by the Bureau of Land Management's Fire and Aviation office in Boise, Idaho, with the contract covering infrastructure repairs at the National Interagency Fire Center (NIFC) 300-JWH MPR Suite and NICC locations. No further questions, RFIs, or clarifications will be considered after this amendment, and all other terms and conditions of the original solicitation remain unchanged.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L3725R0004_Amd_0004.pdf | ||
| NIFC_300-JWH_NICC_Spec_R1_20250602_0003.pdf | ||
| NIFC_300-JWH_MPR_Specs_R1_20250602_0003.pdf | ||
| NIFC_300-JWH_MPR_Drawings_R1_11x17_20250603_0003.pdf | ||
| Sol_140L3725R0004_Amd_0003.pdf | ||
| NIFC_300-JWH_NICC_Drawings_R1_11x17_20250603_0003.pdf | ||
| Sol_140L3725R0004_Amd_0002.pdf | ||
| Sol_140L3725R0004_Amd_0001.pdf | ||
| A06_NIFC_300-JWH_-_NICC_Plans.pdf | ||
| Sol_140L3725R0004.pdf | ||
| SF1442_Example_Completion-Instructions-Reference.pdf | ||
| A06_NIFC_300-JWH_-_Supplemental_Info.pdf | ||
| A06_NIFC_300-JWH_-_MPR_Plans.pdf | ||
| B03_Wage_Determination_ID20250104_03-07-2025.pdf | ||
| B08_NIFC_300-JWH_-_Bid_Schedule_28FEB2025.pdf | ||
| A06_NIFC_300-JWH_-_NICC_Specs.pdf | ||
| A06_NIFC_300-JWH_-_MPR_Specs.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140L3725R0004 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
LFA
BOISE ID 83705
3833 S. DEVELOPMENT AVE.
BLM FA-NTL INTRAGCY FIRE CTR(FA250)
06/18/20250005
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/24/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PROJECT: NIFC 300 JWH MPR Suite and NICC Repairs
The purpose of this Amendment is to:
1. Provide clarifications to Amendment 0003 questions.
NO FURTHER QUESTIONS/RFI'S/CLARIFICATIONS WILL BE CONSIDERED
This amendment must be acknowledged in accordance with the solicitation.
All other terms and conditions set forth within this solicitation remain unchanged.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Matthew Steele
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140L3725R0004/0005
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
United States Department of the Interior
BUREAU OF LAND MANAGEMENT
Fire and Aviation 3833 S Development Ave
Boise, Idaho 83705-5354
18 June 2025
AMENDMENT
Solicitation 140L3725R0004
NIFC 300-JWH NICC & MPR Infrastructure Repairs
The following revisions shall be made part of these solicitation documents.
NIFC 300-JWH MPR Specifications:
1. Specification Section 015000 – Temporary Facilities and Controls: Add the following to Part 3 - Execution; 3.1.B. The contractor shall implement requirements noted in this execution section as determined by the type of construction and as reflected in their submitted safety program.
2. Specification Section 230130.52 – Existing HVAC Air Distribution System Cleaning:
Remove section in its entirety. Existing HVAC system shall be protected from construction contaminants per General Notes on Mechanical sheets.
NIFC 300-JWH NICC Specifications:
1. Specification Section 015000 – Temporary Facilities and Controls: Add the following to Part 3 - Execution; 3.1.B. The contractor shall implement requirements noted in this execution section as determined by the type of construction and as reflected in their submitted safety program.
2. Specification Section 230130.52 – Existing HVAC Air Distribution System Cleaning:
Remove section in its entirety. Existing HVAC system shall be protected from construction contaminants per General Notes on Mechanical sheets.
Clarification to Questions & Answers #38 Posted in Amendment 003:
1. Q38. MPR & NICC - Specification section 015000 Temporary Facilities and Controls subsection 3.4 G states “Safety Facilities: Provide safety showers, eyewash fountains, and similar facilities for safety and sanitation of personnel.” Will this be required?
A38. Shall be changed to: Contractor shall provide safety items as determined by the type of construction and in line with their internal safety program. The Government does not expect a safety shower is required based on the construction type, however if the contractor’s safety program requires one, water is available for use and shower may be located as determined by the contractor’s safety program.
File details come from the government source that posted it. Updated .