This is Amendment 0001 to solicitation 140L3626R0002, issued by the Bureau of Land Management (BLM) Montana State Office. The amendment updates the solicitation due date to September 10, 2026 at 1:00 PM Mountain Time and provides supplemental information regarding pipeline construction routing and seasonal water flow considerations. The period of performance runs from September 25, 2026 to April 15, 2028.
The amendment includes detailed information on pipeline construction along ridgelines and roads with emphasis on creek crossings. The primary route includes one significant crossing at Whiskers Coulee and several minor tributaries, all classified as intermittent streams that flow only during snowmelt or substantial precipitation events. These creeks are expected to remain dry for nearly the entire year, with water flow typically confined to winter months when construction activities are naturally limited. The maximum possible distance with conceivable surface flow is approximately 1,500 linear feet. The government expects contractors can schedule pipeline construction around brief surface flow events given the extended performance period. For perched groundwater encountered during excavation, the government's expectation is that dewatering can be adequately managed by bailing with bucket equipment on backhoes or excavators. Offerors must acknowledge receipt of this amendment prior to the specified deadline using one of the prescribed methods outlined in the solicitation.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Jorge Alvarez
See continuation page
BLM MT-STATE OFC(MT935)
5001 SOUTHGATE DR.
BILLINGS MT 59101
BLM MT STATE OFC(MT935)
5001 SOUTHGATE DR.
BILLINGS MT 59101
LMA
LMA
140L3626R0002
08/11/2026
08/04/2026
1 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140L3626R0002/0001
See amendment information below.
Period of Performance: 09/25/2026 to
04/15/2028
Description of Changes - This amendment incorporates the following information:
1. Updates the solicitation due date to 10 September 2026 at 1:00 PM Mountain Time.
2. The Government is providing supplemental information on pipeline routing and seasonal water flow.
Acknowledgement - See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of offers (See Block 8 of the Standard Form 1442).
Third Party – If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.
Supplemental Information on Pipeline Routing and Seasonal Water Flow
This addendum provides further clarification and supplemental information regarding the construction of pipelines along the ridgelines and roads, with particular attention to creek crossings encountered on the route.
Additional Details on Creek Crossings The primary route of the pipelines follows ridgelines and roads situated at their summits, minimizing environmental impact and facilitating access. The route includes one significant creek crossing at Whiskers Coulee, as well as several minor crossings of unnamed tributaries. All these creeks are classified as intermittent, meaning they flow only in response to snow melt or substantial precipitation events.
Timing and Flow Considerations It is further anticipated that these intermittent creeks will remain dry for almost the entire year, barring a few days when water flow is present. These occurrences are typically confined to the winter season, a period when construction activities are naturally limited due to weather. Additionally, the region’s most substantial precipitation typically falls within the wildlife closure window from April 15th through July 15th, which further restricts conflict with pipeline work during these months. The maximum possible distance with conceivable surface flow is estimated at approximately 1,500 linear feet.
Mitigation Measures for Construction Scheduling To address potential weather-related delays and intermittent water flow, contractors could be provided with additional time and flexibility to ensure work is performed when drainages are not flowing. Given the extended performance period and the limited expected duration of flow, it is believed that contractors can effectively schedule pipeline construction around these brief surface flow events, minimizing impact on both the environment and project timelines.
If perched ground water is encountered the government’s expectation is the excavation at that location can be adequately dewatered by bailing with the bucket on a backhoe or excavator.
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |