About this file
This is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the McMaster Headgate Replacement project (Solicitation No. 140L3625Q0094) issued by the Bureau of Land Management (BLM) Montana State Office. The amendment extends the solicitation deadline to September 18, 2025, at 1:00 PM MDT and provides a list of questions and answers from potential offerors. The project involves replacing an existing wooden headgate structure with a modern, screw-type diversion structure capable of diverting 16 cubic feet per second (cfs) on Beaver Creek in Broadwater County, Montana.
Key project requirements include clearing an access route, removing the existing wooden headgate, installing a new lockable and tamper-resistant headgate that ties into the existing ditch system, and clearing the ditch to ensure proper water flow and measurement. The government is seeking a cost-effective, durable headgate design that meets Department of Natural Resources and Conservation (DNRC) and State of Montana regulations. The project does not require a 310 permit, and the SPA124 permit has already been obtained. The period of performance is set from September 30, 2025, to September 30, 2026.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L3625Q0094_Amd_0002.pdf | ||
| Attachment_5_-_SPA124_Permit_0002.pdf | ||
| Sol_140L3625Q0094_Amd_0001.pdf | ||
| Attachment_2_-_Pictures_of_McMaster_Headgate.pdf | ||
| Sol_140L3625Q0094.pdf | ||
| Attachment_4_-_Wage_Determination.pdf | ||
| Attachment_3_-_McMasters_Headgate_Access_Map.pdf | ||
| Attachment_1_-_SOW_McMaster_Headgate_Replacement.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140L3625Q0094 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
LMA
BILLINGS MT 59101
5001 SOUTHGATE DR.
BLM MT STATE OFC(MT935)
LMA
BILLINGS MT 59101
5001 SOUTHGATE DR.
BLM MT-STATE OFC(MT935)
09/16/20250003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/26/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See below for changes incorporated by this amendment.
Period of Performance: 09/30/2025 to 09/30/2026
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Jorge Alvarez
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
PROJECT DESCRIPTION: McMaster Headgate Replacement Solicitation No. 140L3625Q0094
Description of Changes - This amendment incorporates the following information:
1. The Government is providing the latest list of Questions received from interested offerors and the associated Answers provided by the Government.
2. The solicitation is extended to 18 September 2025, at 1:00PM MDT.
Acknowledgement - See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of offers (See Block 8 of the Standard Form 1442).
Third Party – If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.
New Questions and Answers
1) Prospectively offeror sent a design idea for review. Basically two 8' thick reinforced concrete walls, 4' tall. 6-8' long, with steel upside down 'U' shaped 4" C-channel frames, with one that has the headgate on a wheel actuated lifter and closer actuated by an acme thread with a handwheel to facilitate the lifting and closing. An identical upside down 'U', without an acme thread facilitated gate at the front and rear of the concrete walls to reinforce the structure. Studs would be mounted in the concrete to secure the structure to make sure that it was permanent and would last for the centuries to follow.
We do not have any drawings for the structure. I would defer to the Statement of work (SOW) when designing and bidding on the project. The “tasks” are outlined below:
4. TASKS:
4.1. Access Route Brush Clearing The access route will be cleared of brush to facilitate equipment access and structure delivery. Cut material shall be removed from the site.
4.2. Wooden Headgate Removal The existing headgate structure shall be removed from ditch. The remnants of the wooden structure shall also be removed from the site.
4.3. Headgate Structure Install A modern, screw type diversion structure, capable of diverting 16cfs will be installed in such a manner that the maximum amount of flow during the lowest water period will be able to be diverted. The diversion will be lockable and tamper resistant. This structure must functionally tie in with the existing ditch system.
4.4. Ditch Clearing The ditch from the headgate install to the current measuring device must be cleared of debris in order to flow water and ensure volume measurements.
From what I can tell, the structure you have described mimics the headgate downstream that we are looking to mimic and would meet the intentions of the project as long as it is properly designed to accept the entire water right (16cfs). Similar headgates I have done in the past have a length of culvert coming out of the back of the structure to reduce turbulence and erosion near the concrete headgate.
Questions and Answers
1) Is a 310 permit required for the project?
No 310 permit is required, the applicable SPA124 has already been received and part of the initial package submission. See Attachment 5 - SPA124 Permit.
2) Shouldn’t the Place of Performance be Broadwater County, MT and NOT Lewis and Clark County?
Yes. The correct county is Broadwater County. Attachment 4 - Wage Determination does not need to be updated since it also includes Broadwater County.
Questions and Answers
1) Is there an engineering specification or plan available for the headgate?
We do not have specific specs as we are not experts in the irrigation structure world.
Prior to submission and after talking with BLM engineers, we concluded it was best to allow the experts in the field to provide the structure that best fit the location and allowed for the full use of the 16cfs during the lowest flows of Beaver Creek. So, our needs are more in line with “If no formal spec is provided: Design and construct a cost-effective, durable headgate that meets DNRC and State of Montana regulations for headgates, ensuring both sustainability and compliance.” Make sure it is “A modern, screw type diversion structure, capable of diverting 16cfs will be installed in such a manner that the maximum amount of flow during the lowest water period will be able to be diverted. The diversion will be lockable and tamper resistant. This structure must functionally tie in with the existing ditch system.” Emphasis on lockable and tamper resistant as we’ve had issues with unauthorized tampering of our current diversion.