Sol_140L3625Q0094_Amd_0001.pdf
PDF 168 KB Posted
- Attached to
- MCMASTER HEADGATE REPLACEMENT Federal contract opportunity
- Solicitation number
- 140L3625Q0094
About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the McMaster Headgate Replacement project, Solicitation No. 140L3625Q0094, issued by the Bureau of Land Management (BLM) Montana State Office. The amendment, dated 08/26/2025, incorporates a questions and answers section providing project specifications for a new headgate. The government seeks a modern, screw-type diversion structure capable of diverting 16 cubic feet per second (cfs) from Beaver Creek, with specific requirements including being lockable, tamper-resistance, and compliant with DNRC and State of Montana regulations. The period of performance is set from 09/30/2025 to 09/30/2026, and the amendment's primary purpose is to provide clarification to potential offerors by sharing a detailed response to a question about engineering specifications for the headgate replacement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L3625Q0094_Amd_0003.pdf | ||
| Sol_140L3625Q0094_Amd_0002.pdf | ||
| Attachment_5_-_SPA124_Permit_0002.pdf | ||
| Sol_140L3625Q0094.pdf | ||
| Attachment_4_-_Wage_Determination.pdf | ||
| Attachment_3_-_McMasters_Headgate_Access_Map.pdf | ||
| Attachment_1_-_SOW_McMaster_Headgate_Replacement.pdf | ||
| Attachment_2_-_Pictures_of_McMaster_Headgate.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140L3625Q0094 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
LMA
BILLINGS MT 59101
5001 SOUTHGATE DR.
BLM MT STATE OFC(MT935)
LMA
BILLINGS MT 59101
5001 SOUTHGATE DR.
BLM MT-STATE OFC(MT935)
09/03/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/26/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See below for changes incorporated by this amendment.
Period of Performance: 09/30/2025 to 09/30/2026
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Jorge Alvarez
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
PROJECT DESCRIPTION: McMaster Headgate Replacement Solicitation No. 140L3625Q0094
Description of Changes - This amendment incorporates the following information:
1. The Government is providing the Questions received from interested offerors and the associated Answers provided by the Government.
Acknowledgement - See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of offers (See Block 8 of the Standard Form 1442).
Third Party – If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.
PROJECT DESCRIPTION: McMaster Headgate Replacement Solicitation No. 140L3625Q0094
Questions and Answers
1) Is there an engineering specification or plan available for the headgate?
We do not have specific specs as we are not experts in the irrigation structure world.
Prior to submission and after talking with BLM engineers, we concluded it was best to allow the experts in the field to provide the structure that best fit the location and allowed for the full use of the 16cfs during the lowest flows of Beaver Creek. So, our needs are more in line with “If no formal spec is provided: Design and construct a cost-effective, durable headgate that meets DNRC and State of Montana regulations for headgates, ensuring both sustainability and compliance.” Make sure it is “A modern, screw type diversion structure, capable of diverting 16cfs will be installed in such a manner that the maximum amount of flow during the lowest water period will be able to be diverted. The diversion will be lockable and tamper resistant. This structure must functionally tie in with the existing ditch system.” Emphasis on lockable and tamper resistant as we’ve had issues with unauthorized tampering of our current diversion.
File details come from the government source that posted it. Updated .