This document is an Amendment to a Solicitation for the McMaster Ranch Long Barn Stabilization project (Solicitation No. 140L3625Q0049), issued by the Bureau of Land Management (BLM) Montana State Office. The amendment provides a series of questions and answers from potential contractors, clarifying project details such as material disposal, column and rafter inspection and replacement, and roofing requirements. The project focuses on stabilizing the northern section of the long barn, with work to include plumbing the northern 3 rows of columns, replacing deformed rafters (particularly in the northeast section), and potential roofing modifications. The period of performance is from 09/01/2025 to 12/31/2025, and contractors are expected to include all material disposal costs in their bid and conduct detailed inspections of the structure's condition.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L3625Q0049_Amd_0001.pdf | ||
| Attachment_4_-_Past_Performance_Reference_List.docx | DOCX document | |
| Attachment_1_-_SOW_McMaster_Long_Barn.pdf | ||
| Attachment_2_-_Structural_Assessment.pdf | ||
| Sol_140L3625Q0049.pdf | ||
| Attachment_3_-_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140L3625Q0049 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
LMA
BILLINGS MT 59101
5001 SOUTHGATE DR.
BLM MT STATE OFC(MT935)
LMA
BILLINGS MT 59101
5001 SOUTHGATE DR.
BLM MT-STATE OFC(MT935)
08/12/20250002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/29/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of the amendment is stated below.
Period of Performance: 09/01/2025 to 12/31/2025
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Jorge Alvarez
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
PROJECT DESCRIPTION: McMaster Ranch Long Barn Stabilization Solicitation No. 140L3625Q0049
Description of Changes - This amendment incorporates the following information:
1. The Government is providing the Questions received from interested offerors and the associated Answers provided by the Government.
Acknowledgement - See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of offers (See Block 8 of the Standard Form 1442).
Third Party – If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.
SITE INSPECTION TOUR / QUESTIONS AND ANSWERS
NEW QUESTIONS AND ANSWERS
1. Regarding phrasing in Attachment 1, Section B. i. 2. Material Disposal. It states that “All equipment and costs required to remove, haul and dispose of debris will be the contractor’s expense.” Does this mean that we are not going to be reimbursed for costs of removal of material from the site?
A: The contractor will include all costs associated with material disposal in line item 4.II.B.i. This is just stating that the contractor will bid this line item to include these costs, and that the BLM will not be responsible for removing or hauling debris from the site that is deemed useless for construction or archeological purposes.
2. Have all the columns been inspected, and are we expected to estimate for the plumbing of just the exterior north wall and the second row of columns in, or should we be expecting to plumb more than that?
A: The columns have been inspected for rot using a sounding test with a hammer. Bid the project assuming all columns are in good working order. If it becomes apparent that multiple need to be replaced it can be dealt with as a modification down the road. Only plan to plumb the northern 3 rows of columns, though the majority of work with be the 2 northernmost rows (including the exterior row).
3. Is there a concrete stem wall to be removed on the South side of the building as well? Is there any work, footer or otherwise, that needs to be done on the south side? Want to be sure, as removing the material from inside the building on the south side would require a lot of time.
A: There is no plan to work on the south side of the building or move any of the material south of the central column row. If it becomes apparent that works must be done to achieve desired affects it will be dealt with as a modification at a later date. The goal is to focus on the northern column rows and reduce the listing concerns.
4. Should we be estimating to replace the rafters for the entirety of the building, just the north side, or just a portion of the north side? Has an in-depth inspection been done, or should I be adding inspection time to the project as well? Having an idea of how much roof needs to be removed will make this more accurate overall.
A: Per the specifications the contractor will be expected to replace any rafter with deformation greater than L/240 which seems concentrated to the northeast section of the building. The contractor should plan to include inspection time for measuring deformation and verifying which rafters are in need of replacement.
5. Another question I have is whether we are cleared to use screws in the holes that nails exist currently in the metal roofing, so we can reuse the roofing or if we should be estimating new roofing material as well?
A: I believe we'll be able to use screws in the existing nail holes. I will forward to archeology for confirmation.