Sol_140L3624R0003_Amd_0001.pdf
PDF 173 KB Posted
- Attached to
- GAOA MARSHALL DAM RECONSTRUCTION Federal contract opportunity
- Solicitation number
- 140L3624R0003
About this file
This amendment modifies solicitation number 140L3624R0003 issued by the Department of the Interior Bureau of Land Management seeking proposals for the GAOA Marshall Dam reconstruction project. The amendment provides updated site visit location coordinates and instructions, requiring contractors to travel to the dam site at 46.636111, -104.955278 on November 28, 2023 at 11:00 AM Mountain Time. Contractors must bring their own set of drawings and specifications and a four-wheel drive vehicle is recommended for the site visit. The amendment must be acknowledged prior to the hour and date specified in the solicitation by completing the amendment, acknowledging receipt in writing, or through a separate letter or communication.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L3624R0003_Amd_0004.pdf | ||
| Amendment_04_0004.pdf | ||
| Amendment_03_0003.pdf | ||
| Sol_140L3624R0003_Amd_0003.pdf | ||
| Amendment_02_0002.pdf | ||
| Sol_140L3624R0003_Amd_0002.pdf | ||
| Amendment_01_0001.pdf | ||
| Attachment_1_-_Marshall_Dam_Specs.pdf | ||
| Attachment_7_-_SF_24_Bid_Bond.pdf | ||
| Attachment_3_-_Wage_Determination.pdf | ||
| Sol_140L3624R0003.pdf | ||
| Attachment_9_-_SF25A_Payment_Bond.pdf | ||
| Attachment_4_-_Reference_List.pdf | ||
| 140L3624R0003.pdf | ||
| Attachment_8_-_SF25_Performance_Bond.pdf | ||
| Attachment_6_-_Financial_Responsibility_Required_Documentation.pdf | ||
| Attachment_5_-_Past_Performance_Questionnaire.pdf | ||
| Attachment_2_-_Marshall_Dam_Drawing.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140L3624R0003 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
LMA
BILLINGS MT 59101
5001 SOUTHGATE DR.
BLM MT STATE OFC(MT935)
LMA
BILLINGS MT 59101
5001 SOUTHGATE DR.
BLM MT-STATE OFC(MT935)
11/27/20230001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
11/09/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See Page 2 of 3 for changes incorporated by this amendment.
Period of Performance: 06/17/2024 to 11/15/2024
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Jorge Alvarez
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
PROJECT DESCRIPTION: GAOA Marshall Dam Solicitation No. 140L3624R0003
Description of Changes - This amendment incorporates the following information:
1. Corrects the site visit location information (Coordinates).
Acknowledgement - See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of offers (See Block 8 of the Standard Form 1442).
Third Party – If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.
PROJECT DESCRIPTION: GAOA Marshall Dam Solicitation No. 140L3624R0003
Marshall Dam Date: 28 November 2023 Time: 11:00 AM Mountain Time Meeting Place: On-Site Dam
Coordinates: 46.636111°, -104.955278° Special Instructions: During the site visit, contractors will travel in their own vehicles. Four-wheel drive vehicles are recommended.
Contractor is required to bring their own set of Drawings and Specifications. Directions shown in the Drawings on Sheet 2.
Point of Contact for Site Visit Josh Helm
Role/Title: Civil Engineer
Phone: 406-233-2815 Email: jhelm@blm.gov mailto:jhelm@blm.gov
File details come from the government source that posted it. Updated .