140L3621R0001_Solicitation_Package_(Issued).pdf
PDF 581 KB Posted
- Attached to
- MIDDLE TWO CALF ROAD RECONSTRUCTION Federal contract opportunity
- Solicitation number
- 140L3621R0002
About this file
This is a solicitation issued by the Department of the Interior Bureau of Land Management (BLM) seeking proposals for the decommissioning and reconstruction of two sections of Middle Two Calf Road near Winifred, Montana. Key work includes demolishing the existing road surface, grading and constructing a new road alignment, building two new stream crossings and repairing one existing crossing, and installing culverts. The solicitation includes additive schedules for stockpiling riprap and reseeding disturbed areas. Proposals are due on July 29, 2021 at BLM's Montana State Office in Billings. BLM anticipates awarding a firm-fixed price contract on or around August 19, 2021, requiring the successful contractor to commence work within 10 days of notice and complete the project within 91 days. The estimated price range is $250,000 to $500,000. BLM issued the solicitation as a total small business set-aside under NAICS code 237310 with a size standard of $39.5 million.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 140L3621R0002_Amendment_2_(Issued)_0002.pdf | ||
| Sol_140L3621R0002_Amd_0002.pdf | ||
| 140L3621R0002_Amendment_1_(Issued)_0001.pdf | ||
| Sol_140L3621R0002_Amd_0001.pdf | ||
| Attachment_3_-_General_Decision_Number.pdf | ||
| Attachment_1_-_Middle_Two_Calf_Road_Technical_Specifications.pdf | ||
| Attachment_10_-_DI-137_Release_of_Claims.pdf | ||
| Attachment_2_-_Middle_Two_Calf_Road_Reconstruction_Drawings.pdf | ||
| Attachment_9_-_SFA_Payment_Bond.pdf | ||
| Attachment_7_-_SF_24_Bid_Bond.pdf | ||
| Sol_140L3621R0002.pdf | ||
| Attachment_8_-_SF25_Performance_Bond.pdf | ||
| Attachment_6_-_Financial_Responsibility_Required_Documentation.pdf | ||
| Attachment_5_-_Past_Performance_Questionnaire.pdf | ||
| Attachment_4_-_Reference_List.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of the Interior Bureau of Land Management Montana State Office
June 2021
Request for Proposals Solicitation No. 140L3621R0002
Middle Two Calf Road Reconstruction Montana
Solicitation No: 140L3621R0002 PROJECT DESCRIPTION: Middle Two Calf Road Reconstruction
THIS PAGE INTENTIONALLY LEFT BLANK
MIDDLE TWO CALF ROAD RECONSTRUCTION
MONTANA
FOREWORD
The Department of Interior, Bureau of Land Management (BLM), Montana State Office is soliciting proposals for the decommissioning and reconstructing two sections of Middle Two Calf Road near Winifred, Montana. The principal components of the work to be performed include the following site work tasks:
1. Demolition, including decommissioning and revegetating existing road surface.
2. Site grading and construction of new road alignment.
3. New construction of two (2) stream crossings.
4. Repairing one (1) existing stream crossing.
5. Installing culverts under roadway.
6. ALTERNATES
a. Stockpile rip-rap at staging area near existing stream crossing.
b. Reseed decommissioned road beds and all disturbed areas outside of new roadway with certified weed-free seed mix.
c. Provide construction staking by qualified surveyor with demonstrated experience.
PROCUREMENT OVERVIEW
TYPE OF CONTRACT: Construction, Firm Fixed Priced (FFP), Single Award Contract
TYPE OF CONSTRUCTION: Highway
NAICS CODE: 237310, Highway, Street, and Bridge Construction
MAGNITUDE: Between $250,000 and $500,000
RESTRICTIONS ON CONTACTS: Beginning upon release of the request for proposal (RFP) through contract award, contacting Government employees who may be associated with this work by participating offerors on the subject of this RFP is inappropriate. Offerors for this RFP, including subcontractors and teammates, shall not attempt such contacts during this period. All correspondence shall be through the Contracting Officer listed below:
Attn: Christine Mundt 5001 Southgate Drive Billings, MT 59101 Phone: 406-896-5030 Email: cmundt@blm.gov
SITE VISIT: The Government strongly urges offerors to inspect the site to gain a better understanding of the work requirements and to satisfy themselves regarding all general and local conditions that may affect the cost of performance. In no event shall failure to inspect the site constitute grounds for a claim after award.
See Section L, Clause 52.236-27 – Alternate I, Site Visit (Construction) – Alternate I for more information.
mailto:cmundt@blm.gov
QUESTIONS DUE: July 22, 2021 at 5:00 pm, Mountain Time. Questions submitted after this date and time will not be accepted. All questions must be submitted in writing via e-mail to the CO. See Section L, Submittal of Questions for more information.
PROPOSAL RESPONSE DATE: For dates when contractors are to submit their proposals, see block 13 of Standard Form 1442, “Solicitation, Offer, and Award (Construction, Alteration, or Repair).” See Section L, Instructions, Conditions and Notices to Offerors, for a list of required documents.
METHOD OF PROCUREMENT: This procurement is set-aside for Small Business Concerns and is a construction acquisition, pursuant to Federal Acquisition Regulations (FAR) Part 15, Part 19, and Part 36.
SAM: Effective July 29, 2012, any contractor interested in doing business with the Federal Government must register in the System for Award Management (SAM) database prior to award of a contract or agreement. SAM is an official website of the U.S. government. There is no cost to use SAM. You can use this site for FREE to:
• Register to do business with the U.S. government
• Update or renew your entity registration
• Check status of an entity registration
• Search for entity registration and exclusion records
To register in SAM, at a minimum, you will need the following information:
• Your DUNS Number, Legal Business Name, and Physical Address from your Dun & Bradstreet (D&B) record.
• Your Taxpayer Identification Number (TIN) and Taxpayer Name associated with your TIN.
• Your bank's routing number, your bank account number, and your bank account type, i.e. checking or savings, to set up Electronic Funds Transfer (EFT).
Contractors may obtain information on registration and annual confirmation requirements via the SAM website accessed through https://www.sam.gov/SAM/ or by the Federal Service Desk at 1-866-606-8220.
IPP: Payment requests for the anticipated contract must be submitted electronically through the U.S. Department of the Treasury’s Invoice Processing Platform (IPP). IPP is a secure, web-based service that more efficiently managements government invoicing from purchase order through payment notification at no charge to federal agencies and their vendors. The IPP website address is https://www.ipp.gov/. The contractor must use the IPP website to register access and use IPP for submitted request for payment. Contractor assistance with enrollment can be obtained by contacting the IPP Customer Support Team via email IPPCustomerSupport@fiscal.treasury.gov or via phone at 1-866-973-3131.
If the contractor is unable to comply with the requirements to use IPP for submitting invoices for payment, the contract must submit a waiver request in writing to the Contracting Officer with its proposal.
https://www.sam.gov/PORTAL/PUBLIC/SAM/ https://www.sam.gov/SAM/ https://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov
TABLE OF CONTENTS
PART I – THE SCHEDULE
SECTION A – SOLICITATION/CONTRACT FORM
Standard Form 1442
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
Price Schedule
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Specifications and Drawings .......................................................................................................... See Section J
SECTION D – PACKAGING AND MARKING
Not Applicable
SECTION E – INSPECTION AND ACCEPTANCE
E.1 Inspection of Construction E.2 Warranty of Construction
SECTION F – DELIVERIES OR PERFORMANCE
F.1 Commencement, Prosecution, and Completion of Work F.2 Schedules for Construction Contracts F.3 Suspension of Work
SECTION G – CONTRACT ADMINISTRATION DATA
G.1 DIAR Authorities and Delegations G.2 Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) G.3 Local Invoice Processing Platform (IPP) Hotline G.4 Government Point of Contact
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1 Work Hours H.2 Fire Danger Season H.3 Drawings H.4 Preservation of Historical and Archeological Data H.5 Safety and Quality Control Plan H.6 Federal Holidays H.7 Limitations on Subcontracting Reporting
PART II – CONTRACT CLAUSES
SECTION I – CONTRACT CLAUSES
I.1 Clauses Incorporated by Reference I.2 Equal Opportunity for Veterans I.3 Equal Opportunity for Workers with Disabilities I.4 Hazardous Material Identification and Material Safety Data – Alternate I I.5 Buy American – Construction Materials I.6 Additional Bond Security I.7 Performance and Payment Bonds - Construction I.8 Changes I.9 DIAR Restrictions on Endorsements – Department of the Interior
I.10 DIAR Release of Claims – Department of the Interior I.11 DIAR Examination of Records – Department of the Interior I.12 DIAR Liability Insurance – Department of the Interior I.13 Service of Protest Department of the Interior – Bureau of Land Management (Deviation)
PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J – LIST OF ATTACHMENTS
Middle Two Calf Road Technical Specifications (04-30-2020) ....................................... Separate Attachment Middle Two Calf Road Reconstruction Drawings ............................................................ Separate Attachment General Decision Number: MT20210076 (01/01/2021) ................................................... Separate Attachment Reference List .................................................................................................................... Separate Attachment Past Performance Questionnaire ........................................................................................ Separate Attachment Financial Responsibility Required Documentation ........................................................... Separate Attachment SF 24, Bid Bond ................................................................................................................ Separate Attachment SF 25, Performance Bond .................................................................................................. Separate Attachment SF 25A, Payment Bond ..................................................................................................... Separate Attachment DI-137, Release of Claims ................................................................................................ Separate Attachment
PART IV – REPRESENTATIONS AND INSTRUCTIONS
SECTION K – REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS
OR RESPONDENTS
K.1 Annual Representations and Certifications K.2 Commercial and Government Entity Code Reporting K.3 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment K.4 Violation of Arms Control Treaties or Agreements – Certification K.5 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction K.6 Preparation of Proposals – Construction
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR REPONDENTS
L.1 System for Award Management L.2 Alternative Line Item Proposal L.3 Submission of Offers in the English Language L.4 Submission of Offers in U.S. Currency L.5 Instructions to Offerors – Competitive Acquisition L.6 Type of Contract L.7 Construction Wage Rate Requirements – Secondary Site of the Work L.8 Notice of Buy American Requirement – Construction Materials L.9 Bid Guarantee L.10 Individual Surety – Pledge of Assets L.11 Site Visit (Construction) – Alternate I L.12 DIAR Use and Disclosure of Proposal Information – Department of the Interior L.13 Additive or Deductive Items – Department of the Interior L.14 Restrictions on Contacts L.15 Submittal of Questions L.16 Performance and Payment Bonds L.17 Supplemental Instructions – Preparation of Proposal – Competitive Acquisition L.18 Proposal Submittal L.19 Volume Format Instructions L.20 Volume 1: Required Documentation
L.21 Volume 2: Factor 1, Technical Approach/Capabilities L.22 Volume 3: Factor 2, Past Performance L.23 Volume 4: Factor 3, Pricing
SECTION M – EVALUATION FACTORS FOR AWARD
M.1 Basis for Contract Award M.2 Tradeoff Evaluation Process M.3 Volume 1: Required Documentation M.4 Volume 2: Factor 1, Technical Approach/Capabilities M.5 Volume 3: Factor 2, Past Performance M.6 Volume 4: Factor 3, Pricing
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040530784
BLM MT-STATE OFC(MT935)
5001 SOUTHGATE DR.
BILLINGS MT 59101
LMA
BLM - Montana State Office
Attn: Christine Mundt 5001 Southgate Drive Billings, MT 59101
Christine Mundt (406) 896-5030
1x 06/29/2021
140L3621R0002
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
A. Project Title: Middle Two Calf Road Reconstruction, Montana
B. Location of the Work: The place of performance is located in Fergus County near
Winifred, MT.
C. Estimated Range of the Project: The estimated price range of this acquisition is between $250,000 and $500,000.
D. The North American Industrial Classification System (NAICS) Code is 237310. The applicable Small Business Size Standard is $39.5 Million.
E. This solicitation is issued as a Total Small Business Set-Aside procurement.
F. Data Universal Number System (DUNS) Number:________________________
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 91 calendar days and complete it within ________________ ________________ calendar days after receiving
FAR 52.211-10
07/29/2021
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
BLM MT STATE OFC(MT935)
5001 SOUTHGATE DR.
BILLINGS MT 59101
LMA
Christine Mundt
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140L3621R0002
Period of Performance: 08/19/2021 to 11/28/2021
00010 Base Schedule - Furnish all labor, material, transportation and supervision for complete and functional project IAW specifications and drawings.
Product/Service Code: Y1LB
Product/Service Description: CONSTRUCTION OF
HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
00020 Additive Schedule A - 250 Tons Class 4 Rip Rap near existing crossing
Product/Service Code: Y1LB
Product/Service Description: CONSTRUCTION OF
HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
00030 Additive Schedule B - 1 Reseed decommissioned road beds and all disturbed areas outside of roadway
Product/Service Code: Y1LB
Product/Service Description: CONSTRUCTION OF
HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
SECTION B – SUPPLIES OR SERVICES AND PRICES
B.1 Offerors are to complete Block 17 of the SF 1442 with the total proposed fixed price by adding the total price for all additive schedules to the total price for the base schedule.
B.2 PRICE SCHEDULE
(a) Offers will be considered for award on the following Schedule, but no offer will be considered for award on only a part of the Schedule. So that the Government may obtain the most desirable features of work within the limit of its funds available at time of proposal evaluation, award may be made to the offeror having the lowest total of the base schedule and a combination of additive items. All offers shall be evaluated on the basis of the same additive items using the order of priority of the items listed in the schedule. Evaluation of additive items will not obligate the Government to award the items.
(b) All offers are subject to the terms and conditions of this solicitation.
BASE SCHEDULE
Item No. Item Description Quantity Unit Unit Price Amount
Furnish all labor, material, transportation and supervision for complete and functional project IAW specifications and drawings
1 LS $ $
ADDITIVE SCHEDULE A
Item No. Item Description Quantity Unit Unit Price Amount
1 Stockpile 250 tons of class 4 rip rap near existing crossing 1 LS $ $
ADDITIVE SCHEDULE B
Item No. Item Description Quantity Unit Unit Price Amount
1 Reseed decommissioned road beds and all disturbed areas outside of roadway 1 LS $ $
TOTAL ESTIMATED COST
(Base Schedule Only) $
(Base Schedule + Additive Schedule A) $
(Base Schedule + Additive Schedule A + Additive Schedule B)
END OF SCHEDULE
SECTION C – SPECIFICATIONS/DRAWINGS
C.1 Specifications and Drawings are attached and incorporated herein by reference, see Section J and Attachments.
SECTION D – PACKAING AND MARKING
Not Applicable
SECTION E -- INSPECTION AND ACCEPTANCE
E.1 52.246-12 INSPECTION OF CONSTRUCTION AUG 1996
(a) Definition – “Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not-
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this- section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may-
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor’s right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
E.2 52.246-21 WARRANTY OF CONSTRUCTION MAR 1994
(a) In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph (i) of this clause, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier.
(b) This warranty shall continue for a period of 1 year from the date of final acceptance of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date the Government takes possession.
(c) The Contractor shall remedy at the Contractor’s expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor’s expense any damage to Government-owned or controlled real or personal property, when that damage is the result of-
(1) The Contractor’s failure to conform to contract requirements; or
(2) Any defect of equipment, material, workmanship, or design furnished.
(d) The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. The Contractor’s warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement.
(e) The Contracting Officer shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage.
(f) If the Contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor’s expense.
(g) With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall-
(1) Obtain all warranties that would be given in normal commercial practice;
(2) Require all warranties to be executed, in writing, for the benefit of the Government, if directed by the Contracting Officer; and
(3) Enforce all warranties for the benefit of the Government, if directed by the Contracting Officer.
(h) In the event the Contractor’s warranty under paragraph (b) of this clause has expired, the Government may bring suit at its expense to enforce a subcontractor’s, manufacturer’s, or supplier’s warranty.
(i) Unless a defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material or design furnished by the Government nor for the repair of any damage that results from any defect in Government-furnished material or design.
(j) This warranty shall not limit the Government’s rights under the Inspection and Acceptance clause of this contract with respect to latent defects, gross mistakes, or fraud.
SECTION F -- DELIVERIES OR PERFORMANCE
F.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK APR 1984
The Contractor shall be required to:
(a) Commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,
(b) Prosecute the work diligently, and
(c) Complete the entire work ready for use not later than 91 calendar days after receipt of the notice to proceed.
The time stated for completion shall include final cleanup of the premises.
F.2 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS APR 1984
(a) The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.
(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the Contracting Officer. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.
(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.
F.3 52.242-14 SUSPENSION OF WORK APR 1984
(a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.
(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted
(1) By an act of the Contracting Officer in the administration of this contract, or
(2) By the Contracting Officer’s failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly. However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.
(c) A claim under this clause shall not be allowed-
(1) For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order); and
(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.
SECTION G -- CONTRACT ADMINISTRATION DATA
G.1 DIAR
1452.201-70 AUTHORITIES AND DELEGATIONS SEP 2011
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph
(e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
G.2 DOI-AAAP-
ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS -
INVOICE PROCESSING PLATFORM (IPP) APR 2013
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
1. Invoice date and Government Contract Number
2. Billing period specified with beginning and ending dates. The beginning date must not be later than the completion date or within any previous billing dates.
3. The accounting must follow the approved schedule of values as described in the specification attachment.
4. Total amount due for the billing period
5. Certification of Progress Payment
6. Payrolls (Mail weekly)
7. Substantiation of Subcontractor Payment
8. A Release of Claims (See 1452.204-70) with a request for final payment.
Note – Prior to IPP Invoice submission, Contractors shall coordinate an informal pre-review of their invoice documents. A Progress Report (may be included in Progress Meeting Notes) shall be submitted to support each invoice and shall include a summary of work performed during the period of performance identified on the invoice, which at a minimum must include:
1. ACTIVITY: Description of the previous month’s project activities and the planned activities for the next month. Also, describe activities performed on contingency task(s), percent complete, task or deliverable schedule and identify any issues or concerns that may affect the performance and/or completion of the task(s);
2. PERCENTAGE COMPLETE: In accordance with the accepted Schedule of Values, for each task/deliverable: identify the percentage completed during the month and the cumulative percentage completed;
3. SCHEDULE: Reconcile progress of each task/deliverable with the schedule identified for each;
submit a revised schedule as required.
4. ISSUES OR CONCERNS: Identify issues and/or concerns that may affect the project Statement of
Work (SOW) or schedule.
5. OTHER INFORMATION: Any other information required in the Contract to be included in the
Progress Report.
https://www.ipp.gov/
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
G.3 LOCAL INVOICE PROCESSING PLATFORM (IPP) HOTLINE
To check payment status, contact the Payment Hotline at 877-480-9724 or 303-236-2850. You will need to leave a message with the following information:
1. Company Name
2. Contract Number
3. Invoice Number
4. Invoice Amount
5. A brief description of why you are calling
6. Your contact information
If you do not receive a callback from the Payment Hotline within 72 hours, please contact the Contract Officer with the day and time you contacted the Payment Hotline.
G.4 GOVERNMENT POINT OF CONTACT
Attn: Christine Mundt 5001 Southgate Drive Billings, MT 59101 Phone: 406-896-5030 Email: cmundt@blm.gov mailto:IPPCustomerSupport@fiscal.treasury.gov mailto:cmundt@blm.gov
SECTION H -- SPECIAL PURCHASE ORDER REQUIREMENTS
H.1 WORK HOURS
The performance period established for this contract is based upon all work being conducted during regular working hours between 7:30 am and 5:30 pm, Monday through Friday, excluding government holidays. If the Contractor desires to carry on work outside regular hours, including Saturdays, Sundays, and government holidays, a request must be submitted to the Contracting Officer in sufficient time to allow satisfactory arrangements to be made by the Government for access to the work site and inspection.
H.2 FIRE DANGER SEASON
If the Contracting Officer Representative (COR) allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR.
H.3 DRAWINGS
(a) Typical Drawings - Any drawings titled typical are general only and dimensions of each structure will be fixed by the Contracting Officer to adapt the design to existing conditions at the structure location.
(b) Reduced Size Drawings - Any drawings identified as "REDUCED SIZE DRAWINGS" appearing in the solicitation are photographically reduced in size. Accordingly, measurements and dimensions should not be taken or be based on any numerical scales shown. Prospective bidders desiring to review a copy of the full-size drawings may contact the Contracting Officer identified in the solicitation.
H.4 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA
(a) The Historic and Archeological Data Preservation Act of 1974, provides for the preservation of historical and archeological data that might otherwise be lost as the result of alterations to the terrain caused by a federal or federally licensed activity or program.
(b) If, in connection with operations under this contract, the Contractor, subcontractors, or the employees of any of them, discovers, encounters or becomes aware of any possible historical or archeological data, objects or sites of cultural value on the project area, such as historical ruins, graves or grave markers, fossils, or artifacts, the Contractor shall immediately suspend all operations in the vicinity of the cultural value and shall notify the Contracting Officer in writing, giving the location and nature of the findings. No objects of cultural resource value may be removed.
(c) Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the Changes clause.
(d) The Contractor will be responsible for protecting the cultural resources within the affected area from damage.
In addition, the contractor will be liable for all damage to the identified cultural resources caused by their actions or the actions of their agents or representatives. The Contractor shall immediately notify the Contracting Officer or his representative if any damage occurs to any cultural resource and immediately suspend work in the area in which damage has occurred until authorized to proceed.
H.5 SAFETY AND QUALITY CONTROL PLAN
Within 10 days following contract award, the contractor must provide effective quality control/assurance and safety plans for acceptance by the Government.
H.6 FEDERAL HOLIDAYS
Federal law (5 U.S.C. 6103) establishes the public holidays for Federal employees. Please note that most Federal employees work on a Monday through Friday schedule. For these employees, when a holiday falls on a nonworkday -- Saturday or Sunday -- the holiday usually is observed on Monday (if the holiday falls on Sunday) or Friday (if the holiday falls on Saturday).
To see holidays for a specific year, please visit https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/
2021 Holiday Schedule Date Holiday
Friday, January 1 New Year’s Day
Monday, January 18 Birthday of Martin Luther King, Jr.
Wednesday, January 20* Inauguration Day
Monday, February 15** Washington’s Birthday
Monday, May 31 Memorial Day
Monday, July 5*** Independence Day
Monday, September 6 Labor Day
Monday, October 11 Columbus Day
Thursday, November 11 Veterans Day
Thursday, November 25 Thanksgiving Day
Friday, December 24**** Christmas Day
*This holiday is designated as "Inauguration Day" in section 6103(c) of title 5 of the United States Code, which is the law that specifies holidays for Federal employees. Federal employees in the Washington, DC area are entitled to a holiday on the day a President is inaugurated, January 20 for each fourth year after 1965. Though other institutions such as state and local governments and private businesses may use other names, it is our policy to always refer to holidays by the names designated in the law.
**This holiday is designated as "Washington’s Birthday" in section 6103(a) of title 5 of the United States Code, which is the law that specifies holidays for Federal employees. Though other institutions such as state and local governments and private businesses may use other names, it is our policy to always refer to holidays by the names designated in the law.
***July 4, 2021 (the legal public holiday for Independence Day), falls on a Sunday. For most Federal employees, Monday, July 5, will be treated as a holiday for pay and leave purposes. (See 5 U.S.C. 6103(b).)
****December 25, 2021 (the legal public holiday for Christmas Day), falls on a Saturday. For most Federal employees, Friday, December 24, will be treated as a holiday for pay and leave purposes. (See section 3(a) of Executive order 11582, February 11, 1971.)
https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/ https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/
H.7 LIMITATIONS ON SUBCONTRACTING REPORTING
In accordance with 52.219-14 Limitations on Subcontracting, the prime contractor must perform at least
15% for general construction and
25% for construction by special trade contractors of the cost of the contract, excluding the cost of materials with its own employees and employees of a similarly situated subcontractor.
A similarly situated subcontractor is a small business concern subcontractor that is a participant of the same SBA program that qualified the prime contractor as an eligible offeror and awardee of the contract. The contractor is responsible for ensuring compliance with the Limitation on Subcontracting.
At the conclusion of the period of performance and prior to final payment, the contractor shall submit a Limitation on Subcontracting Report directly to the Contracting Officer. The following information is required as part of the report:
(1) the total amount paid to the Prime during the performance period broken out by labor and materials
(2) list of Similarly Situated Subcontractors and the amounts paid to each during the performance period broken out by labor and materials
(3) list of any other subcontractors and the amounts paid to each during the performance period broken out by labor and materials.
If the Contracting Officer review of the report finds that the contractor is not in compliance for the period of performance, the contractor will be notified in writing. Penalties for failure to comply are described in 13 CFR 125.6(h) which states:
Whoever violates the requirements set forth in paragraph (a) of this section shall be subject to the penalties prescribed in 15 U.S.C. 645(d), except that the fine shall be treated as the greater of $500,000 or the dollar amount spent, in excess of permitted levels, by the entity on subcontractors. A party's failure to comply with the spirit and intent of a subcontract with a similarly situated entity may be considered a basis for debarment on the grounds, including but not limited to, that the parties have violated the terms of a Government contract or subcontract pursuant to FAR 9.406-2(b)(1)(i) (48 CFR 9.406-2(b)(1)(i)).
SECTION I – CONTRACT CLAUSES
I.1 52.252-02 CLAUSES INCORPORATED BY REFERENCE FEB 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at the following address:
https://www.acquisition.gov/far/
CLAUSE TITLE DATE
52.202-1 DEFINITIONS JUN 2020
52.203-3 GRATUITIES APR 1984
52.203-5 COVENANT AGAINST CONTINGENT FEES MAY 2014
52.203-7 ANTI-KICKBACK PROCEDURES JUN 2020
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR
ILLEGAL OR IMPROPER ACTIVITY MAY 2014
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY MAY 2014
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS JUN 2020
52.203-17
CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND
REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER
RIGHTS
JUN 2020
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL
CONFIDENTIALITY AGREEMENTS OR STATEMENTS JAN 2017
52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER
CONTENT PAPER MAY 2011
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER
SUBCONTRACT AWARDS JUN 2020
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE OCT 2018
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE AUG 2020
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS DEC 2014
52.204-23
PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND
SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND
OTHER COVERED ENTITIES
JUL 2018
52.204-25
PROHIBITION ON CONTRACTING FOR CERTAIN
TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR
EQUIPMENT
AUG 2020
52.209-6
PROTECTING THE GOVERNMENT'S INTEREST WHEN
SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED,
OR PROPOSED FOR DEBARMENT
JUN 2020
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS NOV 2015
52.215-2 AUDIT AND RECORDS – NEGOTIATION JUN 2020
52.215-8 ORDER OF PRECEDENCE-UNIFORM CONTRACT FORMAT OCT 1997
52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET ASIDE NOV 2020
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS OCT 2018
52.219-14 LIMITATIONS ON SUBCONTRACTING MAR 2020
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REPRESENTATION NOV 2020
52.222-3 CONVICT LABOR JUN 2003
52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT -
OVERTIME COMPENSATION MAR 2018
https://www.acquisition.gov/far/
52.222-6 CONSTRUCTION WAGE REQUIREMENTS AUG 2018
52.222-7 WITHHOLDING OF FUNDS MAY 2014
52.222-8 PAYROLLS AND BASIC RECORDS AUG 2018
52.222-9 APPRENTICES AND TRAINEES JUL 2005
52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS FEB 1988
52.222-11 SUBCONTRACTS (LABOR STANDARDS) MAY 2014
52.222-12 CONTRACT TERMINATION-DEBARMENT MAY 2014
52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS
AND RELATED ACT REGULATIONS MAY 2014
52.222-14 DISPUTES CONCERNING LABOR STANDARDS FEB 1988
52.222-15 CERTIFICATION OF ELIGIBILITY MAY 2014
52.222-21 PROHIBITION OF SEGREGATED FACILITIES APR 2015
52.222-26 EQUAL OPPORTUNITY SEP 2016
52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR
CONSTRUCTION APR 2015
52.222-37 EMPLOYMENT REPORTS VETERANS JUN 2020
52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL
LABOR RELATIONS ACT DEC 2010
52.222-50 COMBATING TRAFFICKING IN PERSONS OCT 2020
52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 NOV 2020
52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 JAN 2017
52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION MAY 2011
52.223-6 DRUG FREE WORKPLACE MAY 2001
52.223-18 ENCOURAGING CONTRACTOR POLICY TO BAN TEXT MESSAGING
WHILE DRIVING JUN 2020
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES FEB 2021
52.227-1 AUTHORIZATION AND CONSENT JUN 2020
52.227-4 PATENT INDEMNITY – CONSTRUCTION CONTRACTS DEC 2007
52.228-5 INSURANCE – WORK ON A GOVERNMENT INSTALLATION JAN 1997
52.228-11 PLEDGES OF ASSETS FEB 2021
52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS MAY 2014
52.228-14 IRREVOCABLE LETTER OF CREDIT NOV 2014
52.229-3 FEDERAL, STATE AND LOCAL TAXES FEB 2013
52.229-11 TAX ON CERTAIN FOREIGN PROCUREMENTS—NOTICE AND
REPRESENTATION JUN 2020
52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS MAY 2014
52.232-17 INTEREST MAY 2014
52.232-23 ASSIGNMENT OF CLAIMS MAY 2014
52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS JAN 2017
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER-- SYSTEM FOR
AWARD MANAGEMENT OCT 2018
52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS JUN 2013
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
SUBCONTRACTORS DEC 2013
52.233-1, ALT
I DISPUTES – ALTERNATE I DEC 1991
52.233-3 PROTEST AFTER AWARD AUG 1996
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM OCT 2004
52.236-2 DIFFERING SITE CONDITIONS APR 1984
52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK APR 1984
52.236-5 MATERIAL AND WORKMANSHIP APR 1984
52.236-6 SUPERINTENDENCE BY THE CONTRACTOR APR 1984
52.236-7 PERMITS AND RESPONSIBILITIES NOV 1991
52.236-8 OTHER CONTRACTS APR 1984
52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, APR 1984
UTILITIES, AND IMPROVEMENTS.
52.236-10 OPERATIONS AND STORAGE AREAS APR 1984
52.236-11 USE AND POSSESSION PRIOR TO COMPLETION APR 1984
52.236-12 CLEANING UP APR 1984
52.236-13 ACCIDENT…