Attachment_1_-_Middle_Two_Calf_Road_Technical_Specifications.pdf
PDF 246 KB Posted
- Attached to
- MIDDLE TWO CALF ROAD RECONSTRUCTION Federal contract opportunity
- Solicitation number
- 140L3621R0002
About this file
This notice describes a federal solicitation for reconstruction work on Middle Two Calf Road near Winifred, Montana. The Bureau of Land Management is seeking proposals to decommission and reconstruct two sections of the road, including demolishing the existing road surface, grading the site for a new alignment, constructing two stream crossings and repairing one existing crossing, installing culverts, and seeding disturbed areas. Offerors must submit fixed-price proposals by July 29, 2021. The contract award is scheduled for August 19, 2021, and work must begin within 10 days of notice to proceed and be complete within 91 calendar days. The estimated price range for the acquisition is $250,000 to $500,000. The solicitation is set aside for small businesses under NAICS code 237310 with a size standard of $39.5 million.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 140L3621R0002_Amendment_2_(Issued)_0002.pdf | ||
| Sol_140L3621R0002_Amd_0002.pdf | ||
| 140L3621R0002_Amendment_1_(Issued)_0001.pdf | ||
| Sol_140L3621R0002_Amd_0001.pdf | ||
| Attachment_10_-_DI-137_Release_of_Claims.pdf | ||
| Attachment_2_-_Middle_Two_Calf_Road_Reconstruction_Drawings.pdf | ||
| 140L3621R0001_Solicitation_Package_(Issued).pdf | ||
| Attachment_9_-_SFA_Payment_Bond.pdf | ||
| Attachment_7_-_SF_24_Bid_Bond.pdf | ||
| Sol_140L3621R0002.pdf | ||
| Attachment_8_-_SF25_Performance_Bond.pdf | ||
| Attachment_6_-_Financial_Responsibility_Required_Documentation.pdf | ||
| Attachment_5_-_Past_Performance_Questionnaire.pdf | ||
| Attachment_4_-_Reference_List.pdf | ||
| Attachment_3_-_General_Decision_Number.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Middle Two Calf Road Winifred, Montana
04-30-2020 Table of Contents 00 0110 1 of 1
SECTION 00 0110
TABLE OF CONTENTS
00 0110 - TABLE OF CONTENTS
SPECIFICATIONS
DIVISION 01 -- GENERAL REQUIREMENTS
01 1000 - SUMMARY
01 3000 - ADMINISTRATIVE REQUIREMENTS
01 4000 - QUALITY REQUIREMENTS
01 5000 - TEMPORARY FACILITIES AND CONTROLS
01 5500 - VEHICULAR ACCESS AND PARKING
A. 01 5713 - Temporary Erosion and Sediment Control
01 7000 - EXECUTION AND CLOSEOUT REQUIREMENTS
DIVISION 31 -- EARTHWORK
3.01 31 1000 - SITE CLEARING
3.02 31 2200 - GRADING
3.03 31 2316 - EXCAVATION
3.04 31 2316.13 - TRENCHING
3.05 31 2323 - FILL
3.06 31 3700 - RIPRAP
DIVISION 32 -- EXTERIOR IMPROVEMENTS
4.01 32 1123 - AGGREGATE BASE COURSES
4.02 32 9219 - SEEDING
DIVISION 33 -- UTILITIES
5.01 33 4213 - STORMWATER CULVERTS
END OF SECTION
04-30-2020 Summary 01 1000 1 of 1
SECTION 01 1000
SUMMARY
PART 1 GENERAL
1.01 PROJECT
A. The Project consists of decommissioning and reconstructing two sections of Middle Two Calf Road.
Work to Include but not limited to:.
SITEWORK
1. Demolition, including decomissioning and revegetating existing road surface.
2. Site grading and construction of new road alignment.
3. New construction of two (2) stream crossings,.
4. Repairing one (1) existing stream crossing.
5. Installing culverts under roadway.
6. Add Alternates
a. Stockpile rip-rap at staging area near existing stream crossing.
b. Reseed decomissioned road beds and all disturbed areas outside of new roadway with certified weed-free seed mix
c. Provide construction staking by qualified surveyor with demostrated experience.
B. CONTRACT DESCRIPTION
1. WORK SEQUENCE
a. Coordinate construction schedule and operations with BLM.
b. Avoid any construction activities or movement of equipment between December and March
31, to protect hibernating amphibians.
c. BLM intends to reseed site with BLM supplied seed after project is finished.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
04-30-2020 Administrative Requirements 01 3000 1 of 6
SECTION 01 3000
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. General administrative requirements.
B. Preconstruction meeting.
C. Site mobilization meeting.
D. Progress meetings.
E. Construction progress schedule.
F. Contractor's daily reports.
G. Progress photographs.
H. Coordination drawings.
I. Submittals for review, information and project closeout.
J. Number of copies of submittals.
K. Requests for Interpretation (RFI) procedures.
L. Submittal procedures.
1.02 GENERAL ADMINISTRATIVE REQUIREMENTS
A. Comply with requirements of Section 01 7000 - Execution and Closeout Requirements for coordination of execution of administrative tasks with timing of construction activities.
B. Make the following types of submittals to Contracting Officer:
1. Requests for Interpretation (RFI).
2. Requests for substitution.
3. Shop drawings, product data, and samples.
4. Test and inspection reports.
5. Design data.
6. Manufacturer's instructions and field reports.
7. Applications for payment and change order requests.
8. Progress schedules.
9. Coordination drawings.
10. Correction Punch List and Final Correction Punch List for Substantial Completion.
11. Closeout submittals.
1.03 PROJECT COORDINATOR
A. Project Coordinator: Construction Manager.
B. Cooperate with the Project Coordinator in allocation of mobilization areas of site; for field offices and sheds, for site access, traffic, and parking facilities.
C. During construction, coordinate use of site and facilities through the Project Coordinator.
D. Comply with Project Coordinator's procedures for intra-project communications; submittals, reports and records, schedules, coordination drawings, and recommendations; and resolution of ambiguities and conflicts.
E. Comply with instructions of the Project Coordinator for use of temporary utilities and construction facilities.
F. Coordinate field engineering and layout work under instructions of the Project Coordinator.
G. Make the following types of submittals to Designated Representative through the Project Coordinator:
1. Requests for Interpretation.
2. Requests for substitution.
3. Shop drawings, product data, and samples.
04-30-2020 Administrative Requirements 01 3000 2 of 6
4. Test and inspection reports.
5. Design data.
6. Manufacturer's instructions and field reports.
7. Applications for payment and change order requests.
8. Progress schedules.
9. Coordination drawings.
10. Correction Punch List and Final Correction Punch List for Substantial Completion.
11. Closeout submittals.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 PRECONSTRUCTION MEETING
A. Project Coordinator will schedule a meeting after Notice of Award.
B. Attendance Required:
1. BLM.
2. Contractor.
C. Agenda:
1. Execution of BLM-Contractor Agreement.
2. Submission of executed bonds and insurance certificates.
3. Distribution of Contract Documents.
4. Submission of list of subcontractors, list of products, schedule of values, and progress schedule.
5. Designation of personnel representing the parties to Contract.
6. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.
7. Scheduling.
D. Record minutes and distribute copies within two days after meeting to participants, with two copies to Contracting Officer, BLM, participants, and those affected by decisions made.
3.02 SITE MOBILIZATION MEETING
A. Project Coordinator will schedule meeting at the Project site prior to Contractor occupancy.
B. Attendance Required:
1. Contractor.
2. BLM.
3. Contractor's superintendent.
4. Major subcontractors.
C. Agenda:
1. Use of premises by BLM and Contractor.
2. BLM's requirements.
3. Construction facilities and controls provided by BLM.
4. Temporary utilities provided by BLM.
5. Survey and layout.
6. Security and housekeeping procedures.
7. Schedules.
8. Application for payment procedures.
9. Procedures for maintaining record documents.
10. Requirements for start-up of equipment.
11. Inspection and acceptance of equipment put into service during construction period.
04-30-2020 Administrative Requirements 01 3000 3 of 6
D. Record minutes and distribute copies within two days after meeting to participants, with two copies to Contracting Officer, BLM, participants, and those affected by decisions made.
3.03 CONSTRUCTION PROGRESS SCHEDULE - SEE SECTION 01 3216
A. If preliminary schedule requires revision after review, submit revised schedule within 10 days.
B. Within 20 days after review of preliminary schedule, submit draft of proposed complete schedule for review.
1. Include written certification that major contractors have reviewed and accepted proposed schedule.
C. Within 10 days after joint review, submit complete schedule.
D. Submit updated schedule with each Application for Payment.
3.04 DAILY CONSTRUCTION REPORTS
A. Contractor shall keep daily construction reports and make them available to the government..
3.05 PROGRESS PHOTOGRAPHS
A. Submit photographs with each application for payment, taken not more than 3 days prior to submission of application for payment.
B. Submit a minimum of 20 photographs representative of all ongoing work.
C. Photography Type: Digital; electronic files.
D. Provide photographs of site and construction throughout progress of work produced by an experienced photographer, acceptable to Contracting Officer.
E. In addition to periodic, recurring views, take photographs of each of the following events:
1. Completion of site clearing.
2. Excavations in progress.
3. Final completion, minimum of ten (10) photos.
F. Views:
1. Provide non-aerial photographs from four cardinal views at each specified time, until date of
Substantial Completion.
2. Consult with Contracting Officer for instructions on views required.
3. Provide factual presentation.
4. Provide correct exposure and focus, high resolution and sharpness, maximum depth of field, and minimum distortion.
G. Digital Photographs: 24 bit color, minimum resolution of 1024 by 768, in JPG format; provide files unaltered by photo editing software.
1. Delivery Medium: Via email.
2. File Naming: Include project identification, date and time of view, and view identification.
3. PDF File: Assemble all photos into printable pages in PDF format, with 2 to 3 photos per page, each photo labeled with file name; one PDF file per submittal.
4. Hard Copy: Printed hardcopy (grayscale) of PDF file and point of view sketch.
3.06 COORDINATION DRAWINGS
A. Provide information required by Project Coordinator for preparation of coordination drawings.
B. Review drawings prior to submission to Contracting Officer.
3.07 REQUESTS FOR INTERPRETATION (RFI)
A. Definition: A request seeking one of the following:
1. An interpretation, amplification, or clarification of some requirement of Contract Documents arising from inability to determine from them the exact material, process, or system to be installed; or when the elements of construction are required to occupy the same space (interference); or when an item of work is described differently at more than one place in
04-30-2020 Administrative Requirements 01 3000 4 of 6
Contract Documents.
B. Preparation: Prepare an RFI immediately upon discovery of a need for interpretation of Contract
Documents. Failure to submit a RFI in a timely manner is not a legitimate cause for claiming additional costs or delays in execution of the work.
1. Prepare a separate RFI for each specific item.
a. Review, coordinate, and comment on requests originating with subcontractors and/or materials suppliers.
b. Do not forward requests which solely require internal coordination between subcontractors.
2. Prepare in a format and with content acceptable to BLM.
C. Reason for the RFI: Prior to initiation of an RFI, carefully study all Contract Documents to confirm that information sufficient for their interpretation is definitely not included.
1. Include in each request Contractor's signature attesting to good faith effort to determine from
Contract Documents information requiring interpretation.
2. Unacceptable Uses for RFIs: Do not use RFIs to request the following::
a. Approval of submittals (use procedures specified elsewhere in this section).
b. Approval of substitutions (see Section - 01 6000 - Product Requirements)
c. Changes that entail change in Contract Time and Contract Sum (comply with provisions of the Conditions of the Contract).
d. Different methods of performing work than those indicated in the Contract Drawings and
Specifications (comply with provisions of the Conditions of the Contract).
3. Improper RFIs: Requests not prepared in compliance with requirements of this section, and/or missing key information required to render an actionable response. They will be returned without a response, with an explanatory notation.
D. Attachments: Include sketches, coordination drawings, descriptions, photos, submittals, and other information necessary to substantiate the reason for the request.
E. Review Time: The designated construction representative will respond and return RFIs to Contractor within seven calendar days of receipt. For the purpose of establishing the start of the mandated response period, RFIs received after 12:00 noon will be considered as having been received on the following regular working day.
1. Response period may be shortened or lengthened for specific items, subject to mutual agreement, and recorded in a timely manner in progress meeting minutes.
F. Responses: Content of answered RFIs will not constitute in any manner a directive or authorization to perform extra work or delay the project. If in Contractor's belief it is likely to lead to a change to Contract Sum or Contract Time, promptly issue a notice to this effect, and follow up with an appropriate Change Order request to BLM.
1. Response may include a request for additional information, in which case the original RFI will be deemed as having been answered, and an amended one is to be issued forthwith. Identify the amended RFI with an R suffix to the original number.
3.08 SUBMITTAL SCHEDULE
A. Submit to designated construction representative for review a schedule for submittals in tabular format.
1. Account for time required for preparation, review, manufacturing, fabrication and delivery when establishing submittal delivery and review deadline dates.
3.09 SUBMITTALS FOR REVIEW
A. When the following are specified in individual sections, submit them for review:
1. Product data.
04-30-2020 Administrative Requirements 01 3000 5 of 6
2. Design data.
3. Shop drawings.
B. Submit to designated construction representative for review for the limited purpose of checking for compliance with information given and the design concept expressed in Contract Documents.
3.10 SUBMITTALS FOR INFORMATION
A. When the following are specified in individual sections, submit them for information:
1. Certificates.
2. Test reports.
3. Inspection reports.
4. Manufacturer's instructions.
5. Manufacturer's field reports.
6. Other types indicated.
B. Submit for Contracting Officer's knowledge as contract administrator or for BLM.
3.11 SUBMITTALS FOR PROJECT CLOSEOUT
A. Submit Correction Punch List for Substantial Completion.
B. Submit Final Correction Punch List for Substantial Completion.
C. When the following are specified in individual sections, submit them at project closeout in compliance with requirements of Section 01 7800 - Closeout Submittals:
1. Project record documents.
2. Operation and maintenance data.
3. Warranties.
4. Bonds.
5. Other types as indicated.
D. Submit for BLM's benefit during and after project completion.
3.12 NUMBER OF COPIES OF SUBMITTALS
A. Electronic Documents: Submit one electronic copy in PDF format; an electronically-marked up file will be returned. Create PDFs at native size and right-side up; illegible files will be rejected.
3.13 SUBMITTAL PROCEDURES
A. General Requirements:
1. Use a single transmittal for related items.
2. Submit separate packages of submittals for review and submittals for information, when included in the same specification section.
3. Transmit using BLM approved form.
4. Sequentially identify each item. For revised submittals use original number and a sequential numerical suffix.
5. Identify: Project; Contractor; subcontractor or supplier; pertinent drawing and detail number;
and specification section number and article/paragraph, as appropriate on each copy.
6. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of products required, field dimensions, adjacent construction work, and coordination of information is in accordance with the requirements of the work and Contract Documents.
7. Schedule submittals to expedite the Project, and coordinate submission of related items.
a. For each submittal for review, allow 15 days excluding delivery time to and from the
Contractor.
b. For sequential reviews involving Contracting Officer's consultants, BLM, or another affected party, allow an additional 7 days.
04-30-2020 Administrative Requirements 01 3000 6 of 6
c. For sequential reviews involving approval from authorities having jurisdiction (AHJ), in addition to Contracting Officer's approval, allow an additional 30 days.
8. Provide space for Contractor and Contracting Officer review stamps.
9. When revised for resubmission, identify all changes made since previous submission.
10. Distribute reviewed submittals. Instruct parties to promptly report inability to comply with requirements.
11. Incomplete submittals will not be reviewed, unless they are partial submittals for distinct portion(s) of the work, and have received prior approval for their use.
12. Submittals not requested will not be recognized or processed.
B. Product Data Procedures:
1. Submit only information required by individual specification sections.
2. Collect required information into a single submittal.
3. Submit concurrently with related shop drawing submittal.
4. Do not submit (Material) Safety Data Sheets for materials or products.
C. Shop Drawing Procedures:
1. Prepare accurate, drawn-to-scale, original shop drawing documentation by interpreting Contract
Documents and coordinating related work.
2. Do not reproduce Contract Documents to create shop drawings.
3. Generic, non-project-specific information submitted as shop drawings do not meet the requirements for shop drawings.
3.14 SUBMITTAL REVIEW
A. Submittals for Review: designated construction representative will review each submittal, and approve, or take other appropriate action.
B. Submittals for Information: designated construction representative will acknowledge receipt and review. See below for actions to be taken.
C. Contracting Officer's actions will be reflected by marking each returned submittal using virtual stamp on electronic submittals.
1. Notations may be made directly on submitted items and/or listed on appended Submittal Review cover sheet.
D. Contracting Officer's and consultants' actions on items submitted for review:
1. Authorizing purchasing, fabrication, delivery, and installation:
a. "Approved", or language with same legal meaning.
b. "Approved as Noted, Resubmission not required", or language with same legal meaning.
1) At Contractor's option, submit corrected item, with review notations acknowledged and incorporated.
c. "Approved as Noted, Resubmit for Record", or language with same legal meaning.
2. Not Authorizing fabrication, delivery, and installation:
E. Contracting Officer's and consultants' actions on items submitted for information:
1. Items for which no action was taken:
a. "Received" - to notify the Contractor that the submittal has been received for record only.
2. Items for which action was taken:
a. "Reviewed" - no further action is required from Contractor.
04-30-2020 Quality Requirements 01 4000 1 of 3
SECTION 01 4000
QUALITY REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Submittals.
B. Quality assurance.
C. References and standards.
D. Testing and inspection agencies and services.
E. Control of installation.
F. Tolerances.
G. Defect Assessment.
1.02 DEFINITIONS
A. Contractor's Quality Control Plan: Contractor's management plan for executing the Contract for
Construction.
1.03 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements, for submittal procedures.
B. Designer's Qualification Statement: Submit for Contracting Officer's knowledge as contract administrator, or for BLM's information.
1. Include information for each individual professional responsible for producing, or supervising production of, design-related professional services provided by Contractor.
a. Full name.
b. Professional licensure information.
c. Statement addressing extent and depth of experience specifically relevant to design of items assigned to Contractor.
C. Test Reports: After each test/inspection, promptly submit two copies of report to Contracting Officer and to Contractor .
1. Include:
a. Date issued.
b. Project title and number.
c. Name of inspector.
d. Date and time of sampling or inspection.
e. Identification of product and specifications section.
f. Location in the Project.
g. Type of test/inspection.
h. Date of test/inspection.
i. Results of test/inspection.
j. Compliance with Contract Documents.
k. When requested by Contracting Officer, provide interpretation of results.
D. Certificates: When specified in individual specification sections, submit certification by the manufacturer and Contractor or installation/application subcontractor to Contracting Officer, in quantities specified for Product Data.
1. Indicate material or product complies with or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.
2. Certificates may be recent or previous test results on material or product, but must be acceptable to Contracting Officer.
04-30-2020 Quality Requirements 01 4000 2 of 3
E. Manufacturer's Instructions: When specified in individual specification sections, submit printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing, for the BLM's information. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation.
1.04 QUALITY ASSURANCE
A. Quality-Control Personnel Qualifications. Engage a person with requisite training and experience to implement and manage quality assurance (QA) and quality control (QC) for the project.
1.05 REFERENCES AND STANDARDS
A. For products and workmanship specified by reference to a document or documents not included in the Project Manual, also referred to as reference standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes.
B. Comply with reference standard of date of issue current on date of Contract Documents, except where a specific date is established by applicable code.
C. Obtain copies of standards where required by product specification sections.
D. Maintain copy at project site during submittals, planning, and progress of the specific work, until
Substantial Completion.
E. Should specified reference standards conflict with Contract Documents, request clarification from
Contracting Officer before proceeding.
F. Neither the contractual relationships, duties, or responsibilities of the parties in Contract nor those of
Contracting Officer shall be altered from Contract Documents by mention or inference otherwise in any reference document.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 CONTROL OF INSTALLATION
A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce work of specified quality.
B. Comply with manufacturers' instructions, including each step in sequence.
C. Should manufacturers' instructions conflict with Contract Documents, request clarification from
Contracting Officer before proceeding.
D. Comply with specified standards as minimum quality for the work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.
E. Have work performed by persons qualified to produce required and specified quality.
F. Verify that field measurements are as indicated on shop drawings or as instructed by the manufacturer.
G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, and disfigurement.
3.02 TOLERANCES
A. Monitor fabrication and installation tolerance control of products to produce acceptable Work. Do not permit tolerances to accumulate.
B. Comply with manufacturers' tolerances. Should manufacturers' tolerances conflict with Contract Documents, request clarification from Contracting Officer before proceeding.
C. Adjust products to appropriate dimensions; position before securing products in place.
3.03 TESTING AND INSPECTION
A. See individual specification sections for testing and inspection required.
B. Re-testing required because of non-compliance with specified requirements shall be performed by the same agency on instructions by Contracting Officer.
04-30-2020 Quality Requirements 01 4000 3 of 3
C. Re-testing required because of non-compliance with specified requirements shall be paid for by Contractor.
3.04 DEFECT ASSESSMENT
A. Replace Work or portions of the Work not complying with specified requirements.
04-30-2020 Temporary Facilities and Controls 01 5000 1 of 1
SECTION 01 5000
TEMPORARY FACILITIES AND CONTROLS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Temporary sanitary facilities.
B. Waste removal facilities and services.
1.02 TEMPORARY SANITARY FACILITIES
A. Provide and maintain required facilities and enclosures. Provide at time of project mobilization.
B. Maintain daily in clean and sanitary condition.
1.03 WASTE REMOVAL
A. Provide waste removal facilities and services as required to maintain the site in clean and orderly condition.
B. Provide containers with lids. Remove trash from site periodically.
1.04 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS
A. Remove temporary utilities, equipment, facilities, materials.
B. Clean and repair damage caused by installation or use of temporary work.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
04-30-2020 Vehicular Access and Parking 01 5500 1 of 1
SECTION 01 5500
VEHICULAR ACCESS AND PARKING
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Access roads.
B. Parking.
C. Construction parking controls.
D. Haul routes.
E. Removal, repair.
PART 2 PRODUCTS
2.01 SIGNS, SIGNALS, AND DEVICES
A. All signs, signals, and devices shall conform with the current version of Manual on Uniform Traffic Control Devices (MUTCD)
PART 3 EXECUTION
3.01 ACCESS ROADS
A. Use of designated existing roads for construction traffic is permitted.
B. Middle Two Calf Road shall remain closed to the public until construction is complete.
3.02 PARKING
A. Locate in staging areas as indicated on plans.
3.03 CONSTRUCTION PARKING CONTROL
A. Control vehicular parking to prevent interference with public traffic and parking, access by emergency vehicles, and BLM's operations.
3.04 HAUL ROUTES
A. Confine construction traffic to designated haul routes and new roads. Maintain a traffic pattern of all equipment to evenly compact fill.
3.05 REMOVAL, REPAIR
A. Repair damage caused by installation.
04-30-2020 Temporary Erosion and Sediment
Control 01 5713 1 of 4
SECTION 01 5713
TEMPORARY EROSION AND SEDIMENT CONTROL
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Prevention of erosion due to construction activities.
B. Permits-Stormwater Pollution Prevention Plan (SWPPP), Notice of Intent (NOI) C. Prevention of sedimentation of waterways, open drainage ways, and state waters due to construction activities.
D. Restoration of areas eroded due to insufficient preventive measures.
E. Performance bond.
F. Compensation of BLM for fines levied by authorities having jurisdiction due to non-compliance by
Contractor.
1.02 PERFORMANCE REQUIREMENTS
A. Comply with all requirements of BLM for erosion and sedimentation control as specified.
B. Develop and follow a Storm Water Polution Prevention Plan (SWPPP) and submit periodic inspection reports.
C. Do not begin clearing, grading, or other work involving disturbance of ground surface cover until applicable permits have been obtained; furnish all documentation required to obtain applicable permits.
D. Provide to BLM a Performance Bond covering erosion and sedimentation preventive measures only, in an amount equal to 100 percent of the cost of erosion and sedimentation control work.
E. Timing: Put preventive measures in place as soon as possible after disturbance of surface cover and before precipitation occurs.
F. Storm Water Runoff: Control increased storm water runoff due to disturbance of surface cover due to construction activities for this project.
1. Prevent runoff of sediment into state waters, including open drainage channels.
2. Anticipate runoff volume due to the most extreme short term and 24-hour rainfall events that might occur in 25 years.
G. Erosion On Site: Minimize wind, water, and vehicular erosion of soil on project site due to construction activities for this project.
1. Control movement of sediment and soil from temporary stockpiles of soil.
2. Prevent development of ruts due to equipment and vehicular traffic.
3. If erosion occurs due to non-compliance with these requirements, restore eroded areas at no cost to BLM.
H. Erosion Off Site: Prevent erosion of soil and deposition of sediment on other properties caused by water leaving the project site due to construction activities for this project.
1. Prevent windblown soil from leaving the project site.
2. Prevent tracking of mud onto public roads outside site.
3. Prevent mud and sediment from flowing off site.
4. If erosion occurs due to non-compliance with these requirements, restore eroded areas at no cost to BLM.
I. Sedimentation of Waterways On Site: Prevent sedimentation of waterways on the project site, including rivers, streams, lakes, ponds, open drainage ways, storm sewers, and sanitary sewers.
1. If sedimentation occurs, install or correct preventive measures immediately at no cost to BLM;
remove deposited sediments; comply with requirements of authorities having jurisdiction.
Temporary Erosion and Sediment
Control 01 5713 2 of 4
J. Sedimentation of Waterways Off Site: Prevent sedimentation of waterways off the project site, including rivers, streams, lakes, ponds, open drainage ways, storm sewers, and sanitary sewers.
1. If sedimentation occurs, install or correct preventive measures immediately at no cost to BLM;
remove deposited sediments; comply with requirements of authorities having jurisdiction.
K. Open Water: Prevent standing water that could become stagnant.
L. Maintenance: Maintain temporary preventive measures until permanent measures have been established.
1.03 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements, for submittal procedures.
B. Erosion and Sedimentation Control Plan:
1. Submit within 2 weeks after Notice to Proceed.
2. Include:
a. Site plan identifying soils and vegetation, existing erosion problems, and areas vulnerable to erosion due to topography, soils, vegetation, or drainage.
b. Site plan showing grading; new improvements; temporary roads, traffic accesses, and other temporary construction; and proposed preventive measures.
c. Where extensive areas of soil will be disturbed, include storm water flow and volume calculations, soil loss predictions, and proposed preventive measures.
d. Schedule of temporary preventive measures, in relation to ground disturbing activities.
e. Other information required by law.
f. Format required by law is acceptable, provided any additional information specified is also included.
3. Obtain the approval of the Plan by authorities having jurisdiction.
4. Obtain the approval of the Plan by BLM.
C. Certificate: Mill certificate for silt fence fabric attesting that fabric and factory seams comply with specified requirements, signed by legally authorized official of manufacturer; indicate actual minimum average roll values; identify fabric by roll identification numbers.
D. Inspection Reports: Submit report of each inspection; identify each preventive measure, indicate condition, and specify maintenance or repair required and accomplished.
E. Provide temporary grass seed properties and weed-free certification.
F. Maintenance Instructions: Provide instructions covering inspection and maintenance for temporary measures that must remain after Substantial Completion.
PART 2 PRODUCTS
2.01 MATERIALS
A. Mulch: Use one of the following:
1. Straw or hay.
2. Erosion control matting or netting.
B. Grass Seed For Temporary Cover: Select a species appropriate to climate, planting season, and intended purpose. Area will later be planted with permanent vegetation, do not use species known to be excessively competitive or prone to volunteer in subsequent seasons.
C. Bales: Air dry, rectangular straw bales.
1. Cross Section: 14 by 18 inches ( 350 by 450 mm ), minimum.
2. Bindings: Wire or string, around long dimension.
D. Straw Wattles
1. Nominal Diameter: 12 inches, minimum
E. Bale and Wattle Stakes: One of the following, minimum 3 feet ( 1 m ) long:
Temporary Erosion and Sediment
Control 01 5713 3 of 4
1. Steel U- or T-section, with minimum mass of 1.33 pound per linear foot ( 1.98 kg per linear m ).
2. Wood, 2 by 2 inches ( 50 by 50 mm ) in cross section.
F. Silt Fence Fabric: Polypropylene geotextile resistant to common soil chemicals, mildew, and insects;
non-biodegradable; in longest lengths possible; fabric including seams with the following minimum average roll lengths:
1. Average Opening Size: 80 U.S. Std. Sieve ( 0.18 mm ) , maximum, when tested in accordance with
ASTM D4751.
G. Riprap: See Section 31 3700.
PART 3 EXECUTION
3.01 EXAMINATION
A. Examine site and identify existing features that contribute to erosion resistance; maintain such existing features to greatest extent possible.
3.02 PREPARATION
A. Schedule work so that soil surfaces are left exposed for the minimum amount of time.
3.03 SCOPE OF PREVENTIVE MEASURES
A. In all cases, if permanent erosion resistant measures have been installed temporary preventive measures are not required.
B. Linear Sediment Barriers: Made of silt fences, straw bales or wattles .
1. Provide linear sediment barriers:
a. Along downhill perimeter edge of disturbed areas, including soil stockpiles.
b. Along the top of the slope or top bank of drainage channels and swales that traverse disturbed areas.
c. Along the toe of cut slopes and fill slopes.
2. Space sediment barriers with the following maximum slope length upslope from barrier:
a. Slope of Less Than 2 Percent: 100 feet ( 30 m )..
b. Slope Between 2 and 5 Percent: 75 feet ( 23 m ).
c. Slope Between 5 and 10 Percent: 50 feet ( 15 m ).
d. Slope Between 10 and 20 Percent: 25 feet ( 7.5 m ).
e. Slope Over 20 Percent: 15 feet ( 4.5 m ).
C. Soil Stockpiles: Surround with silt fences, straw waddles, or straw bales to prevent sediment runoff.
D. Mulching: Use only for areas that may be subjected to erosion for less than 6 months.
E. Temporary Seeding: Use where temporary vegetated cover is required.
3.04 INSTALLATION
A. Silt Fences:
1. Store and handle fabric in accordance with ASTM D4873.
2. Install with top of fabric at nominal height and embedment as specified.
3. Do not splice fabric width; minimize splices in fabric length; splice at post only, overlapping at least 18 inches ( 460 mm ), with extra post.
4. Wherever runoff will flow around end of barrier or over the top, provide temporary splash pad or other outlet protection; at such outlets in the run of the barrier, make barrier not more than 12 inches ( 300 mm ) high with post spacing not more than 4 feet ( 1220 mm ).
B. Straw Bale Rows:
1. Install bales in continuous rows with ends butting tightly, with one bale at each end of row turned uphill.
2. Install bales so that bindings are not in contact with the ground.
3. Embed bales at least 4 inches ( 100 mm ) in the ground.
Temporary Erosion and Sediment
Control 01 5713 4 of 4
4. Anchor bales with at least two steel posts per bale, driven at least 18 inches ( 450 mm ) into the ground; drive first stake in each bale toward the previously placed bale to force bales together.
5. Fill gaps between ends of bales with loose straw wedged tightly.
6. Place soil excavated for trench against bales on the upslope side of the row, compacted.
C. Straw Wattles
1. Install wattles in continuous rolls within a 2 inch deep trench.
2. Anchor bales with stakes driven a minimum of 24 inches into the ground, with less than two inches projecting above the top of the wattle.
3. A stake shall be placed within two feet of the end of the wattle and no greatern than 4 feet on center.
D. Temporary Seeding:
1. When hydraulic seeder is used, seedbed preparation is not required.
2. When surface soil has been sealed by rainfall or consists of smooth undisturbed cut slopes, and conventional or manual seeding is to be used, prepare seedbed by scarifying sufficiently to allow seed to lodge and germinate.
3. Apply seed uniformly; if using drill or cultipacker seeders place seed 1/2 to 1 inch ( 12 to 25 mm ) deep.
3.05 MAINTENANCE
A. Inspect preventive measures weekly, within 24 hours after the end of any storm that produces 0.5 inches ( 13 mm ) or more rainfall at the project site, and daily during prolonged rainfall.
B. Repair deficiencies immediately.
C. Silt Fences:
1. Promptly replace fabric that deteriorates unless need for fence has passed.
2. Remove silt deposits that exceed one-third of the height of the fence.
3. Repair fences that are undercut by runoff or otherwise damaged, whether by runoff or other causes.
D. Straw Bale Rows and Wattles:
1. Promptly replace bales and wattles that fall apart or otherwise deteriorate unless need has passed.
2. Remove silt deposits that exceed one-half of the height of the bales or wattles.
3. Repair bale or wattle rows that are undercut by runoff or otherwise damaged, whether by runoff or other causes.
3.06 CLEAN UP
A. Remove temporary measures after permanent measures have been installed, unless permitted to remain by Contracting Officer.
B. Clean out temporary sediment control structures that are to remain as permanent measures.
C. Where removal of temporary measures would leave exposed soil, shape surface to an acceptable grade and finish to match adjacent ground surfaces.
Execution and Closeout Requirements
01 7000 1 of 2
SECTION 01 7000
EXECUTION AND CLOSEOUT REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Examination, preparation, and general installation procedures.
B. Surveying for laying out the work.
C. Cleaning and protection.
D. Demonstration and instruction of BLM personnel.
E. Closeout procedures, including Contractor's Correction Punch List, except payment procedures.
1.02 REFERENCE STANDARDS
1.03 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements, for submittal procedures.
1.04 QUALIFICATIONS
A. For surveying and construction staking work, employ a land surveyor registered in the State in which the Project is located and/or an indiviudal with demonstrated experience acceptable to the BLM.
Submit evidence of surveyor's experience in the form of a resume to BLM. Employ only individual(s) trained and experienced in collecting and recording accurate data relevant to ongoing construction activities.
1.05 COORDINATION
A. Coordinate scheduling, submittals, and work of the various sections of the Project Manual to ensure efficient and orderly sequence of installation of interdependent construction elements, with provisions for accommodating items installed later.
B. After BLM occupancy of premises, coordinate access to site for correction of defective work and work not in accordance with Contract Documents, to minimize disruption of BLM's activities.
PART 2 PRODUCTS-NOT USED
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent work. Start of work means acceptance of existing conditions.
B. Verify that existing substrate is capable of structural support or attachment of new work being applied or attached.
C. Examine and verify specific conditions described in individual specification sections.
D. Take field measurements before confirming product orders or beginning fabrication, to minimize waste due to over-ordering or misfabrication.
3.02 PREINSTALLATION MEETINGS
A. When required in individual specification sections, convene a preinstallation meeting at the site prior to commencing work of the section.
B. Require attendance of parties directly affecting, or affected by, work of the specific section.
C. Notify Contracting Officer four days in advance of meeting date.
D. Prepare agenda and preside at meeting:
1. Review conditions of examination, preparation and installation procedures.
2. Review coordination with related work.
E. Record minutes and distribute copies within two days after meeting to participants, with two copies to Contracting Officer, BLM, participants, and those affected by decisions made.
3.03 LAYING OUT THE WORK
A. Verify locations of survey control points prior to starting work.
Execution and Closeout Requirements
01 7000 2 of 2
B. Promptly notify Contracting Officer of any discrepancies discovered.
C. Protect survey control points prior to starting site work; preserve permanent reference points during construction.
D. Promptly report to Contracting Officer the loss or destruction of any reference point or relocation required because of changes in grades or other reasons.
E. Replace dislocated survey control points based on original survey control. Make no changes without prior written notice to Contracting Officer.
F. Utilize recognized engineering survey practices.
G. Government will be responsible for construction staking unless otherwise noted.
3.04 GENERAL INSTALLATION REQUIREMENTS
A. Install products as specified in individual sections, in accordance with manufacturer's instructions and recommendations, and so as to avoid waste due to necessity for replacement.
B. Make vertical elements plumb and horizontal elements level, unless otherwise indicated.
C. Install equipment and fittings plumb and level, neatly aligned with adjacent vertical and horizontal lines, unless otherwise indicated.
D. Make consistent texture on surfaces, with seamless transitions, unless otherwise indicated.
E. Make neat transitions between different surfaces, maintaining texture and appearance.
3.05 PROTECTION OF INSTALLED WORK
A. Protect installed work from damage by construction operations.
B. Provide special protection where specified in individual specification sections.
C. Provide temporary and removable protection for installed products. Control activity in immediate work area to prevent damage.
3.06 ADJUSTING
A. Adjust operating products and equipment to ensure smooth and unhindered operation.
3.07 CLOSEOUT PROCEDURES
A. Make submittals that are required by governing or other authorities.
B. Accompany Project Coordinator on preliminary inspection to determine items to be listed for completion or correction in the Contractor's Correction Punch List for Contractor's Notice of Substantial Completion.
C. Notify Contracting Officer when work is considered ready for Contracting Officer's Substantial Completion inspection.
D. Submit written certification containing Contractor's Correction Punch List, that Contract Documents have been reviewed, work has been inspected, and that work is complete in accordance with Contract Documents and ready for Contracting Officer's Substantial Completion inspection.
E. Conduct Substantial Completion inspection and create Final Correction Punch List containing Contracting Officer's and Contractor's comprehensive list of items identified to be completed or corrected and submit to Contracting Officer.
F. Correct items of work listed in Final Correction Punch List and comply with requirements for access to BLM-occupied areas.
G. Notify Contracting Officer when work is considered finally complete and ready for Contracting Officer's Substantial Completion final inspection.
H. Complete items of work determined by Contracting Officer listed in executed Certificate of Substantial Completion.
04-30-2020 Site Clearing 31 1000 1 of 1
SECTION 31 1000
SITE CLEARING
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Clearing and protection of vegetation.
B. Removal of existing debris.
PART 2 PRODUCTS
2.01 MATERIALS
A. Fill Material: As specified in Section 31 2200 - Grading
PART 3 EXECUTION
3.01 SITE CLEARING
A. Comply with other requirements specified in Section 01 7000.
B. Minimize production of dust due to clearing operations; do not use water if that will result in ice, flooding, sedimentation of public waterways or storm sewers, or other pollution.
3.02 EXISTING UTILITIES AND BUILT ELEMENTS
A. Coordinate work with utility companies; notify before starting work and comply with their requirements; obtain required permits.
B. Protect existing utilities to remain from damage.
C. Do not disrupt public utilities without permit from authority having jurisdiction.
D. Protect existing structures and other elements that are not to be removed.
3.03 VEGETATION
A. Do not remove or damage vegetation beyond the limits indicated on drawings.
B. Vegetation Removed: Do not burn, bury, landfill, or leave on site, except as indicated.
1. Conserve and deposit on distubed areas after seeding, or deposit to location directed by Contract Officer.
C. Restoration: If vegetation outside removal limits or within specified protective fences is damaged or destroyed due to subsequent construction operations, replace at no cost to BLM.
3.04 DEBRIS
A. Remove debris, junk, and trash from site.
B. Leave site in clean condition, ready for subsequent work.
C. Clean up spillage and wind-blown debris from public and private lands.
04-30-2020 Grading 31 2200 1 of 2
SECTION 31 2200
GRADING
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Removal of topsoil.
B. Rough grading the site for roads and low water crossings .
C. Finish grading.
PART 2 PRODUCTS
2.01 MATERIALS
A. Topsoil-Topsoil on site is assumed to be top 6 inches or to the greatest depth consisting or organic matter or roots; whichever is greater.
B. Other Fill Materials: See Section 31 2323.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that survey bench mark and intended elevations for the Work are as indicated.
B. Verify the absence of standing or ponding water.
3.02 PREPARATION
A. Identify required lines, levels, contours, and datum.
B. Stake and flag locations of known utilities.
C. Locate, identify, and protect from damage above- and below-grade utilities to remain.
D. Notify utility company to remove and relocate utilities.
E. Provide temporary means and methods to remove all standing or ponding water from areas prior to grading.
F. Protect site features to remain, including but not limited to bench marks, survey control points, existing structures and archaeological sites , from damage by grading equipment and vehicular traffic.
3.03 ROUGH GRADING
A. Remove topsoil from areas to be further excavated, re-landscaped, or re-graded, without mixing with foreign materials.
B. Do not remove topsoil when wet.
C. Remove subsoil from areas to be further excavated, re-landscaped, or re-graded.
D. Do not remove wet subsoil , unless it is subsequently processed to obtain optimum moisture content .
E. When excavating through roots, perform work by hand and cut roots with sharp axe.
F. See Section 31 2323 for filling procedures.
G. Stability: Replace damaged or displaced subsoil to same requirements as for specified fill.
H. Remove and replace soils deemed unsuitable by classification and which are excessively moist due to lack surface water control.
3.04 SOIL REMOVAL
A. Stockpile excavated topsoil on site.
B. Stockpile excavated subsoil on site if cannot be placed in fill areas.
C. Stockpiles: Use areas designated on site; pile depth not to exceed 8 feet ( 2.5 m ); protect from erosion.
3.05 FINISH GRADING
A. Before Finish Grading:
1. Verify subgrade has been contoured and compacted.
B. Remove soil contaminated with petroleum products.
C. Where topsoil is to be placed, scarify surface to depth of 3 inches ( 75 mm ).
04-30-2020 Grading 31 2200 2 of 2
D. In areas where vehicles or equipment have compacted soil, scarify surface to depth of 3 inches ( 75 mm
E. Place topsoil in disturbed areas above high water line.
F. Place topsoil where required to level finish grade.
G. Place topsoil to thickness evenly throughout the project .
H. Place topsoil during dry weather.
3.06 REPAIR AND RESTORATION
A. Existing Facilities, Utilities, and Site Features to Remain: If damaged due to this work, repair or replace to original condition.
B. Trees to Remain: If damaged due to this work, trim broken branches and repair bark wounds; if root damage has occurred, obtain instructions from Contracting Officer as to remedy.
3.07 FIELD QUALITY CONTROL
A. See Section 31 2323 for compaction requirements.
04-30-2020 Excavation 31 2316 1 of 2
SECTION 31 2316
EXCAVATION
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Excavating for road construction and low water crossings.
B. Temporary excavation support and protection systems.
PART 2 PRODUCTS
2.01 MATERIALS
A. Bedding and Fill to Correct Over-Excavation:
1. See Section 31 2323 for bedding and corrective fill materials at general excavations.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify that survey bench mark and intended elevations for the work are as indicated.
3.02 PREPARATION
A. Identify required lines, levels, contours, and datum locations.
B. See Section 31 2200 for topsoil removal.
C. Locate, identify, and protect utilities that remain and protect from damage.
D. Protect bench marks, survey control points, existing structures, fences, sidewalks, paving and curbs from excavating equipment and vehicular traffic.
E. Protect rock outcroppings and other features to remain.
F. Grade top perimeter of excavation to prevent surface water from draining into excavation. Provide temporary means and methods, as required, to maintain surface water diversion until no longer needed, or as directed by Contract Officer.
3.03 TEMPORARY EXCAVATION SUPPORT AND PROTECTION
A. Excavation Safety: Comply with OSHA’s Excavation Standard, 29 CFR 1926, Subpart P.
3.04 EXCAVATING
A. Excavate to accommodate new structures and construction operations.
B. Notify Contracting Officer of unexpected subsurface conditions and discontinue affected Work in area until notified to resume work.
C. Provide temporary means and methods, as required, to remove all water from excavations until directed by Contracting Officer. Remove and condition soils which are excessively moist due to lack of dewatering or surface water control.
3.05 SUBGRADE PREPARATION
A. See Section 31 2323 for subgrade preparation at general excavations.
3.06 FILLING AND BACKFILLING
A. Do not fill or backfill until all debris, water, unsatisfactory soil materials, obstructions, and deleterious materials have been removed from excavation.
B. See Section 31 2323 for fill, backfill, and compaction requirements at general excavations.
C. See Section 31 2200 for rough and final grading and topsoil replacement requirements.
3.07 CLEANING
A. Stockpile excavated material to be re-used in area designated on site in accordance with Section 31
2200.
3.08 PROTECTION
A. Divert surface flow from rains or water discharges from the excavation.
B. Prevent displacement of banks and keep loose soil from falling into excavation; maintain soil stability.
04-30-2020 Excavation 31 2316 2 of 2
C. Protect open excavations from rainfall, runoff, freezing groundwater, or excessive drying so as to maintain foundation subgrade in satisfactory, undisturbed condition.
D. Keep excavations free of standing water and completely free of water during concrete placement.
04-30-2020 Trenching 31 2316.13 1 of 2
SECTION 31 2316.13
TRENCHING
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Backfilling and compacting for culverts.
1.02 SUBMITTALS
A. See Section 01 3000 - Administrative Requirements, for submittal procedures.
B. Fill Composition Test Reports: Results of laboratory tests on proposed and actual materials used.
C. Compaction Density Test Reports.
PART 2 PRODUCTS
2.01 FILL MATERIALS
A. Type 1 Pipe Bedding - Gravel: Angular crushed washed stone; free of shale, clay, friable material and debris, per plans.
1. Graded in accordance with ASTM C136/C136M, within the following limits:
a. 3/4 inch ( 19 mm ) sieve: 100 percent…