This document is a Site Inspection Tour / Prebid Conference Record for the Cedar Butte Eastside Well project by the United States Department of the Interior Bureau of Land Management. The solicitation number is 140L2625Q0050, with a site inspection conducted on August 5, 2025, at 10:00am by Christopher Stine. Attendees included John Bishop and Chase Bishop from Bishop Well Drilling.

Key details from the site inspection include specifications for the well drilling project: a 50ft x 50ft parking pad for the drill truck, a required 24-hour pump test, and clarification on materials (bentonite can be used instead of concrete, and no plate is to be placed at the bottom of the well). The specification references include 02525-3.1-A for the parking pad, 02525-3.3-D regarding well capping, and 02525-2.3-A-2 for material use. The site inspection was completed and verified by the engineer Christopher Stine on the same date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form 1510-56 (December 1985)

UNITED STATES

DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

SITE INSPECTION TOUR / PREBID CONFERENCE RECORD

1. Solicitation Number:140L2625Q0050 4. Meeting Place: At the site.

2. Title: Cedar Butte Eastside Well 5. Conducted by: Christopher Stine

3. Date and Time: 10:00am 5 Aug.2025

Attended by:

Name and Firm Address (include zip code) Phone (include area code)

John Bishop - Bishop Well Drilling 1060E 3500N Buhl ID 208-308-1982

Chase Bishop 208-308-1982

8. Questions asked and responses given:

Q: The size of the parking pad for the drill truck.

A: 50ft x 50ft. Refer to the spec. 02525-3.1-A

Q: How long does the pump test have to be.

A: 24 hr

Q: Do you want the plate to put at the bottom of the well?

A: No, remove 02525-3.3-D that talks about capping the bottom of the well.

Q: Can we use Bentonite?

A: Looking at 02525-2.3-A-2 you can use bentonite instead of concrete.

9. Was a complete site inspection tour made? _x_yes ____no (If “No”, explain) _____________________________________________

By (Name) Christopher Stine

Title Engineer

Date 08/05/2025