This is Standard Form 30, Amendment 2 to Solicitation 140L1726R0005, issued by the Colorado State Office of the Bureau of Land Management (BLM).

The solicitation is for a turnkey solar-powered well water system for the BLM-CO TRFO Basin project located near Naturita, Colorado (38.06529167° N, -108.63154723° W). The contractor shall design and install a solar pumping system at an existing water well, provide water to an elevated buried storage tank for gravity-fed distribution to a wildlife drinking tank, and include provisions for a future stockwater tank upgrade. The system must be freeze-proof and operational year-round to a frost-free hydrant. This is a Total Small Business Set-Aside for NAICS 237110 (Water and Sewer Line and Related Structures Construction) with a $45 threshold. The contract is Firm Fixed Price, with award based on Best Value. Work must be completed within 360 days of the Notice to Proceed, Monday through Friday, excluding federal holidays. Contract time may be paused for snow or snowmelt conditions. Amendment 2 extends the bid due date from September 9, 2026 at 12:00 PM to September 17, 2026 at 8:00 AM MD, with final questions due by September 14, 2026 at 8:00 AM MD. The period of performance is October 1, 2026 through September 26, 2027. Davis Bacon Act wages apply to Montrose County, Colorado. Bid, Performance, and Payment Bonding may be required. Invoicing and payment processing occurs through www.ipp.gov with 14-day prompt pay and progress payments. The primary contracting specialist is Courtni Strickland (cstrickland@ios.doi.gov).

View the file

Other files for this federal contract opportunity

Other files attached to BLM-CO TRFO BASIN WELL AND WATER SYSTEM, newest first.
File Type Posted
Sol_140L1726R0005_Amd_0003.pdf PDF
B11_Q_A_1_140L1726R0005_0003.pdf PDF
Q_A_140L1726R0005_0002.pdf PDF
Sol_140L1726R0005_Amd_0001.pdf PDF
B08_UPDATED_140L1726R0005__TERMS_AND_CONDITIONS_v_08_27_2026_0001.pdf PDF
B03_WD__CO20260003.pdf PDF
A04_BID_SCHEDULE_BASIN_WELL_IMP.pdf PDF
Sol_140L1726R0005.pdf PDF
A05_PWS_BASIN_WELL_IMP.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

Chau Nguyen

See continuation page

COLORADO STATE OFF

Denver Federal Center Building 40 Lakewood CO 80225

LRA

140L1726R0005

09/02/2026

08/19/2026

1 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140L1726R0005/0002

BLM-CO TRFO BASIN WELL AND WATER SYSTEM

IMPROVEMENTS

AMENDMENT 2 (09/01/2026)- This amendment is to extend the due date to 09/17/2026 8am MD, final questions due 08/14/2026 8am MD, add Q&A, and update evaluation information in terms and conditions. There will not be a formal site visit. Unaccompanied site visits are available.

Please utilize the coordinates in the PWS to properly locate the site.

This solicitation is being amended to reopened to change the set aside to 100% Total Small

Business due to original set-aside resulting in no responses, post it to open market (SAM.gov), update terms and conditions, and adding attachments.

All questions are due by September 14, 2026 8am

MD.

1.1 PROJECT DESCRIPTION

Contractor shall provide a turnkey solar powered, well water system that automatically provides and maintains water to a wildlife drinking tank with minimal human input except winterization and annual maintenance. System shall be designed to have a solar pumping system at an existing water well. Provide water to an elevated buried storage tank. The buried storage tank will gravity feed the drinking tank. An additional tee and valve shall be provided for a future upgrade for a stockwater tank. System shall be designed to be freeze proof and operational in the winter to the frost free hydrant at the drinking tank.

1.2 LOCATION

Latitude: 38.06529167° N

Longitude: -108.63154723° W

From Naturita, CO. Travel south on CO-141 for approximately 12 miles. Turn right (west) on

Continued...

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

County Road U29. Travel approximately 5 miles.

The project is on the left (south).

1.3 WORK SCHEDULE

Work shall be completed within 360 days of the

Notice to Proceed. Contractor shall complete all work within 360 days of starting work. Work is not allowed on Federal holidays. Work shall occur Monday through Friday. Contract time will be paused, upon request, when snow or snowmelt prevents work at the project site.

Period of Performance: Work shall be completed within 360 days of the Notice to Proceed.

Basic Contracting Requirements:

1. Active Registration - www.sam.gov - check it now please. Free assistance is available at your local APEX Accelerators -https://www.apexaccelerators.us/#/

2. Invoicing and Payment - www.ipp.gov - 14 day prompt pay with progress payments

3. FAR Part 12 - Acquisition of Commercial

Products and Commercial Services

4. FAR Part 36 - Construction Provisions and

Clauses

5. Davis Bacon Act Wages for Montrose County, CO

6. Total Small Business Set-Aside for NAICS

237110 -Water and Sewer Line and Related

Structures Construction $45

7. Bid, Performance and Payment Bonding maybe required

8. Type of Contract - Firm Fixed Price

9. Basis of Award -Best Value

Primary POC: Contracting Specialist Courtni

Strickland cstrickland@ios.doi.gov

LIST OF CHANGES:

Bids due date : 09-SEP-26 changed to

17-SEP-26

Solicitation due time : 12:00 PM changed to

08:00 AM

Date distributed : 28-AUG-26 changed to

02-SEP-26

Continued...

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

Period of Performance: 10/01/2026 to

09/26/2027

REMINDER: All invoices must be submitted directly to www.ipp.gov and include a matching itemized attachment.

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet
Reference Number
Name of Offeror or Contractor
OPTIONAL FORM 336 (4-86))

Sponsored by GSA FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .