This is a Performance Work Statement (PWS) for corral cleaning services at the Ridgecrest Regional Wild Horse and Burro Facility in Ridgecrest, California. The contract period runs from November 15, 2026, through January 16, 2027, requiring the contractor to clean approximately 46 acres of pens and alleyways at the 55-acre facility. The contractor must remove excess manure and wind-blown material by scraping down to mineral soil from pens, alleyways, fencelines, feeders, perimeter roads, and areas within 8 feet of all fencelines, then haul the material to a designated disposal site on the facility's east side without changing ground contours through over-excavation.

The contractor must furnish all personnel, equipment, materials, and supervision necessary to perform the work, with the government providing only water for truck applications, pen layout diagrams, animal movement instructions, and panel removal guidance. Work shall be conducted during daylight hours on facility business days (Monday through Friday, excluding federal holidays), with equipment breakdowns requiring repair or replacement within seven calendar days. The contractor assumes liability for damage to government property and hazardous material spills from equipment and must coordinate with the Facility Manager at least one business day before requiring animals to be moved. Quality assurance inspections will be conducted on completed pens, with consequences ranging from documentation of deficiencies for one unsatisfactory inspection to 5 percent invoice deductions for two unsatisfactory inspections and 10 percent deductions for three unsatisfactory inspections.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS)

PWS Page 1

PROJECT TITLE: Corral Cleaning Services for Ridgecrest Wild Horse and Burro Corrals

Contents PWS 1.0 Background on the Government’s Requirement PWS 2.0 General Scope of Work

PWS 3.0 Overall Objective(s)

PWS 4.0 Specific Tasks PWS 5.0 Delivery / Performance Schedule PWS 6.0 Government-Furnished Property, Materials, Services PWS 7.0 Security and Administrative Matters

PWS 8.0 Technical Exhibits and Definitions

EXHIBIT X: QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

PWS Page 2

PWS 1.0 Background on the Government’s Requirement

The Ridgecrest Regional Wild Horse and Burro Corral Facility is a 55-acre facility, with approximately 46 acres of pens and alleyways. 16 of the pens are from approximately

1.5 acres to 4.2 acres in size. 31 of the pens and alleyways are less than 1 acre in size, with 25 of them being under .25 acres.

PWS 2.0 General Scope of Work

The Bureau of Land management (BLM) Ridgecrest Regional Wild Horse and Burro Facility has a need for a cleaning Contractor to clear its pens and alleyways of manure and loose material.

The Contractor shall remove the manure and wind-blown material from the pens, fencelines, perimeter roads, and alleyways.

This will consist of scraping down to the mineral soil to remove the excess material, loading and hauling the material to the designated site on the east side of the facility.

Place of Performance:

The work will be accomplished at the Ridgecrest Regional Wild Horse and Burro Corrals located at:

3647-A Randsburg Wash Road Ridgecrest, Ca 93555

Period of Performance:

The period of performance shall be 11/15/2026 – 1/16/2027

PWS 3.0 Overall Objective(s)

The objective of this work is to clean the excess material from the facilities in order to provide a cleaner, safer working environment for both the Ridgecrest Wild Horse and Burro staff/Contractors, and the animals in the facility.

PWS Page 3

PWS 4.0 Specific Tasks

Task 1: The Contractor shall utilize their supplied equipment to remove the excess manure and wind-blown material, cleaning to the hard mineral soil, from the following locations:

• Pens

• Alleyways

• Beneath fencelines and feeders

• Perimeter roads

• Within 8’ radius of all fencelines

This shall be done in a manner that does not change the ground contour by over-excavation of the soil.

Task 2: While cleaning, The Contractor shall furnish Laborer support for the equipment operator. This laborer is necessary to adequately clean and remove manure in tight quarters where the mechanized equipment cannot access. This access may include temporarily moving corral panels to access pens or along fencelines and alleyways. Once cleaned, the Contractor will replace all panels to their original location.

Task 3: The Government shall reserve the right to clean any pens at any time in the facility to prevent illness or disease. This material may be stacked in convenient, temporary piles. The Contractors removal of manure/wind-blown debris shall include any temporary piles that are generated by BLM employees.

Task 4: All material removed must be hauled to the designated site on the east side of the facility where it may be dumped and spread, while maintaining the waste pile’s function and design.

Task 5: The Contractor must coordinate with the Facility Manager to ensure that pens do not contain animals, prior to their cleaning or opening of panels/gates.

Task 6: The Contractor is responsible for damage to any government owned corrals, plumbing, feeders, and equipment. The Contractor shall notify the Facility Manager immediately in the event of damaged corrals, plumbing, feeders, or equipment.

PWS Page 4

PWS 5.0 Delivery / Performance Schedule

The Contractor shall ensure the cleaning of the entirety of the facility as listed above, within the allotted performance period.

Cleaning shall be conducted during daylight hours, on facility business days, unless otherwise coordinated with the Facility Manager.

The Contractor shall assume liability for damage to government owned corrals, feeders, and equipment.

The Contractor shall notify the Facility Manager at least 1 business day prior to needing animals moved from pen.

The Contractor shall assume liability for cleanup of all hazardous material spills from their equipment (fuel, oil, etc.).

Equipment Serviceability: In the event of equipment breakdown or non-serviceability, the Contractor agrees that any repairs shall be accomplished within seven (7) Calander days from the date of such breakdown or the Contractor must replace the unserviceable equipment subject to all the original requirements and resume operations.

Unserviceability is defined as any required equipment that is not fully functional.

Cleaning may begin immediately, facility must be cleaned, in its entirety, as described in 4.0, including any existing and temporary piles made by BLM staff.

PWS 6.0 Government-Furnished Property, Materials, Services

General:

The Contractor shall furnish all personnel, materials, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the work tasks defined in this Performance Work Statement, except for those items specified as government-furnished.

Materials:

The Government shall furnish the below materials to assist the Contractor in meeting the requirement of this contract, except for those items specified as government furnished property and services.

Equipment:

The Government shall furnish the below equipment to assist the Contractor in meeting the requirement of this contract, except for those items specified as government furnished property and services.

PWS Page 5

Services: The Government will provide a diagram of the pen layout and brief overview of how animals are moved throughout the facility. Personnel responsible for movement of animals between pens. Instruction on removal of panels. Instruction for special cleaning as needed. Additional Instruction for weekends, holidays, or non-staffed days.

Utilities: The Government will provide water for water truck applications.

The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish the work.

PWS 7.0 Security and Administrative Matters

Emergencies: In case of emergency, the Contractor shall make efforts to assuage the situation with the operator’s and animal’s safety in mind first. Operators shall carry phone numbers for BLM Corral Facility Manager and Staff.

Regular Work Hours:

The performance period established for this contract is based upon all work being conducted during daylight hours, Monday through Friday, excluding government holidays. If the Contractor desires to carry on work outside regular hours, including Saturdays, Sundays, and government holidays, a request must be submitted to the Contracting Officer in sufficient time to allow satisfactory arrangements to be made for access to the work site.

Communications:

“Time” for communications received after 3:00pm, after 12:00 pm locally on Fridays, or after 12:00 pm locally prior to a holiday will not start until the next business day. All times are local Pacific Standard Time.

Federal Holidays:

The following Federal Legal Holidays are observed:

New Year’s Day Martin Luther King, Jr. Day President’s Day Memorial Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day

Fire Danger Season:

If the Contracting Officer Representative (COR) allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR.

PWS Page 6

PWS 8.0 Technical Exhibits and Definitions

Standard Definitions:

Physical Condition The Physical appearance of Federal equipment or facilities that considers cracks, chips, dents, abrasions, rust, corrosion, general cleanliness, vibration, operating temperature, and discoloration and other items as identified by the COR..

Physical condition may be determined by visual as well as diagnostic means.

Contracting Officer (CO) The Secretary of the Interior or designated authorized representative who is the only agent capable of signing a federal award or obligating funds.

Contracting Officer’s Representative (COR) The Contracting Officer’s designated representative as indicated in a delegation of authority letter.

Quality Assurance (QA) Surveillance of Contractor performance to determine performance requirements are met.

Performance Requirements Summary (PRS) (see Technical Exhibit below) The PRS identifies the key performance indicators of the Contract that will be evaluated by the Government to assure Contract performance standards are met by the Contractor.

Quality Control Those actions taken by the Contractor to control the production of goods or services so that they meet the requirements of the performance work statement.

Technical Definitions:

Technical Exhibits:

PWS Page 7

EXHIBIT X: QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

Work Tasks to be Performed

Acceptable Quality Level Method of Surveillance Consequences, Remedies, and/or Deduction(s)

Task(s) 1-7 Cleaning of Corrals

No more than 1 unsatisfactory inspection.

The COR or another Government Representative will inspect the cleaned pens as they are deemed completed by the Contractor.

For 1 unsatisfactory inspection, the COR will document this and inform the Contractor what must be improved.

For 2 unsatisfactory inspections, a 5% deduction from the invoice for that Period of Performance.

For 3 unsatisfactory inspections, a 10% deduction.

PROJECT TITLE: Corral Cleaning Services for Ridgecrest Wild Horse and Burro Corrals
PWS 1.0 Background on the Government’s Requirement
PWS 2.0 General Scope of Work
Place of Performance:
Period of Performance:
PWS 3.0 Overall Objective(s)
PWS 4.0 Specific Tasks
PWS 5.0 Delivery / Performance Schedule
PWS 6.0 Government-Furnished Property, Materials, Services
General:
Materials:
Equipment:
PWS 7.0 Security and Administrative Matters
Regular Work Hours:
Communications:
Federal Holidays:
Fire Danger Season:
PWS 8.0 Technical Exhibits and Definitions
Standard Definitions:
Technical Definitions: Technical Exhibits:

File details come from the government source that posted it. Updated .