B09_A4_21R0020_QAs_3_0004.pdf
PDF 441 KB Posted
- Attached to
- Ft. Egbert Historical Facilities Restoration Federal contract opportunity
- Solicitation number
- 140L0621R0020
About this file
This document contains questions and answers regarding a solicitation for the Ft. Egbert Historical Facilities Restoration project. The solicitation calls for restoration work including removal of all existing exterior paint from historical buildings at Ft. Egbert. Bidders had questions about the required scope of paint removal and acceptable methods. The answers clarify that drawings require removal of all existing exterior paint and it is the contractor's responsibility to select compliant products and means to complete the work while matching existing conditions. Contractors may submit past performance reports but must follow instructions in the solicitation for submissions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L0621R0020_Amd_0004.pdf | ||
| B09_A4_21R0020_Solicitation_0004.pdf | ||
| B09_A3_140L0621R0020_Solicitation_Amend_3_0003.pdf | ||
| Sol_140L0621R0020_Amd_0003.pdf | ||
| Sol_140L0621R0020_Amd_0002.pdf | ||
| Amd2_-_Attach_6a_Continued-_Ft__Egbert_Contractor_Q_A_w_responses_0002.pdf | ||
| Attch_7_Color_Photos_0001.pdf | ||
| Sol_140L0621R0020_Amd_0001.pdf | ||
| Attch_6_Contractor_Q_and_A_0001.pdf | ||
| Attch_3_Wage_Determination.pdf | ||
| Attch_5_PP_Questionnaire.docx | DOCX document | |
| Attch_1_Specifications.pdf | ||
| Attch_2_Drawings.pdf | ||
| Sol_140L0621R0020.pdf | ||
| Attch_4_Pricing_Worksheet.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
BUREAU OF LAND MANAGEMENT
National Operations Center
Denver Federal Center, Building 50 P. O. Box 25047
Denver, CO 80225-0047
140L0621R0020 Fort Egbert Restoration
Questions and Answers #3
20) Q: The H drawings refer to ALL the existing paint being removed, however the Painting Spec for the exterior prep (H) says to “Remove dust, grit, and foreign matter” and the Removal/Disposal of Materials Containing Lead (A) says “The work may require the disturbance (including cleanup of existing loose paint.”) Neither of these two statements in these spec sections make reference to removing All existing paint. Please clarify if all existing paints are to be removed and if they are, please put in a detailed painting spec section that tells us the means & methods you will allow for these Historical Buildings.
To remove all the existing paint, the wood on all the exteriors will be disturbed by blasting techniques (sand, sponge, baking soda, walnut shells etc.) and chemical stripping of the paints from the wood will leave chemical residues that may interfere with the new paint or may not be allowed by the paint manufactures. Also, the cost of removing all the existing paint will be exponentially higher than performing a surface prep by just removing loose paint, dust, grit and foreign matter.
A: The scope of work per the drawings includes but is not limited to, “AT ALL
PAINTED EXTERIOR SURFACES REMOVE ALL EXISTING PAINT…”.
Typical surface prep instructions in the specifications for painting do not reduce the scope of work clearly stated in the drawings, nor does a statement that the work may require the cleanup of existing loose paint in any way reduce the scope of work stated in the drawings. Means and methods for paint removal, surface prep, and paint application will not be provided for the contractor. Minimum requirements for all of these tasks are provided in the bid documents, which also include as statements limiting the use of ‘Hot Work’ due to historical building considerations.
Additionally, methods for submitting substitution requests, product information, and contractor means & methods, are described where required in the specifications. It is the contractor’s responsibility to select their products, processes, means and methods to complete the scope of work and comply with the project requirements described in the bid documents, as well as the manufacturer recommendations for all processes and products used. Compatibility of processes and products selected to complete the work is the responsibility of the contractor.
21) Q: Will the government put out a detailed paint spec? These are historical buildings and usually there are requirements that the wood surfaces cannot be changed by the paint removal efforts. For all the paint to be removed, the best way is by a blasting method as the paints are below the surface plane and within the wood grains. Blasting will make a new profile of the wood surfaces. Are you going to allow blasting? If not, what removal methods will you allow? Chemical strippers or belt sanding all the paint off the surfaces?
Sanding will disturb the surfaces also and chemicals come with their own set of problems. Please advise.
A: The bid documents provided describe the scope of paint removal, the related requirements applicable for this project, and any methods not allowed such as the use of ‘Hot Work’. Any means and methods which conform with the bid documents are acceptable. It is the contractor’s responsibility per the drawings to, “REPAIR
OR REPLACE IN-KIND DAMAGED SIDING AND TRIM TO MATCH
EXISITING.” This includes existing damage observed in photos and site visits as well as any damage caused by the contractor during the project. The contractors chosen means and methods to perform the work will not excuse the requirement that the exterior finishes shall match the existing conditions once the work is complete.
22) Q: We plan on submitting CPARs reports for certain past performance references.
Should we include the CPARs reports with our proposal?
A: Yes, refer to the instructions set forth within the solicitation under L-9(d).
File details come from the government source that posted it. Updated .