Amd2_-_Attach_6a_Continued-_Ft__Egbert_Contractor_Q_A_w_responses_0002.pdf
PDF 46 KB Posted
- Attached to
- Ft. Egbert Historical Facilities Restoration Federal contract opportunity
- Solicitation number
- 140L0621R0020
About this file
This document contains questions and answers regarding solicitation number 140L0621R0020 for the Ft. Egbert Historical Facilities Restoration project managed by the Department of the Interior Bureau of Land Management National Office. The solicitation involves restoring multiple buildings at Ft. Egbert, with the intent to remove all exterior paint from included surfaces in the scope of work. Alternate paint manufacturers may be accepted as substitutions if meeting specified standards. Portable washroom facilities are confirmed to be adequate for the purposes of the project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09_A4_21R0020_QAs_3_0004.pdf | ||
| B09_A4_21R0020_Solicitation_0004.pdf | ||
| Sol_140L0621R0020_Amd_0004.pdf | ||
| Sol_140L0621R0020_Amd_0003.pdf | ||
| B09_A3_140L0621R0020_Solicitation_Amend_3_0003.pdf | ||
| Sol_140L0621R0020_Amd_0002.pdf | ||
| Attch_6_Contractor_Q_and_A_0001.pdf | ||
| Sol_140L0621R0020_Amd_0001.pdf | ||
| Attch_7_Color_Photos_0001.pdf | ||
| Attch_4_Pricing_Worksheet.xlsx | XLSX spreadsheet | |
| Sol_140L0621R0020.pdf | ||
| Attch_5_PP_Questionnaire.docx | DOCX document | |
| Attch_1_Specifications.pdf | ||
| Attch_2_Drawings.pdf | ||
| Attch_3_Wage_Determination.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140L0621R0020
Ft. Egbert Historical Facilities Restoration
Attachment 6 – Amendment #02 - Contractor Q&A Part 2
Responses to Questions 17- 19
17. Please clarify the intended extent of lead paint removal. A Sheet notes indicate that all exterior paint is to be removed. Is the intent of this contract to remove all paint from all exterior wood surfaces on all the buildings or just loose and flaking paint?
Answer: Confirmed, intent is to remove all paint from surfaces included in the scope of work described by the bid documents.
18. Will Rodda Paint be an acceptable Paint Manufacturer?
Answer: Alternate products may be accepted as substitutions if shown to meet or exceed the specified product. Substitution requests must be submitted in accordance with
Division 01 specifications.
19. Will portable washroom facilities by Adequate?
Answer: Yes.