DEMOLITION OF SIX STRUCTURES AT TLAS
Solicitation number
140G0226R0002
Issued by

About this file

This is Standard Form 30 (Amendment of Solicitation/Modification of Contract) Amendment 0006 issued by the USGS OAG Denver Acquisition Branch for solicitation 140G0226R0002, effective 03/20/2026.

The amendment provides Government responses to 14 contractor inquiries (Q1-Q14) regarding a three-property residential demolition project. Key clarifications include: (1) bidders should assume presumed asbestos in the untested tan house (Q1) and bid accordingly to residences Q2 and Q50, which have completed asbestos surveys; (2) the Government will provide asbestos survey reports for Q50 and coordinate removal of overhead electrical lines, while contractors are responsible for tree and vegetation removal; (3) the driveway at Q2 must be removed and hauled away, while driveways at Q1 and Q50 remain in place; (4) contractors may stack additional roll-off containers on site; and (5) property line maps will be provided. In response to a request for bid extension due to late issuance of Government responses and bid guarantee requirements, the bid due date has been extended to April 27, 2026. The Period of Performance runs from 06/01/2026 to 07/31/2026 under a Firm Fixed Price award type. Technical, administrative, and contracting officer points of contact are provided.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

Karen La Bouff-Kind

See continuation page

USGS OAG DENVER ACQUISITION BRANCH

PO BOX 25046

204 DENVER FEDERAL CENTER

DENVER CO 80225-0046

USGS OAG DENVER ACQUISITION BRANCH

PO BOX 25046

DENVER CO 80225-0046

GDB

GDB

140G0226R0002

03/20/2026

03/20/2026

1 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140G0226R0002/0006

The purpose of this amendment is to furnish the

Government¿s responses to contractor inquiries pertaining to the solicitation and the subject requirement (Q12 - 14).

a. Q1: Because only one of the three properties has a valid NYS asbestos survey, is it the intent to get the other two properties condemned and demolish with presumed asbestos in place?

A1: Yes. Two of the structures were tested.

The third was not tested, but since they were built at the same time we are assuming that there is presumed asbestos in the third structure. See attached Asbestos Survey

Reports.

b. Q2: If this is not the intent, when will

USGS retain a company to perform the pre demolition asbestos survey? Before or after the bid? This is a requirement of NYS Industrial

Code Rule 56 and will be a significant factor in the bidding process.

A2: Bidders should assume the residence without an asbestos survey contains asbestos and bid accordingly to the two residences with a positive asbestos report. If an asbestos survey is needed for the third residence by NYS code, bidders should consider this in their bid.

c. Q3: Is it possible to gain access to the building to assess the physical condition of the building?

A3: A site visit is scheduled for 9:00 AM

(EST), 9 April, 2026. Q4: Since a third party must perform hazardous material surveys and the asbestos surveys can't be done by the demolition contractor, will the Government provide asbestos and lead-based paint survey reports for all

3 buildings prior to the bid due date?

d. A4: Two of the three houses already have completed asbestos surveys (Q50, Q2: white

Continued...

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C) houses) and can be provided. Bids for demolition of Q1 (tan house not tested) should be prepared, assuming that similar results will be found as in residences Q2 and Q50. During demolition contractors will need to keep surfaces wet to reduce the spread of dust. (Lead-Based

Paint and Demolition | US EPA)

e. Q5: Will the Government remove trees and vegetation adjacent to the buildings prior to demolition, or should this be included in the

Contractor¿s scope of work?

A5: Removal of trees and vegetation should be included in the contractor¿s scope of work.

f. Q6: Will the Government disconnect, de-energize, and remove overhead electrical lines servicing the buildings prior to demolition, or is the contractor responsible for coordination and removal?

A6: The government will coordinate with the power supplier to remove the overhead lines servicing the buildings.

g. Q7: Does the driveway need to be removed, or can it be buried?

A7: The driveway at Q2 should be removed and hauled away. Driveways at Q1 and Q50 shall remain in place.

h. Q8: Can we deliver more roll-off containers if we stack them next to the driveway?

A8: Yes, there is plenty of space at all 3 properties for extra dumpsters.

i. Q9: Can you provide a map detailing the property line?

A9: Yes, we will provide a map detailing property lines.

j. Q10: Are the trees next to the houses to be removed?

Continued...

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

A10: Remove trees as needed to complete the demolition.

k. Q11: Can we remove the trees?

A11: Yes, you may remove trees as needed.

l. Q12: Can the government provide us with a survey for Q50? The Asbestos Survey for Q50 is not included in the Solicitation documents.

Only Q2 Asbestos Survey Report is provided.

A12: Yes

m. Q13: To provide the most accurate and competitive price to the Government, we need asbestos surveys for both the tan house and Q50 to determine asbestos quantities and avoid unnecessary contingencies in our pricing.

A13: The asbestos survey for Q50 is available. The tan house (Q1) has not been tested but bids for demolition of Q1 should be prepared, assuming similar results that were found in Q2 and Q50.

n. Q14: Given that a bid guarantee is required and the Government¿s responses to questions were issued less than 3 business days before the bid due date, can the Government extend the proposal due date?

A14: The bid date has been extended until

April 27th, 2026.

Period of Performance: 06/01/2026 to

07/31/2026

AWARD TYPE: FIRM FIXED PRICE

TECHNICAL POC: ALEX GATCH, EMAIL:

agatch@usgs.gov

ADMIN POC: RHONDA ATON, Email: raton@usgs.gov

CONTRACT SPECIALIST: PHILIP ROBINSON, Email:

probinson@usgs.gov

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet
Reference Number
Name of Offeror or Contractor
OPTIONAL FORM 336 (4-86))

Sponsored by GSA FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .