Statement of Work Summary

This Statement of Work outlines hazardous waste disposal and PFAS soil sampling services required by the US Geological Survey (USGS) Eastern Ecological Science Center at Patuxent Research Refuge in Laurel, Maryland. The contractor must provide comprehensive waste management services including analyses, fate determination, manifesting, documentation, excavation, pick-up, transportation, labeling, and disposal of hazardous and universal wastes. Additionally, the contractor must conduct PFAS testing of substrate from 16 bird pens (approximately 8 ft. x 50 ft. each) by collecting approximately 80 soil samples (5 samples per pen) to a depth of 6 inches below ground surface using a staggered grid pattern, with excavation and disposal of contaminated soil required if testing reveals above-acceptable contamination levels.

The contractor must obtain all necessary permits, licenses, and certifications for hazardous waste transport and disposal, maintain EPA, DOT, and state registries, and employ trained and certified disposal technicians knowledgeable in DOT requirements and safe handling procedures. All waste must be transported and disposed of at EPA-approved facilities approved by USGS in accordance with federal and state regulations. Key deliverables include packaging supplies, waste manifests, permits, waste characterization records, and certificates of disposal or destruction. The contractor must submit one copy of all documentation including the original manifest at the time of each pick-up for government signature, and disposal tickets detailing quantities, fees, and facility information as part of the invoicing process. Invoices must include the Purchase Order Number, item descriptions, quantities, and costs for each service. The period of performance is 84 days from the award date, and all coordinated pick-ups must occur during normal center business hours (Monday through Friday, 7:30 a.m. to 4:00 p.m.). A pre-award site visit is strongly encouraged and will be scheduled to allow contractors to observe the location.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Hazardous Waste Disposal and Soil Sample

1. Introduction. The US Geological Survey (USGS), Eastern Ecological Science Center at

Patuxent Research Refuge, 12100 Beech Forest Road, Laurel, MD has a requirement to have hazardous waste removed from the center. Services include analyses, fate determination, manifesting and documentation, excavation, pick-up, transportation, labeling, and audit trails until ultimate treatment or disposal.

2. Scope. These services include waste characterization, supplies and packaging, labeling and documentation, technical support, licenses and permits, insurance, and disposition. Items that will be collected in appropriate containers upon request. Some of the PFAS bio-waste (nesting material from the bird pens) has been collected and currently in large trash bags ready for disposal. See Exhibit A for a list of PFAS and Exhibit B for photos of the bags that need to be picked up. This site also contains 16 bird pens, each approximately 8 ft. x 50 ft., which require PFAS testing of the substrate and possible excavation and disposal based on the results of the analyses. A sampling grid and collecting approximately 5 samples per pen (80 total) to determine contamination levels. Samples will be taken from each pen. The samples will be taken to a depth of 6" Below Ground Surface (BGS). The grid will be staggered, with the first sampled being taken near the front of the pen. The next three sample will be taken to the in the middle of the pen. This process will be repeated for the remaining 16 pens. If the result of sampling shows above acceptable limits this soil must also be removed and disposed following federal and/or state guidelines as per the requirement of this contract.

3. Work Requirements.

a. Technical Requirements

1) Shipping and disposal manifests, permits, placarding requirements, as well as labeling of appropriate containers will be provided at the time of pickup to the Government.

2) Drivers and pick up technicians must be trained and certified disposal technicians, knowledgeable in packaging procedures, labeling, DOT requirements, and in safe loading, bracing, and transportation of hazardous, and universal wastes.

3) Possess and maintain all statutory required vehicular insurances, workman’s compensation insurance, general liability insurance, and premises insurances.

4) All waste removal under this agreement shall be transported and disposed of in accordance with all applicable local, state, and federal regulations.

b. Deliverables

1) Deliverables shall include all supplies such as packaging, drums, liners, approved absorbents, labels, pallets and shrink wraps.

2) Paperwork, permits, completed waste manifests, and waste characterization records.

3) Documented proof of proper disposal, such as a certificate of disposal and/or certification of destruction.

c. Performance Objectives

The contractor shall ensure that wastes packaged for disposal are in properly labeled, appropriate containers and are properly sealed. The Contractor shall package wastes in a manner acceptable to the disposal facility.

Carriers shall have required EPA, DOT, and state (where applicable) registry for hazardous and universal waste transport and verifiable records of good shipping practices, which may be checked through local DOT authorities.

Carriers shall be chosen, where possible, who do a minimum of interlining or intermediate stopping before reaching the disposal site. Carriers shall use routes of transport, which have been designated or approved by the DOT for hazardous material transport. Drivers must be fully qualified and properly trained for hazardous material transportation.

Prior to transporting hazardous materials, the contractor shall provide evidence of all proper licensing and certification to transport materials

One (1) copy of all documentation including the original manifest prepared by the Contractor shall be submitted to the USGS at the time of each pick-up for signature. All documentation must be clearly legible.

The Contractor shall dispose of all waste at an EPA approved waste disposal facility that has been approved by the USGS. It is the Contractor’s responsibility to obtain all necessary documentation verifying that the delivery of all items has been accomplished.

The Contractor shall comply with all applicable health and safety regulations and requirements (including reporting requirements) of the U.S. Government.

d. Permits and Licenses – General

In the performance of work hereunder, the Contractor shall obtain and maintain in effect all necessary permits and licenses required by Federal, State, or local government, or subdivision thereof, or of any other duly constituted public authority. At no separate or additional cost to the government, the contractor shall comply with all laws and regulations applicable to work to be performed hereunder, including any revised statutes or regulations effective during the life of the contract.

4. Support Information.

a. Invoices for services must include the Purchase Order Number, item description of each service, quantity of each service, and cost of each service.

b. The contractor shall provide disposal documents, signed by the authorized person at the disposal facility for the material disposed of, back to the government. Turn in disposal tickets as part of the invoicing process. The disposal ticket shall detail quantity/container or other volume, disposal fees, complete receipt including any/all descriptions produced by the disposal facility ticketing/receipting system, disposal facility name and location. Any discrepancies noted by, or refusals by the disposal facility shall be documented back to the government preferably on the tickets or by any other means.

c. A site visit will be scheduled to allow contractors to observe the site location. Attendance is strongly encouraged.

d. Period of Performance is 84 days from award date.

5. Center hours of operation:

This coordinated pick up of material must occur during normal center business hours, Monday through Friday, between 7:30 am and 4:00 pm.

Exhibit A List of PFAS Chemicals

Perfluorooctane sulfonate (PFOS), Perfluorooctanoate (PFOA), Perfluorohexane sulfonate (PFHxS), Perfluorobutane sulfonate (PFBS), Perfluorohexanoic acid (PFHxA), Exhibit B Photos

File details come from the government source that posted it. Updated .