WATER TOWER REFURBISHMENT Federal contract opportunity
Solicitation number
140G0126Q0123
Issued by
Department of the Interior US Geological Survey Office of Acquisitions and Grants

About this file

This is a Questions and Answers document (Amendment 1) for federal contract opportunity 140G0126Q0149 regarding the coating and rehabilitation of an elevated water tank at the Wetland and Aquatic Research Center.

The water tank is a 1985-constructed structure measuring 10 feet in height and 10 feet in diameter, elevated 25 feet in the air to facilitate gravity feed. The tank features a 30-inch diameter manway on top and is used exclusively for aquaculture and fish growth operations, not potable water. As-built construction drawings are not available for review. The tank does not contain lead, and existing coatings are non-hazardous, requiring no disinfection. USGS staff will drain the tank onsite prior to work commencement. All work must be performed during normal business hours of 8 a.m. to 5 p.m. Eastern Time; extended hours and weekend work are not permitted. The laydown area will be located on-site directly at the tank location, and water is available at the work location for pressure washing. No liquidated damages are assessed for this project, and no bid bond is required.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140G0126Q0149 Amendment 1 Q&A

Question# 1: Are as-built construction drawings for the water tower available for review, and do they include the 10-foot ladder?

Answer: No, as-builts are available

Question #2: The Statement of Work indicates that the water tank will be drained by others.

Does the Wetland and Aquatic Research Center intend to complete this under a separate contract before this requirement is performed?

Answer: Tanks will be drained onsite by USGS staff.

Question #3: Can the working hours be extended to include 10 hour working days and weekend work on Saturdays?

Answer: No, all work must be performed during normal business hours of 8 am to 5 pm Eastern.

Question #4: Do you know the general dimensions of the elevated water tank such as height and tank diameter?

Answer: Tank is 10 feet in height and 10 feet in diameter, elevated 25 feet in the air to allow for gravity feed.

Question #5: Where will the laydown area be for the project?

Answer: On-site directly at tank location.

Question #6: Is there a manway on top of the elevated water tank? Along with the diameter of it?

Answer: Yes. Manway is approximately 30 inches.

Question #7: Will disinfection of the elevated water tank be required? If so, to what standard?

Answer: No

Question #8: Is the elevated water tank for drinking water or will NSF standards apply for the interior coating system?

Answer: Tank is not used for potable water. Only used for aquaculture/fish growth.

Question #9: Are the existing coatings hazardous?

Answer: No

Question #10: Is water on site available for pressure washing?

Answer: Yes. There is water available directly at work location.

Question #11: Is there an amount for liquidated damages for this project?

Answer: No, there isn’t any amount for liquidated damages for this project.

140G0126Q0149 Amendment 1 Q&A Question #12: What year is the elevated water tank?

Answer: 1985

Question #13: Does the elevated water tank contain lead?

Answer: There is no lead.

Question #14: Please confirm that a bid bond is not required?

Answer: No a bid bond is not required.