Attachment_H_-_CSI_Format_Sample_Bid_Form.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Firm-Fixed-Price (FFP) effort for design/build con Federal contract opportunity
Solicitation number
140G0118R0030
Issued by
Department of the Interior US Geological Survey

About this file

CSI Format Sample Form

View the file

Other files for this federal contract opportunity

Other files attached to Firm-Fixed-Price (FFP) effort for design/build con, newest first.
File Type Posted
Sol_140G0118R0030_Amd_0003.pdf PDF
Attachment_A_1_of_3_Power-one-line.pdf PDF
Attachment_E_Release_of_Claims.pdf PDF
Sol_140G0118R0030.pdf PDF
Attachment_L_SF24_Bid_Bond.pdf PDF
Attachment_C_2_of_6_fuel_tank_characteristics.pdf PDF
Attachment_C_1_of_6_BNE_Fuel_tank_specs.pdf PDF
Attachment_C_3_of_6_Generator_drawing.pdf PDF
Attachment_I_Security_Document.pdf PDF
Attachment_J_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_C_6_of_6_Generator_details.pdf PDF
Attachment_K_DBA_SD180034.pdf PDF
Attachment_G_SF25A_Payment_Bond.pdf PDF
Attachment_A_2_of_3_E-4-buss_duct.pdf PDF
Attachment_A_3_of_3_E106.pdf PDF
Attachment_B_Owner_furnished_equipment.pdf PDF
Attachment_C_4_of_6_Generator_drawing__2.pdf PDF
Attachment_C_5_of_6_Generator_Specifications.pdf PDF
Attachment_C_2_of_6_fuel_tank_characteristics.pdf PDF
Attachment_A_3_of_3_E106.pdf PDF
Attachment_C_4_of_6_Generator_drawing__2.pdf PDF
Attachment_H_-_CSI_Format_Sample_Bid_Form.xlsx XLSX spreadsheet
Attachment_G_SF25A_Payment_Bond.pdf PDF
Attachment_C_3_of_6_Generator_drawing.pdf PDF
Attachment_E_Release_of_Claims.pdf PDF
Attachment_A_1_of_3_Power-one-line.pdf PDF
Attachment_D_-_Payrolls_(WH-347).pdf PDF
Attachment_L_SF24_Bid_Bond.pdf PDF
Attachment_B_Owner_furnished_equipment.pdf PDF
Attachment_F_SF25_Performance_Bond.pdf PDF
Attachment_K_DBA_SD180034.pdf PDF
Attachment_D_-_Payrolls_(WH-347).pdf PDF
Attachment_J_-_Past_Performance_Questionnaire.docx DOCX document
Sol_140G0118R0030.pdf PDF
Attachment_A_3_of_3_E106.pdf PDF
Attachment_F_SF25_Performance_Bond.pdf PDF
Attachment_C_6_of_6_Generator_details.pdf PDF
Attachment_C_5_of_6_Generator_Specifications.pdf PDF
Attachment_C_4_of_6_Generator_drawing__2.pdf PDF
Attachment_I_Security_Document.pdf PDF
Attachment_A_2_of_3_E-4-buss_duct.pdf PDF
Attachment_C_1_of_6_BNE_Fuel_tank_specs.pdf PDF
Attachment_A_1_of_3_Power-one-line.pdf PDF
Attachment_L_SF24_Bid_Bond.pdf PDF
Attachment_H_-_CSI_Format_Sample_Bid_Form.xlsx XLSX spreadsheet
Attachment_B_Owner_furnished_equipment.pdf PDF
Attachment_C_3_of_6_Generator_drawing.pdf PDF
Attachment_K_DBA_SD180034.pdf PDF
Attachment_C_2_of_6_fuel_tank_characteristics.pdf PDF
Attachment_E_Release_of_Claims.pdf PDF
Show all 50

Firm-Fixed-Price (FFP) effort for design/build con has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form EROS Electrical Distribution Upgrade - RFP 140G0118R0030

Category Price % of Total Cost Reduction Targets LSY 50% Reduced variance

0.001General RequirementsERROR:#DIV/0!ERROR:#REF!$115,000.00$115,000.00
0.002DemolitionERROR:#DIV/0!ERROR:#REF!$59,218.00$59,218.00
0.003ConcreteERROR:#DIV/0!ERROR:#REF!$0.00$0.00
0.004MasonryERROR:#DIV/0!ERROR:#REF!$0.00$0.00
0.005MetalsERROR:#DIV/0!ERROR:#REF!$25,267.00$25,267.00
0.006Wood and PlasticsERROR:#DIV/0!ERROR:#REF!$20,244.00$20,244.00
0.007Thermal and Moisture ProtectionERROR:#DIV/0!ERROR:#REF!$1,425.00$1,425.00
0.008Openings, Doors, Windows, and HardwareERROR:#DIV/0!ERROR:#REF!$41,378.00$41,378.00
0.009FinishesERROR:#DIV/0!ERROR:#REF!$67,217.00$67,217.00
0.010SpecialtiesERROR:#DIV/0!ERROR:#REF!$47,632.00$47,632.00
0.011EquipmentERROR:#DIV/0!ERROR:#REF!$10,513.00$10,513.00
0.012FurnishingsERROR:#DIV/0!ERROR:#REF!$0.00$0.00
0.013Special ConstructionERROR:#DIV/0!ERROR:#REF!$0.00$0.00
0.014Conveying SystemsERROR:#DIV/0!ERROR:#REF!$0.00$0.00
0.021Fire ProtectionERROR:#DIV/0!ERROR:#REF!$15,024.00$15,024.00
0.022PlumbingERROR:#DIV/0!ERROR:#REF!$12,619.00$12,619.00
0.023Heating, Ventilation and Air ConditioningERROR:#DIV/0!ERROR:#REF!$143,103.00$143,103.00
0.026ElectricalERROR:#DIV/0!ERROR:#REF!$85,038.00$85,038.00
0.027CommunicationsERROR:#DIV/0!ERROR:#REF!$130,000.00$130,000.00
0.028Electronic Safety and SecurityERROR:#DIV/0!ERROR:#REF!$0.00$0.00
0.031EarthworkERROR:#DIV/0!ERROR:#REF!$0.00$0.00
0.032exteriorERROR:#DIV/0!ERROR:#REF!$0.00$0.00
0.033utilitiesERROR:#DIV/0!ERROR:#REF!$0.00$0.00
0.034transportationERROR:#DIV/0!ERROR:#REF!$0.00$0.00
G. Construction Sub-TotalERROR:#REF!$773,678.00$773,678.00
H. General Contractor OHERROR:#REF!$77,367.80$77,367.80
sub totalERROR:#REF!$851,045.80$851,045.80
H.10 BondERROR:#REF!$12,765.69$12,765.69
sub totalERROR:#REF!$863,811.49$863,811.49
H.20 ProfitERROR:#REF!$86,381.15$86,381.15
sub totalERROR:#REF!$950,192.64$950,192.64

I. Total Construction Costs ERROR:#REF! ERROR:#REF! ERROR:#REF!

&F

File details come from the government source that posted it.