Attachment_H_-_CSI_Format_Sample_Bid_Form.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Firm-Fixed-Price (FFP) effort for design/build con
Solicitation number
140G0118R0030
Issued by

About this file

CSI Format Sample Form

View the file

Other files

File Type Posted
Sol_140G0118R0030_Amd_0003.pdf PDF
Sol_140G0118R0030_Amd_0002.pdf PDF
Sol_140G0118R0030_Amd_0001.pdf PDF
Attachment_C_5_of_6_Generator_Specifications.pdf PDF
Attachment_A_2_of_3_E-4-buss_duct.pdf PDF
Attachment_C_1_of_6_BNE_Fuel_tank_specs.pdf PDF
Attachment_H_-_CSI_Format_Sample_Bid_Form.xlsx XLSX spreadsheet
Attachment_L_SF24_Bid_Bond.pdf PDF
Attachment_A_1_of_3_Power-one-line.pdf PDF
Attachment_C_6_of_6_Generator_details.pdf PDF
Attachment_I_Security_Document.pdf PDF
Attachment_F_SF25_Performance_Bond.pdf PDF
Attachment_D_-_Payrolls_(WH-347).pdf PDF
Attachment_C_2_of_6_fuel_tank_characteristics.pdf PDF
Attachment_E_Release_of_Claims.pdf PDF
Sol_140G0118R0030.pdf PDF
Attachment_C_3_of_6_Generator_drawing.pdf PDF
Attachment_J_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_G_SF25A_Payment_Bond.pdf PDF
Attachment_K_DBA_SD180034.pdf PDF
Attachment_A_3_of_3_E106.pdf PDF
Attachment_B_Owner_furnished_equipment.pdf PDF
Attachment_C_4_of_6_Generator_drawing__2.pdf PDF
Attachment_A_1_of_3_Power-one-line.pdf PDF
Sol_140G0118R0030.pdf PDF
Attachment_H_-_CSI_Format_Sample_Bid_Form.xlsx XLSX spreadsheet
Attachment_C_1_of_6_BNE_Fuel_tank_specs.pdf PDF
Attachment_J_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_C_4_of_6_Generator_drawing__2.pdf PDF
Attachment_A_2_of_3_E-4-buss_duct.pdf PDF
Attachment_I_Security_Document.pdf PDF
Attachment_K_DBA_SD180034.pdf PDF
Attachment_C_6_of_6_Generator_details.pdf PDF
Attachment_F_SF25_Performance_Bond.pdf PDF
Attachment_A_3_of_3_E106.pdf PDF
Attachment_C_2_of_6_fuel_tank_characteristics.pdf PDF
Attachment_C_3_of_6_Generator_drawing.pdf PDF
Attachment_E_Release_of_Claims.pdf PDF
Attachment_G_SF25A_Payment_Bond.pdf PDF
Attachment_C_5_of_6_Generator_Specifications.pdf PDF
Attachment_D_-_Payrolls_(WH-347).pdf PDF
Attachment_L_SF24_Bid_Bond.pdf PDF
Attachment_B_Owner_furnished_equipment.pdf PDF
Attachment_L_SF24_Bid_Bond.pdf PDF
Attachment_C_6_of_6_Generator_details.pdf PDF
Attachment_F_SF25_Performance_Bond.pdf PDF
Attachment_A_3_of_3_E106.pdf PDF
Attachment_C_3_of_6_Generator_drawing.pdf PDF
Sol_140G0118R0030.pdf PDF
Attachment_J_-_Past_Performance_Questionnaire.docx DOCX document
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form EROS Electrical Distribution Upgrade - RFP 140G0118R0030

Category Price % of Total Cost Reduction Targets LSY 50% Reduced variance

0.001General RequirementsERROR:#DIV/0!ERROR:#REF!$115,000.00$115,000.00
0.002DemolitionERROR:#DIV/0!ERROR:#REF!$59,218.00$59,218.00
0.003ConcreteERROR:#DIV/0!ERROR:#REF!$0.00$0.00
0.004MasonryERROR:#DIV/0!ERROR:#REF!$0.00$0.00
0.005MetalsERROR:#DIV/0!ERROR:#REF!$25,267.00$25,267.00
0.006Wood and PlasticsERROR:#DIV/0!ERROR:#REF!$20,244.00$20,244.00
0.007Thermal and Moisture ProtectionERROR:#DIV/0!ERROR:#REF!$1,425.00$1,425.00
0.008Openings, Doors, Windows, and HardwareERROR:#DIV/0!ERROR:#REF!$41,378.00$41,378.00
0.009FinishesERROR:#DIV/0!ERROR:#REF!$67,217.00$67,217.00
0.010SpecialtiesERROR:#DIV/0!ERROR:#REF!$47,632.00$47,632.00
0.011EquipmentERROR:#DIV/0!ERROR:#REF!$10,513.00$10,513.00
0.012FurnishingsERROR:#DIV/0!ERROR:#REF!$0.00$0.00
0.013Special ConstructionERROR:#DIV/0!ERROR:#REF!$0.00$0.00
0.014Conveying SystemsERROR:#DIV/0!ERROR:#REF!$0.00$0.00
0.021Fire ProtectionERROR:#DIV/0!ERROR:#REF!$15,024.00$15,024.00
0.022PlumbingERROR:#DIV/0!ERROR:#REF!$12,619.00$12,619.00
0.023Heating, Ventilation and Air ConditioningERROR:#DIV/0!ERROR:#REF!$143,103.00$143,103.00
0.026ElectricalERROR:#DIV/0!ERROR:#REF!$85,038.00$85,038.00
0.027CommunicationsERROR:#DIV/0!ERROR:#REF!$130,000.00$130,000.00
0.028Electronic Safety and SecurityERROR:#DIV/0!ERROR:#REF!$0.00$0.00
0.031EarthworkERROR:#DIV/0!ERROR:#REF!$0.00$0.00
0.032exteriorERROR:#DIV/0!ERROR:#REF!$0.00$0.00
0.033utilitiesERROR:#DIV/0!ERROR:#REF!$0.00$0.00
0.034transportationERROR:#DIV/0!ERROR:#REF!$0.00$0.00
G. Construction Sub-TotalERROR:#REF!$773,678.00$773,678.00
H. General Contractor OHERROR:#REF!$77,367.80$77,367.80
sub totalERROR:#REF!$851,045.80$851,045.80
H.10 BondERROR:#REF!$12,765.69$12,765.69
sub totalERROR:#REF!$863,811.49$863,811.49
H.20 ProfitERROR:#REF!$86,381.15$86,381.15
sub totalERROR:#REF!$950,192.64$950,192.64

I. Total Construction Costs ERROR:#REF! ERROR:#REF! ERROR:#REF!

&F

File details come from the government source that posted it.