Sol_140FGA26Q0061_Amd_0004.pdf
PDF 221 KB Posted
- Attached to
- UT-OURAY NWR-SEPTIC REPAIR
- Solicitation number
- 140FGA26Q0061
About this file
This is Amendment 4 to a federal solicitation for septic system repair services at the Uinta-Ouray National Wildlife Refuge (UT-OURAY NWR) in Utah. The amendment extends the quotation due date from September 4, 2026, to September 10, 2026, and provides government responses to sixteen questions submitted by prospective offerors regarding technical and procedural requirements.
The solicitation pertains to septic system and drainfield repair/replacement for a facility complex including an office, shop, bunkhouse, two RV pads, and public restroom supporting up to 15 employees. Key clarifications include: design flow of 990 gallons per day as determined by Tricounty Health; provision of historical installation data and inspection records as attachments; contractor responsibility for Tricounty Health Department permit and plan review fees; requirement for certified Utah septic system installer; acceptance of subcontractor experience from the past five years; application of Wage Determination UT20260103 (Highway construction type) with plumbing work performed under the "Laborer: Pipelayer" classification; and evaluation under FAR 13.106-2 simplified acquisition comparative procedures with no public bid opening. The performance period runs from September 21, 2026, to November 15, 2026, with a mandatory 45-day performance estimate commencing after Notice to Proceed issuance and approval of contractor submittals by the contracting officer's representative. Individual site visits may be arranged by contacting Lisa Wilson at 509-531-6169. The issuing office is the Fish and Wildlife Service (FWS) at 5275 Leesburg Pike, Falls Church, Virginia 22041.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Nicole Johnson
See continuation page
FWS GAOA
FWS, GAOA
5275 Leesburg Pike Falls Church VA 22041
FGA
140FGA26Q0061
08/07/2026
08/07/2026
1 5
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140FGA26Q0061/0004
UT-OURAY NWR-SEPTIC REPAIR
The purpose of Amendment 4 is to issue the
Government's responses to questions received from prospective offerors and to incorporate resulting clarifications into the solicitation.
To allow vendors sufficient time to update their quotations based on these Q&A responses, the quotation due date is hereby extended from
September 4, 2026, to September 10, 2026.
Offerors shall review this amendment in full and acknowledge receipt as required.
Numbering continued from Amendment 1.
Q6. Please provide the approximate installation date/age of the existing septic system and drainfield. Please also provide any available original plans, as-built drawings, permits, inspection records, tank specifications, or previous septic repair records
A6. Installation was in approximately 2000. See
Attachments 1 and 2 - "historical data" files and Attachment 3 - "2026 inspection".
Q7. At the site visit, the rangers on site said there will be a site assessment conducted by the health department to confirm hydraulic low grades. To clarify, the government is responsible for scheduling that service, correct? Also, when will that service be conducted?
A7. Service was conducted by Tricounty Health.
Results attached: Attachment 4 - Tricounty
Health letter and Attachment 5 - Tricounty
Health Site Assessment.
Q8. Design flow (Amendment 0001, A2). Amendment
0001 states that the Government does not have a firm gallons-per-day figure and that the contractor is to size the field in accordance with Utah code. Absent a Government-furnished design flow, will the Government accept a design flow derived from the Utah
Administrative Code R317-4 fixture and occupancy tables, applied to the facilities
Continued...
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C) named in the Statement of Work - office, shop, bunkhouse, two RV pads, up to 15 employees and a public restroom - as the basis of the offeror's design and price?
A8. Flow rate determined by Tricounty Health at
990 gallons per day.
Q9. Proposed drawings (Amendment 0001, A4).
Amendment 0001 states that the Government holds multiple proposed drawings but no as-built drawings. Those drawings were not included in the solicitation attachments. Will the
Government transmit them to all offerors by amendment?
A9. Proposed drawings in Attachments 1 and 2
"historical data" files.
Q10. Site visit. The two organized site visits of 17 and 24 August 2026 have passed. Given that Amendment 0001 states an onsite visit is required in order for the contractor to locate the field, will the Government accommodate an individual site visit prior to the closing date, and if so, with whom should it be arranged?
A10. Yes, we can accommodate individual site visits. Please coordinate with Lisa Wilson at
509-531-6169.
Q11. Permitting (Amendment 0002, Q/A6).
(a) Are TriCounty Health Department permit and plan review fees the contractor's responsibility, to be included in the quoted price?
(b) Does the Department require that the installing contractor hold a current Utah septic system installer certification, and if so, (c) must that firm be identified in the quotation?
A11a. Yes
A11b. Yes
A11c. Yes
Q12. Design submittal and review time.
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
Amendment 0001 places final design and soils testing on the contractor, while SF 1442 Item
11 fixes performance at 14 calendar days to commence and 45 calendar days to complete, marked mandatory. (a) When is the contractor's design due, and to whom is it submitted? (b)
Does Government or health department review time count against the 45-day performance period, or is that period tolled pending approval?
A12. The 45-day period of performance (PoP) is an estimate. If that is not feasible, please submit a proposed schedule with your quote.
Also, the 45-day PoP starts after the Notice to
Proceed has been received. That will be issued after submittals have been received and approved. Those are approved by the contracting officer's representative (COR) assigned on this project.
Q13. Relevant experience - subcontractor references. Attachment 4 and Section L.2.1.2 request three examples of similar septic system or drainfield work. Where the septic scope is to be performed by an identified subcontractor, will the Government accept and evaluate that subcontractor's project references under Factor
2, provided they are clearly identified as the subcontractor's experience?
A13. Yes, we will accept the subcontractors' experience.
Q14. Past performance lookback period.
Attachment 4, Item 6 requires experience
"completed within the past three (3) years," while Section L.2.1.2 requests examples
"performed within the last five (5) years."
Please confirm which period governs.
A14. Please follow the instructions in sections
L and M. Examples from the past 5 years.
Q15. Wage determination. (a) Wage Determination
UT20260103, Revision 1, is designated Highway construction type. Please confirm this is the intended determination for a septic and
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C) building utility repair, rather than a Building type determination. (b) The determination lists no Plumber or Pipefitter classification. Please confirm the classification the Government intends to govern plumbing labor - whether such work is to be performed under "Laborer:
Pipelayer," or whether a conformance request under 29 CFR 5.5(a)(1)(ii) is anticipated.
A15. The Government confirms that Wage
Determination UT20260103 (Highway), Revision 1, is the appropriate determination for this requirement because the work is primarily site civil in nature, including drainfield construction, excavation, and underground utility/septic repairs, which fall under the
Highway/Heavy construction category rather than
Building. The determination does not include a
Plumber or Pipefitter classification;
therefore, plumbing related tasks associated with underground utility and septic system repairs are to be performed under the "Laborer:
Pipelayer" classification. If a contractor believes additional plumbing classifications are warranted, a conformance request under 29
CFR 5.5(a)(1)(ii) may be submitted for consideration.
Q16. Type of solicitation. SF 1442 Item 2 marks neither "Sealed Bid (IFB)" nor "Negotiated
(RFP)," while Sections L and M describe a comparative best value evaluation under FAR
Part 13 simplified acquisition procedures.
Please confirm that quotations will be evaluated under FAR 13.106-2 and that no public bid opening will occur.
A16. Confirmed. Quotations will be evaluated under FAR 13.106 2 using simplified acquisition comparative procedures, and no public bid opening will occur.
Period of Performance: 09/21/2026 to
11/15/2026
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .