RFQ 140FF027Q0038 – Painting and Flooring Installation
This is a Request for Quotation (Amendment 2) from the U.S. Fish and Wildlife Service (FWS) for interior painting and laminate flooring installation at Quarters #4, Warm Springs National Fish Hatchery, Warm Springs, Oregon. The 2,500-square-foot residence requires comprehensive interior painting of walls, ceilings, doors, trim, closets, hallways, stairwells, bathrooms, basement areas, and cold air returns. Painting excludes the garage, kitchen and bathroom cabinets, and existing stair handrails. The contractor must prepare surfaces through patching, sanding, and caulking; apply ultra-premium, low-VOC interior coating (Benjamin Moore or approved equal) in eggshell finish for walls/ceilings and semi-gloss for doors/trim; use mold- and mildew-resistant primer in bathrooms; and provide final cleanup. The base flooring scope includes removal of existing carpet and installation of Pergo waterproof, pet-scratch-resistant laminate flooring (or waterproof luxury vinyl plank) in living room, dining room, hallway, hallway closets, entryway, stairs, and downstairs landing area. Optional flooring prices must be quoted separately for all bedrooms, the kitchen, and both bathrooms.
The contractor must furnish all labor, materials, equipment, supervision, transportation, and disposal services. No floor plans or government quantity takeoffs are provided; offerors are responsible for verifying dimensions and site conditions. A site visit was held November 10, 2026, with attendance optional and no additional visits planned. The performance period is January 19, 2027 through February 19, 2027, with normal working hours Monday through Friday, 8:00 a.m. to 3:30 p.m. PST, though alternative hours may be approved. The government will provide existing electricity and water; material staging and dumpster locations will be coordinated during pre-construction. All work must comply with applicable Federal, State, and local codes and manufacturer recommendations. The contractor shall correct any deficiencies identified during inspection at no additional cost and must provide a one-year workmanship warranty from the date of government acceptance. The residence was constructed in 1978 and last painted in 2015; hazardous-material abatement is excluded from scope, and contractors must immediately notify the Contracting Officer if suspected hazardous materials are encountered.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ
140FF027Q0038
Amendment 2
FWS OR-Warm Springs National Fish Hatchery Quarters #4
Painting and Flooring Installation
STATEMENT OF WORK
Red text identifies revisions and clarifications incorporated through the solicitation amendments and consolidated questions and answers.
1. Description of Work
The Contractor shall furnish all labor, materials, equipment, supervision, transportation, and disposal services necessary to complete interior painting and laminate flooring installation at Quarters #4, Warm Springs National Fish Hatchery, 1 Fish Hatchery Road, Warm Springs, Oregon.
All work shall be completed in a professional manner and in accordance with applicable Federal, State, and local codes and manufacturer recommendations.
The residence is approximately 2,500 square feet and consists of three bedrooms, two bathrooms, kitchen, living room, dining room, closets, hallways, stairways, and basement.
No floor plans, drawings, room dimensions, or Government-furnished quantity takeoffs are available.
Offerors are responsible for verifying dimensions, quantities, and site conditions necessary to prepare their quotation. The organized site visit provided offerors an opportunity to verify existing conditions and measurements.
2. Interior Painting
The Contractor shall furnish all labor, materials, and supplies necessary to prepare and paint the interior of Quarters #4.
The garage, kitchen and bathroom cabinets, and existing stair handrails are excluded from the painting scope.
The work includes painting of:
• Walls
• Ceilings
• Doors
• Trim
• Closets
• Hallways
Amendment 2
FWS OR-Warm Springs National Fish Hatchery Quarters #4
• Stairwell
• Bathrooms
• Basement areas
• Cold air returns
The Contractor shall:
1. Prepare surfaces as necessary to achieve a professional finish, including patching holes and cracks, sanding, caulking, and cleaning.
2. Remove nails, hooks, and similar hardware not required to remain.
3. Protect flooring, fixtures, appliances, windows, smoke detectors, HVAC vents, and other adjacent surfaces from damage or paint overspray.
4. Prime repaired or stained surfaces as necessary to achieve a uniform finish.
Clean and paint cold-air-return vent covers in place. Removal and reinstallation are not required.
5. Apply an ultra-premium-quality, low-VOC interior coating suitable for residential use. Benjamin Moore products or approved equal.
6. Paint walls and ceilings with eggshell finish.
7. Paint doors and trim with semi-gloss finish.
Apply as many coats as necessary to provide a uniform, professional finish in accordance with the manufacturer’s recommendations. No specific number of finish coats is prescribed.
8. Apply mold- and mildew-resistant primer in bathroom areas.
9. Remove debris daily and maintain a clean work area throughout the project.
10. Perform final cleanup upon completion of all work.
All paint colors shall be approved by the Contracting Officer's Representative (COR) prior to application.
The base work includes preparation and painting of existing baseboards, interior trim, and interior doors. Provide separate prices for: (1) replacement of existing baseboards and trim with materials similar in appearance and finish to the existing materials; and (2) furnishing
Amendment 2
FWS OR-Warm Springs National Fish Hatchery Quarters #4 and installing two replacement interior doors similar in style and appearance to the existing doors, including required hardware, preparation, and painting.
3. Flooring Installation
The base flooring scope includes the living room, dining room, hallway, hallway closets, entryway, upper stair run, lower stair run, and downstairs landing area.
The Contractor shall furnish all labor, materials, equipment, supervision, and disposal services necessary to remove existing carpet and install laminate flooring in the following areas:
• Living room
• Dining room
• Hallway
• Hallway closets
• Entryway
• Stairs
• Downstairs landing area
The flooring shall be Pergo waterproof and pet scratch resistant laminate flooring or approved equal. Waterproof luxury vinyl plank (LVP), including products such as Pergo Extreme, is considered an acceptable approved equal.
The Contractor shall:
1. Remove and dispose of existing carpet, carpet padding, tack strips, and related materials in the common areas included in the base flooring scope. If the bedroom flooring option is exercised, remove and dispose of the existing carpet, carpet padding, tack strips, and related materials in the bedrooms. If the kitchen and/or bathroom flooring options are exercised, remove and dispose of the existing linoleum flooring in the applicable option areas. Dispose of all flooring materials removed under the contract.
2. Prepare the subfloor as necessary for installation, including removal of nails, staples, and minor surface irregularities. Significant unforeseen subfloor deficiencies beyond minor preparation shall be reported to the Contracting Officer for evaluation before additional work is performed.
Amendment 2
FWS OR-Warm Springs National Fish Hatchery Quarters #4
3. Install laminate flooring in accordance with the manufacturer's recommendations.
4. Install required stair nosing, transition strips, and trim accessories.
Replacement of existing stair treads and risers is not required.
5. Prepare and paint existing baseboards as part of the base work. The Government expects most existing baseboards and trim to remain in place and be prepared and painted as part of the base scope. However, several contractors noted during the site visit that the existing baseboards and trim appear to have a lacquer- or enamel-type finish that may make repainting more difficult. Additionally, in areas where existing carpet is removed and replaced with new flooring, there may be a significant gap between the bottom of the existing baseboards and the finished floor surface. For these reasons, offerors shall provide a separate price for replacement of baseboards and trim with materials similar in appearance and finish to the existing materials. The Government will determine after award whether replacement is necessary in any specific area. No specific baseboard profile, material, or color has been designated. Any replacement baseboards and trim should be similar in appearance and finish to the existing materials.
6. Remove debris daily and maintain a clean work area throughout the project.
7. Perform final cleanup upon completion of all work.
Flooring color and finish shall be approved by the COR prior to installation.
Provide separate option prices for removal of existing flooring and installation of the same waterproof flooring proposed for the base item in: (1) all bedrooms, (2) the kitchen, and (3) both bathrooms. The Government seeks a mid-grade waterproof flooring product that balances durability, appearance, and cost.
4. Place of Performance
Work shall be performed at:
Warm Springs National Fish Hatchery 1 Fish Hatchery Road Warm Springs, OR 97761 Quarters #4
5. Period of Performance
The period of performance shall be:
Amendment 2
FWS OR-Warm Springs National Fish Hatchery Quarters #4
The Contractor shall commence work in accordance with the Notice to Proceed and complete the work within the required contract performance period. The Government intends for the work to be completed before the residence is occupied.
January 19, 2027 through February 19, 2027
Normal working hours are Monday through Friday, 8:00 a.m. to 3:30 p.m.
Alternative work hours may be approved by the Hatchery Manager.
6. Site Visit
A site visit will be held on:
November 10, 2026, at 12:00 p.m. (PST)
Offerors are encouraged to inspect the site and verify existing conditions before submitting a quotation.
The Government conducted a site visit on November 10, 2026. Attendance was optional.
No additional site visits are planned.
7. Contractor Responsibilities
Existing electricity and water at the residence will be available for the Contractor’s use during performance.
The residence is currently vacant. The Government intends to complete the work before occupancy. Government-owned appliances or furnishings, including the refrigerator, stove, and any remaining furnishings, may remain before construction. The Government will move any appliances or furnishings necessary for the Contractor to perform the work. The Contractor is not responsible for moving Government property.
Material staging areas and dumpster or waste-container locations will be coordinated with the successful Contractor during the pre-construction meeting.
No badges, security clearances, background checks, or special site-access credentials are required. Contractor personnel shall carry photo identification, sign in upon arrival, and comply with site-coordination requirements. Access is limited to areas necessary for contract performance.
The Contractor shall:
Amendment 2
FWS OR-Warm Springs National Fish Hatchery Quarters #4
• Furnish all labor, materials, equipment, and supplies necessary to complete the work.
• Comply with all applicable Federal, State, and local laws and regulations.
• Obtain and pay for any required permits.
• Maintain a safe work environment.
• Remove all debris and excess materials generated by the work.
• Notify the COR of any unforeseen conditions that may affect project completion.
8. Inspection and Acceptance
The Government will inspect all work for completeness and quality.
Work will be considered acceptable when:
• Painting is complete and provides a uniform, professional appearance.
• Flooring is properly installed and free of visible defects.
• All required trim, transitions, and stair components are installed.
• All debris, materials, and equipment have been removed from the site.
• Final cleanup has been completed.
The Contractor shall correct deficiencies identified during inspection at no additional cost to the Government.
9. Safety
The Contractor shall comply with applicable OSHA safety requirements and provide necessary safety measures for employees and visitors.
Fall protection shall be used when required by applicable safety regulations.
Quarters #4 was constructed in 1978. No lead-based paint inspection or risk assessment is available. The residence was painted in 2015. Hazardous-material abatement is not included in the scope. If suspected hazardous material is encountered, stop work in the affected area and immediately notify the Contracting Officer.
10. Warranty
Amendment 2
FWS OR-Warm Springs National Fish Hatchery Quarters #4
The Contractor shall provide a one-year workmanship warranty from the date of Government acceptance.
11. Government Points of Contact