B09_Summary_of_abatement_work_0001.pdf
PDF 40 KB Posted
- Attached to
- Rehab Office Building - WV
- Solicitation number
- 140FC226R0006
About this file
This is a Statement of Work (SOW) for lead paint removal and abatement services at a residential property. The contractor is required to remove lead paint from specific interior locations including the first-floor stairway (balusters and stringers), foyer area (doors and trim with door jambs), and exterior painted entrance door and trim. Following removal, items 1-3 shall be repainted with latex paint. The contractor must also remove the top 6 inches of soil from the exterior perimeter of the house foundation wall to a distance of 4 feet outward around the entire house perimeter and replace it with imported topsoil that is fertilized, seeded, and mulched.
Additional work includes removing and replacing 4 basement windows with trim and 1 basement door with trim. The contractor must also apply encapsulating primer and paint to basement interior brick walls, measuring approximately 51 linear feet by 7.5 feet high. The contractor is responsible for furnishing all labor, materials, equipment, and incidentals necessary to complete the work in accordance with the specifications. Detailed floor plan sketches are referenced in the appendix to the specifications document for guidance on work locations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B09_Q_A_0001.docx | DOCX document | |
| Sol_140FC226R0006_Amd_0001.pdf | ||
| B09_lead_survey_results_and_diagrams_0001.pdf | ||
| Quote_Schedule_final.pdf | ||
| Past_Performance_Survey.pdf | ||
| Sol_140FC226R0006.pdf | ||
| SOW_revised.pdf | ||
| Wages.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .