BID_SCHEDULE.pdf

PDF 57 KB Posted

Attached to
Plum Island Boathouse Foundation Repairs
Solicitation number
140FC225R0003
Issued by

About this file

This is a bid schedule form for the Plum and Pilot Island Rehabilitation Project (No. 21-RF-014), specifically for Bid Package #2 - Boathouse Foundations. The schedule requires contractors to provide pricing for two line items: 1) Mobilization and Demobilization, and 2) Boathouse Foundation Rehabilitation, both as lump sum (L.S.) quantities.

The document includes provisions for potential credits or deducts based on salvageable material quantities, with unit prices to include all material equipment, labor overhead, profit, connection materials, and reinforcing. Contractors must provide documentation from the Testing Inspector to support quantity modifications, with the Government having 10 business days to respond to modification requests. The contract will be awarded according to Section M, Clause M-1 "Evaluation and Award," and incomplete bids will be considered non-responsive. The bid schedule is part of a larger solicitation package referenced on Standard Form 1442.

View the file

Other files

File Type Posted
Sol_140FC225R0003_Amd_0002.pdf PDF
Questions_Answers_0002.pdf PDF
Sol_140FC225R0003_Amd_0001.pdf PDF
Notice_to_Offerors.pdf PDF
SPECS_Part1.pdf PDF
SPECS_Part4of4.pdf PDF
Wage_Determinations.pdf PDF
PPQ.pdf PDF
SPECS_Part2.pdf PDF
SPECS_Part3.pdf PDF
CLAUSES.pdf PDF
DRAWINGS.pdf PDF
SF_24_Bid_Bond.pdf PDF
CPARS_Notice.pdf PDF
Sol_140FC225R0003.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Package #2 – Boathouse Foundations

Bid Schedule

Plum and Pilot Island Rehabilitation 00 41 00-1 Bidding and Construction – 2022

Project No. 21-RF-014

SECTION 00 41 00

BID SCHEDULE

Furnish all labor, tools, equipment, materials, superintendence, and transportation necessary to construct the project descried in Block 10 of Page A1, Solicitation, Offer, and Award, Standard Form 1442 in accordance with the Technical Specifications, Drawings, and terms and conditions contained herein as follows:

Basic Contract

Item No. Supplies/Services Quantity Unit Total

Item 1 Mobilization and Demobilization 1 L.S. $_________

Item 2 Boathouse Foundation Rehabilitation 1 L.S. $_________

TOTAL OF BASIC CONTRACT $______________

In the event a credit or deduct is needed based on quantity of salvageable material, unit prices may be utilized. Unit prices should include all material equipment, labor overhead, profit, connection materials, reinforcing, etc. as needed for the work. This table will be utilized in the event of modifications. Contractor shall provide basis for modification request, including documentation from the Testing Inspector to define the basis for quantity modifications. The Government has 10 business days once all information is received to respond to requests for modification.

Item Unit Price

Concrete

Award of contract will be made in accordance with Section M, Clause M-1 “Evaluation and Award.”

Incomplete bids will be considered non-responsive.

END OF SECTION 00 41 00