BID_SCHEDULE.pdf
PDF 57 KB Posted
- Attached to
- Plum Island Boathouse Foundation Repairs
- Solicitation number
- 140FC225R0003
About this file
This is a bid schedule form for the Plum and Pilot Island Rehabilitation Project (No. 21-RF-014), specifically for Bid Package #2 - Boathouse Foundations. The schedule requires contractors to provide pricing for two line items: 1) Mobilization and Demobilization, and 2) Boathouse Foundation Rehabilitation, both as lump sum (L.S.) quantities.
The document includes provisions for potential credits or deducts based on salvageable material quantities, with unit prices to include all material equipment, labor overhead, profit, connection materials, and reinforcing. Contractors must provide documentation from the Testing Inspector to support quantity modifications, with the Government having 10 business days to respond to modification requests. The contract will be awarded according to Section M, Clause M-1 "Evaluation and Award," and incomplete bids will be considered non-responsive. The bid schedule is part of a larger solicitation package referenced on Standard Form 1442.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FC225R0003_Amd_0002.pdf | ||
| Questions_Answers_0002.pdf | ||
| Sol_140FC225R0003_Amd_0001.pdf | ||
| Notice_to_Offerors.pdf | ||
| SPECS_Part1.pdf | ||
| SPECS_Part4of4.pdf | ||
| Wage_Determinations.pdf | ||
| PPQ.pdf | ||
| SPECS_Part2.pdf | ||
| SPECS_Part3.pdf | ||
| CLAUSES.pdf | ||
| DRAWINGS.pdf | ||
| SF_24_Bid_Bond.pdf | ||
| CPARS_Notice.pdf | ||
| Sol_140FC225R0003.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Package #2 – Boathouse Foundations
Bid Schedule
Plum and Pilot Island Rehabilitation 00 41 00-1 Bidding and Construction – 2022
Project No. 21-RF-014
SECTION 00 41 00
BID SCHEDULE
Furnish all labor, tools, equipment, materials, superintendence, and transportation necessary to construct the project descried in Block 10 of Page A1, Solicitation, Offer, and Award, Standard Form 1442 in accordance with the Technical Specifications, Drawings, and terms and conditions contained herein as follows:
Basic Contract
Item No. Supplies/Services Quantity Unit Total
Item 1 Mobilization and Demobilization 1 L.S. $_________
Item 2 Boathouse Foundation Rehabilitation 1 L.S. $_________
TOTAL OF BASIC CONTRACT $______________
In the event a credit or deduct is needed based on quantity of salvageable material, unit prices may be utilized. Unit prices should include all material equipment, labor overhead, profit, connection materials, reinforcing, etc. as needed for the work. This table will be utilized in the event of modifications. Contractor shall provide basis for modification request, including documentation from the Testing Inspector to define the basis for quantity modifications. The Government has 10 business days once all information is received to respond to requests for modification.
Item Unit Price
Concrete
Award of contract will be made in accordance with Section M, Clause M-1 “Evaluation and Award.”
Incomplete bids will be considered non-responsive.
END OF SECTION 00 41 00