This Performance Work Statement (PWS) details an exterior door replacement project for the Nashua National Fish Hatchery (NFH) in Nashua, New Hampshire. The project involves three primary components: (1) Base Bid - replacing deteriorated double and single metal exterior doors at the hatchery building, including reinstalling existing alarm components, (2) Additive #1 - replacing a metal door with transom at the maintenance building, and (3) Additive #2 - replacing double metal exterior doors with a transom window at the feed preparation building. All replacements include painting, caulking, and hardware installation.

The solicitation is set aside for small businesses, with a total requirement magnitude under $25,000. The project is issued by the U.S. Fish and Wildlife Service's Infrastructure Management Division, with a site visit scheduled for July 31, 2025, at 10:00 AM EDT. Questions are due by August 11, 2025, at 3:00 PM EDT, and quotes are due by August 20, 2025, at 3:00 PM EDT. Contractors must comply with Davis-Bacon wage rates, follow specific technical requirements for steel doors and frames, and adhere to various safety and environmental regulations during project execution.

View the file

Other files

File Type Posted
Sol_140FC225Q0048.pdf PDF
A22_BSR_Bid_form_Nashua_door_replacement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement

EXTERIOR DOOR REPLACEMENT

AT THE HATCHERY BUILDINGS

Nashua National Fish Hatchery

Nashua, NH

United States Fish and Wildlife Service Infrastructure Management Division 300 Westgate Center Dr.

Hadley, MA 01035

Exterior Door Replacement at the Hatchery Buildings, Page | i Nashua NFH

TABLE OF CONTENTS

SECTION PAGE

STATEMENT OF WORK

TECHNICAL AND MATERIAL REQUIREMENTS

WORK PERFORMANCE CRITERIA……

DEMOLITION……

HEAVY METAL DOOR FRAMES……

DOOR INSTALLATION……

HARDWARE……

ALARM……

PAINTING

ADMINISTRATIVE REQUIREMENTS

INSPECTION OF THE WORK SITE

SUBMITTALS

REQUIRED SUBMITTALS LIST

WORKSITE SAFETY

TEMPORARY FACILITIES AND CONTROLS

OPERATIONAL RESTRICTIONS

APPENDIX 1

Photographs of the Hatchery Buildings.

APPENDIX 2

Scan of original construction drawings of the buildings.

Exterior Door Replacement at the Hatchery Buildings, Page | 1

STATEMENT OF WORK

Work includes the following major components:

1. At the hatchery building, remove and replace one set of rusted and deteriorated heavy metal double exterior doors, frame and hardware; paint and caulk doors, and frames; and remove existing alarm components and reinstall on door and frame. Remove and replace one deteriorated heavy metal single exterior doors, frame and hardware; paint and caulk doors, and frames; and remove existing alarm components and reinstall on door and frame. (Base Bid)

2. At the maintenance building, remove and replace one set of rusted and deteriorated heavy metal door, frame with transom above, and hardware; and paint and caulk doors, and frames. (Additive #1)

3. At the feed preparation building, remove and replace one set of rusted and deteriorated heavy metal double exterior doors, frame with transom window above, and hardware; and paint and caulk doors, and frames. (Additive #2)

The Contractor shall furnish all plant, labor, equipment, appliances and materials and carry out all operations as necessary to accomplish the work, complete and in place. Provide all supervision, labor, consumables, equipment, and disposal. All work should be performed in accordance with manufacturer’s instructions and in accordance with these specifications, subject to the terms and conditions of the contract. The work shall be performed in accordance with all applicable State of New Hampshire, EPA, OSHA, IBC, NEC, NFPA, and local regulations. All work shall comply with codes and standards applicable to each type of work as specified within this contract.

TECHNICAL AND MATERIAL REQUIREMENTS

Steel Door Frames

● Steel door frames shall be 14-gauge, galvanized steel knock down or welded frames with a minimum of three wall anchors per jamb, appropriate for wall construction; floor anchors or additional wall anchors as required.

Steel Door Frames with Transom

● Steel door frames shall be 14-gauge, galvanized steel frames with fixed horizontal bar and glass above the door, with a minimum of three wall anchors per jamb, appropriate for wall construction; floor anchors or additional wall anchors as required.

● Glazing shall be tempered clear float glass and insulated.

● Glazing Sealant: Neutral-curing silicone glazing sealant complying with ASTM C 920, Type S, Grade NS, Class 25, Use NT.

Exterior Door Replacement at the Hatchery Buildings, Page | 2

Steel Doors

● Doors shall be SDI-100, Grade III, Extra Heavy Duty, 16-gauge smooth face, hot-dipped galvanized steel, seamless, Model 3, maximum U-factor of 0.24 BTU/HR/FT2/oF, ASTM 236.

The active leaf shall be approximate 3’-0” wide by 6’-8” tall and the other leaf shall be the required width to fill the opening. The maintenance building door is approximate 2’-8” wide by 6’-8” tall.

● Glazed Lites: Factory cut openings in doors with applied trim or kits to fit. The door glazing size shall approximately match the existing size of the glazing.

● Glazing shall be tempered clear float glass and insulated.

● Glazing Sealant: Neutral-curing silicone glazing sealant complying with ASTM C 920, Type S, Grade NS, Class 25, Use NT.

Door Hardware

● Hardware shall conform to the Americans with Disabilities Act Standards (ADA) except the flush bolt set.

● All hardware shall be non-rusting.

● Provide matching finishes for hardware units at each door or opening, to the greatest extent possible and except as otherwise indicated. Reduce differences in color and textures as much as commercially possible where the base metal or metal forming process is different for individual units of hardware exposed at the same door or opening.

● Locks, Latches and Bolts

● Strikes shall be manufacturer's standard wrought box strike for each latch or lock bolt, with curved lip extended to protect frame, finished to match hardware set.

● Series 4000 Grade One, Series 93K or equal.

● All locksets and latchsets shall be lever-operated mechanisms.

● The locks shall be keyed to match the existing Schlage locks and have removable core keying system. Provide two nickel silver keys for each lock.

● Hinges shall be heavy weight exterior, 4-1/2 by 4-1/2 inches with a width sufficient to clear trim projection when door swings 180 degrees, and ball bearings, with non-removable pins. Finish shall be BHMA 629 - Polished stainless steel.

● Flush bolt sets shall include strikes.

● Thresholds shall be for Handicapped with a non-skid, abrasive coating and not exceed 1/2" from finish floor surface. Fastenings for thresholds to be suitable for anchoring to the concrete floor material. All thresholds shall have integral thermal barriers and meet requirements of Americans with Disabilities Act guidelines.

Exterior Door Replacement at the Hatchery Buildings, Page | 3

● Weatherstripping shall be aluminum strip with tubular vinyl edge for top and sides and aluminum vinyl dragstrip for the bottom.

● Hardware Schedule:

● Hatchery Building (double and single doors) (Base Bid)

6 Hinges 1 Entry Function Lock/Latch 1 Closure 1 Flush Bolt Set 1 Astragal 2 Weatherstripping/Gasketing 2 Door Sweeps 1 Threshold

● Maintenance Building (Additive #1)

3 Hinges 1 Entry Function Lock/Latch 1 Closure 1 Weatherstripping/Gasketing 1 Door Sweep 1 Threshold

● Feed Preparation Building (Additive #2)

6 Hinges 1 Entry Function Lock/Latch 1 Closure 1 Flush Bolt Set 1 Astragal 2 Weatherstripping/Gasketing 2 Door Sweeps 1 Threshold

Paint

● Personal door and frame paint shall be zero or low VOC, semi-gloss acrylic latex paint. Paints shall include anti-mold and anti-mildew additives. Primer used on galvanized metal shall be formulated for that use.

WORK PERFORMANCE CRITERIA

Demolition

● Doors, frames, and hardware shall be removed and disposed of.

● All demolition and construction debris shall be disposed of according to Federal, State and local regulations.

Hinges Entry Function Lock/Latch Closure Weatherstripping/Gasketing Door Sweep Threshold

Exterior Door Replacement at the Hatchery Buildings, Page | 4

● All waste materials, debris, and rubbish shall be placed into waste containers on a daily basis.

Heavy Metal Door Frames

● Frames shall be installed plumb, level, rigid and in true alignment as recommended in ANSI/SDI A250.11 “Recommended Erection Instructions for Steel Frames” and A115.IG, “Installation Guide for Doors and Hardware.” All frames shall be fastened to the adjacent structure to retain their position and stability.

● Frames shall be installed weather tight and caulked as required on both in interior and exterior of the building.

Door Installation

● Doors have been hung per manufacturer’s recommendations printed instructions and in accordance with Door Hardware Institute (DHI).

● Field Glazing: Comply with installation requirements IGMA Publication for Insulating Glass:

SIGMA TM-3000, "North American Glazing Guidelines for Sealed Insulating Glass Units for Commercial and Residential Use" and with hollow metal manufacturer's written instructions.

● All conditions and requirements of the Door Guarantee in order not to void the guarantee shall be observed.

● The tolerances maximum allowed variation from true position shall be 1/16".

• The doors have been hung and shall swing freely without auto closing or opening on its’ own.

• The double doors the active leaf must be 36 inches wide.

Hardware

● On the new double doors hardware as specified in the hardware schedule shall be installed and, lockset cover, strike plate shall be installed in accordance with manufacturers' printed instructions. Hardware shall be pre-fit before finish is applied; remove and reinstall after finish is complete and dry. Install and adjust hardware so that parts operate smoothly, close tightly, and do not rattle.

● Installation of hardware items shall be in accordance with the hardware manufacturer’s recommendations and templates. A115.IG, “Installation Guide for Doors and Hardware” and ANSI/SDI A250.6, “Recommended Practice for Hardware Reinforcing on Standard Steel Doors and Frames” shall be consulted for other pertinent information.

Alarm

● The alarm sensors shall be reattached to the frame and door: and the alarm system functions as required at this door.

Painting https://www.steeldoor.org/T-DOC/ansi-250-11.php https://www.steeldoor.org/T-DOC/ansi-250-11.php https://www.steeldoor.org/T-DOC/ansi-250-6.php

Exterior Door Replacement at the Hatchery Buildings, Page | 5

● The new metal door frames and new personal doors shall be painted with one prime coat and two finish coats trim paint. Door hardware shall not be painted.

ADMINISTRATIVE REQUIREMENTS

Inspection of the Work Site

● Prospective bidders are encouraged to inspect the site and satisfy themselves as to the condition under which they will work, or which will affect the work in any manner.

● Government provided dimensions have been provided to give a scale of the scope of work involved for the project. Prospective quoters are responsible for obtaining their own field dimensions for estimating purposes.

● The Facility is located at 151 Broad Street, Nashua, NH 03063.

● Prospective Contractors are encouraged to inspect the site and satisfy themselves as to the condition under which they will work, or which will affect the work in any manner. A date and time for an inspection of the site will be set during the solicitation period. Please contact the Contracting Officers Representative, Kelly Harshbarger at kelly_harshbarger@fws.gov or 413- 253-8288 to schedule a site visit.

● All inquiries concerning the contract documents shall be made to Contract Specialist, Bill Koski at william_koski@fws.gov or 413-253-8389.

Submittals

● Submit for Government approval information concerning the quality of all products, materials and equipment to be used on this project. Submittal will include enough information for the Government to determine if the materials meet the specified quality requirements. Submittal forms shall be furnished to the Contractor and shall be used when submitting all submittals.

● Each submittal item plus a completed Material Approval Submittal form shall be submitted directly to the COR for review. Up to twelve (12) items or groups of items may be submitted on each submittal form. These submittals shall be mailed to the COR. This form shall be mailed to U.S. Fish and Wildlife Service, 300 Westgate Center Drive, Hadley, MA 01035-9589 to the attention of Kelly Harshbarger.

● A Microsoft Word electronic copy of the Material Approval Submittal form will be provided to the Contractor for their use.

● The Contractor shall e-mail the completed form in .doc format for each submittal back to kelly_harshbarger@fws.gov.

● Electronic submittals are permitted.

● The Contractor shall submit documentation regarding the following items to the Contracting Officer Representative for review and approval. Documentation submitted shall include but is not limited to the following list:

mailto:kelly_harshbarger@fws.gov mailto:william_koski@fws.gov

Exterior Door Replacement at the Hatchery Buildings, Page | 6

Required Submittals List:

No. Description of Item Submitted

1. Project Schedule – start and estimated completion dates.

2. Schedule of values.

3. Landfill and Recycling Facility Records.

4. Safety Plan as described below.

5. Steel door.

6. Steel door frame.

7. Door hardware.

8. Primer and paint.

Worksite Safety

● The Contractor is solely responsible for the safety and protection of all persons and property at the project site. The Contractor shall strictly comply with all provisions of the Code of Federal Regulations (CFR) 29 CFR 1910 Occupational Safety and Health Standards (OSHA), and 29 CFR 1926 Safety and Health Regulations for Construction.

● A type written Safety Plan shall be submitted consisting of a few paragraphs describing the anticipated hazards to the workers, USFWS employees, and the general public associated with this type of work and the proposed steps taken to eliminate the hazards. The contractor shall submit a signed and dated Safety Plan for review and acceptance by the Contracting Officer or their representative before beginning work. Hiring a consultant to write the safety plan is not required for this project. Acceptance of the contractor’s safety plan does not relieve the contractor of the responsibility to comply with all contract requirements, applicable laws, and regulations.

Temporary Facilities and Controls

● The Contractor shall furnish, erect and maintain all temporary construction facilities and controls and perform all temporary work as required to complete the finished work in accordance with the contract documents.

● Temporary facilities shall be defined as include construction trailers, storage trailers, sanitary toilets, waste containers, staging, rigging, portable generators, required safety measures and any such facility required to complete or support the completion of the work but not to be incorporated as a part of the completed project.

● Electricity, water and restroom are available on-site. Contractors may utilize these utilities provided no modifications are required. The Contractor shall make those investigations necessary to determine the availability of and existing conditions regarding the utilities at the site.

● Drinking water and telephone shall be furnished by the Contractor at the Contractor’s expense.

● The Contractor shall provide adequate on-site containers for the collection of waste materials, debris and rubbish.

Exterior Door Replacement at the Hatchery Buildings, Page | 7

● Waste materials shall be disposed of in accordance with all Federal, State and local regulations.

● All temporary services and facilities shall be removed at the Contractors expense prior to work being considered complete.

Operational Restrictions

● The Hatchery will be open during the performance of the contract.

● The Contractor shall notify the Contracting Officer if it becomes necessary to interrupt any function of the Hatchery. The Contractor shall not proceed without the expressed approval of the Contracting Officer and not until such time as provisions are made to modify the hatcheries operations, as required.

● Normal work hours are from 7:30 AM through 4:00 PM, Monday through Friday. The Contractor will not be permitted to work on Saturday, Sunday or legal holidays unless otherwise authorized by the Contracting Officer.

- END OF SECTION -

APPENDIX 1

Exterior Door Replacement at the Hatchery Buildings, Page | 8

Hatchery Building.

Maintenance Building door with transom window above.

Exterior Door Replacement at the Hatchery Buildings, Page | 9

Feed Storage Building door with transom window above.

APPENDIX 2

Section Title

Part I—The Schedule

A Solicitation/Contract Form

B Prices

C Description/Specifications/Statement of Work

D Packaging and Marking

E Inspection and Acceptance

F Project Delivery

G Contract Administration Data

H Special Contract Requirements

Part II—Contract Clauses

I Contract Clauses

Part III—List of Documents, Exhibits, and Other Attachments

J List of Attachments

Part IV—Representations and Instructions

K Representations, Certifications, and other Statements of Offerors

L Instructions, Conditions, and Notices to Offerors

M Evaluation Factors for Award

SECTION B – PRICES (QUOTE SCHEDULE)

N/A

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

See Attached SOW

(End of Section C)

SECTION D – PACKAGING AND MARKING

D.1.0 PAYMENT OF POSTAGE FEES

All postage and fees related to submitting information forms, reports, etc., to the CO or the COR shall be paid by the contractor.

D.2.0 MARKING

All information submitted to the Contracting Officer or the Contracting Officer's Representative shall clearly indicate the Contract Number of the contract for which the information is being submitted.

(End of Section D)

SECTION E – INSPECTION AND ACCEPTANCE

The following clauses are incorporated by reference:

52.246-12 INSPECTION OF CONSTRUCTION AUG 1996

(End of Section E)

SECTION F – PROJECT DELIVERY

F.1.0 PERIOD OF PERFORMANCE

See clause 52.211-10 in this section.

52.242-14 SUSPENSION OF WORK APR 1984

The following clauses are provided in full text:

52.211-10 – COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 13 calendar days after the date the Contractor receives the award of contract, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 days after the date the contractor receives the award. The time stated for completion shall include final cleanup of the premises.

(End of Clause)

The completion date is based on the assumption that the successful offeror will receive the award by September 2, 2025. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

(End of Clause)

(End of Section F)

SECTION G – CONTRACT ADMINISTRATION DATA

Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP)

(February 2021)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform

System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

1. Invoice billed according to contract line items and rates.

2. Certified payrolls and Statement of Compliance in accordance with clause 52.222-8.

3. If the partial payment is billed and the invoice states a lump sum, the invoice shall include an itemized breakdown and narrative progress summary of the work performed during this invoice period.

4. If final payment is billed, the last invoice shall state “FINAL”.

5. Contractor’s Release of Claims shall be submitted with the final invoice.

https://www.ipp.gov/

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor

Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve

Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-

3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

(End of Local Clause)

(End of Section G)

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1.0 WORK HOURS

Unless otherwise specified in Section C, work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset each day. No work will be performed on Saturday, Sunday, or Federal holidays unless authorized by the COR.

H.2.0 ENVIRONMENTAL INTERRUPTION OF WORK

H.2.1 Environmental - The Contracting Officer, by issuance of a suspend work order, may direct the Contractor to shut down any work that may be subject to damage due to weather conditions, fire danger, or because it is impracticable to work during the winter season. The Contractor will be given a resume work order which will document the date the work suspension ends. The Contractor will not be entitled to additional monetary compensation for such suspensions regardless of duration. An allowance has been included in the contract time for environmental delays. The count of contract time will therefore continue during all periods of suspension due to normal weather conditions, including fire danger. The Contractor will not be entitled to additional contract time for any suspensions except to the extent that they are due to unusually severe weather conditions.

H.2.2 Endangered Species - The Government may direct the Contractor to discontinue all operations in the event that listed or proposed threatened or endangered plants or animals protected under the Endangered Species Act of 1973, as amended, are discovered to be present in or adjacent to the project area.

H.3.0 DRAWINGS

H.3.1 Reduced Size Drawings. Drawings appearing in this package may be photographically reduced in size. Accordingly, measurements and dimensions should not be taken or be based on any numerical scales shown. The Contractor may request full-size drawings from the COR.

H.4.0 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA

H.4.1 Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data

(including relics and specimens) which might otherwise be lost due to alteration of the terrain as a result of any Federal construction project.

H.4.2 The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, or archeological data the contractor will notify the Contracting Officer immediately in writing giving the location and nature of the findings.

H.4.3 Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in Section I of this contract.

H.4.4 The Contractor agrees to insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.

H.5.0 SUBSTITUTION – PROCESSION OF WORK

mailto:IPPCustomerSupport@fiscal.treasury.gov

Any proposed key personnel, minimum qualifications for incoming or replacement key personnel, subcontractors, processes, procedures or materials included in the quotation are hereby incorporated into the contract. Performance shall be limited to the personnel, qualifications, firms, procedures, and materials that were specifically identified in the RFQ response. The Contractor shall obtain the Contracting Officer’s written consent before making any substitutions or changes. All substitutions or replacements shall comply with the terms and conditions of the contract.

H.6.0 ENVIRONMENTAL IMPACT

All waste materials generated by any work under the contract performed on a Government installation shall at all times be handled, transported, stored, and disposed of by the contractor and by subcontractors in accordance with all applicable Federal, state, and local laws, ordinances, regulations, court orders, and other types of rulings having the effect of the law, including, but not limited to Executive Order 12088, 13 October 1978, Federal Compliance with Pollution Control Standards; the Federal Water Pollution Control Act, as amended (33 U.S.C. 1251 ET SEQ); the Clean Air Act as amended (42 U.S.C. Sec 7401 ET SEQ); the Endangered Species Act, as amended (16 U.S.C. Sec

1531, ET SEQ); the Toxic Substances Control Act, as amended (15 U.S.C. Sec 2601, ET SEQ); the National Historic Preservation Act, as amended (16 U.S.C. Sec 470, ET SEQ); the Solid Waste Disposal Act, as amended (42 U.S.C.

6901 ET SEQ); and the Archaeological and Historic Preservation Act, as amended (16 U.S.C. Sec 469, ET SEQ).

Should the United States Government be held liable for any neglect or improper actions by the contractor or any subcontractor regarding removal or disposal of any hazardous waste, the contractor shall reimburse the Government for all such liability.

H.7.0 HAZARDOUS MATERIALS

Any material suspected of being hazardous that is unexpectedly encountered during performance of a project shall immediately be brought to the attention of the Contracting Officer, at which time a determination will be made as to whether hazardous material testing shall be performed. If the Contracting Officer directs the contractor to perform tests, and/or the material is found to be of a hazardous nature requiring additional protective measures, a contract modification may be required, subject to equitable adjustment under the terms of the contract. The contractor is advised that friable and/or non-friable asbestos-containing material may be encountered in project areas. Friable asbestos-containing material is any material that contains more than one percent asbestos by weight, and that hand pressure can crumble, pulverize or reduce to powder when dry. Non-friable asbestos containing materials are materials in which asbestos fibers are bound by a matrix material, saturation, impregnation or coating.

Non-friable asbestos-containing materials do not normally release airborne asbestos fiber during routine handling and end-use. However, excessive fiber concentrations may be produced during uncontrolled abrading, sanding, drilling, cutting, machining, removal, demolition, or other similar activities. 29 CFR 1910.1001 shall be referenced in the event asbestos-containing materials are encountered. Friable asbestos-containing materials are not authorized for use in new construction or maintenance projects.

H.8.0 GREEN PROCUREMENT REQUIREMENTS

In the performance of this construction contract, the Contractor shall make maximum use of products identified on the mandatory environmental purchasing list at the following links, as applicable:

U.S. EPA Comprehensive Procurement Guidelines published at www.epa.gov/cpg/products.htm.

USDA Biobased product listings published at www.biopreferred.gov.

Energy Star® product listings published at www.energystar.gov/products.

FEMP Low Standby Power product listings published at http://energy.gov/eere/femp/covered-product-categories

Contractor shall comply with all reporting requirements of the following clauses when applicable (See Clause and Provision sections):

52.223-1 Biobased Product Certification

52.223-2 Affirmative Procurement of Biobased Products under Service and Construction Contracts

52.223-4 Recovered Material Certification

52.223-9 Estimate of Percentage of Recovered Material Content for EPA Designated Items

52.223-15 Energy Efficiency in Energy Consuming Products

52.223-17 Affirmative Procurement of EPA Designated Items in Service and Construction Contracts

H.9.0 UNAUTHORIZED PERSONNEL

http://www.epa.gov/cpg/products.htm http://www.bioprefferd.gov/ http://www.energystar.gov/products http://energy.gov/eere/femp/covered-product-categories

The contractor shall inform all personnel working under their jurisdiction (including subcontractor and visiting supplier personnel) that access to restricted areas outside of the immediate work area; excluding direct haul and access routes, contracting and Civil Engineering offices and points of supply and storage; is prohibited. Circulation of said personnel will be limited to official business only. Persons in violation of the above will be apprehended and appropriately disciplined.

H.10.0 DAVIS-BACON WAGE RATES APPLICABLE TO TRUCK DRIVERS

29 CFR 5.2(j) limits coverage of construction contractor or subcontractor employees performing as truck drivers under the Davis-Bacon Act (FAR 52.222-6) to only their time spent directly upon the "site of the work" or when hauling between the site of the work and a facility which is dedicated to and located in the proximity of the actual construction location. Other transportation of materials or supplies to or from the site of work by employees of the construction contractor or subcontractor is not “construction” at the site of work and accordingly is not subject to the Davis-Bacon Act.

H.11.0 FIRE DANGER SEASON

If the COR allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR.

(End of Section H)

SECTION I – CONTRACT CLAUSES

Clause Title Date

52.201-1 DEFINITIONS JUN 2020

52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND

REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS

JUN 2020

52.203-18 PROHINITION ON CONTRACTING ENTITIES THAT REQUIRE CERTAIN

INTERNAL CONFIDENTIALTY AGREEMENTS OR STATEMENTS-

REPRESNTATION

JUN 2017

52.204-7 SYSTEM FOR AWARD MANAGEMENT NOV 2024

52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL JAN 2011

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE OCT 2018

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS

DEC 2014

52.204-22 ALTERNATIVE LINE ITEM PROPOSAL JAN 2017

52.204-23 PROHINITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND

SERVICES DEVELOPED BY KASPERSKY LAB AND OTHER COVERED

ENTITIES

NOV 2021

52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND

VIDEO SURVEILLANCE SERVICES OR EQUIPMENT

NOV 2021

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS

AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT

NOV 2021

52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES-

REPRESENTATION

NOV 2021

52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—

REPRESENTATION AND DISCLOSURES.

MAY 2024

52.204.30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—

PROHIBITION.

MAY 2024

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC

CORPORATIONS

NOV 2015

52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX

LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW.

FEB 2016

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK APR 1984

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT

STATUTES OR EXECUTIVE ORDERS – COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES

NOV 2024

52.213-4 TERMS AND CONDITIONS-SIMPLIFIED ACQUISITIONS (OTHER THAN

COMMERCIAL ITEMS)

NOV 2024

52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS. NOV 1999

52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY APR 1991

52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS. MAR 2023

52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE NOV 2020

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION FEB 2024

52.222-3 CONVICT LABOR JUN 2003

52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS AUG 2018

52.222-7 WITHHOLDING OF FUNDS MAY 2014

52.222-8 PAYROLLS AND BASIC RECORDS JUL 2021

52.222-9 APPRENTICES AND TRAINEES JULY 2005

52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS FEB 1988

52.222-11 SUBCONTRACTS (LABOR STANDARDS) MAY 2014

52.222-12 CONTRACT TERMINATION – DEBARMENT MAY 2014

52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND

RELATED REGULATIONS

MAY 2014

52.222-14 DISPUTES CONCERNING LABOR STANDARDS FEB 1988

52.222-15 CERTIFICATION OF ELIGIBILITY MAY 2014

52.222-30 CONSTRUCTION WAGE RATE REQUIREMENTS – PRICE ADJUSTMENT

(NONE OR SEPARATELY SPECIFIED PRICING METHOD

AUG 2018

52.222-31 CONSTRUCTION WAGE RATE REQUIREMENTS – PRICE ADJUSTMENT

(PERCENTAGE METHOD)

AUG 2018

52.222-50 COMBATING TRAFFICKING IN PERSONS OCT 2020

52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY FEB 2021

52.222-99 COMBATING RACE AND SEX STEREOTYPING. [(DEVIATION 20-09)]

52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION. MAY 2011

52.223-6 DRUG-FREE WORKPLACE MAY 2001

52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE

AND CONSTRUCTION CONTRACTS

AUG 2018

52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING

WHILE DRIVING

JUN 2020

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES FEB 2021

52.225-25 PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN

CERTAIN ACTIVITIES OR TRANSACTIONS RELATING TO IRANIAN

REPRESENTATION AND CERTIFICATIONS

JUN 2020

52.227-4 PATENT INDEMNITY-CONSTRUCTION CONTRACTS DEC 2007

52.227-17 RIGHTS IN DATA—SPECIAL WORKS DEC 2007

52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS MAY 2014

52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS JAN 2017

52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS JUN 2013

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS

SUBCONTRACTORS

MAR 2023

52.233-3 PROTEST AFTER AWARD. AUG 1996

52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM. OCT 2004

52.236-2 DIFFERING SITE CONDITIONS APR 1984

52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK APR 1984

52.236-5 MATERIAL AND WORKMANSHIP APR 1984

52.236-6 SUPERINTENDENCE BY THE CONTRACTOR APR 1984

52.236-7 PERMITS AND RESPONSIBILITIES NOV 1991

52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND IMPROVEMENTS

APR 1984

52.236-11 USE AND POSSESSION PRIOR TO COMPLETION APR 1984

52.236-12 CLEANING UP APR 1984

52.236-13 ACCIDENT PREVENTION NOV 1991

52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES APR 1984

52.236-16 QUANTITY SURVEYS APR 1984

52.236-17 LAYOUT OF WORK APR 1984

52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION FEB 1997

52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION – ALTERNATE I APR 1984

52.236-26 PRECONSTRUCTION CONFERENCE FEB 1995

52.236-27 SITE VISIT (CONSTRUCTION). FEB 1995

52.236-28 PREPARATION OF PROPOSALS-CONSTRUCTION. OCT 1997

52.240-1 PROHIBITION ON UNMANNED AIRCRAFT SYSTEMS MANUFACTURED

OR ASSEMBLED BY AMERICAN SECURITY DRONE ACT-COVERED

FOREIGN ENTITIES

NOV 2024

52.242-14 SUSPENSION OF WORK. APR 1984

52.243-5 CHANGES AND CHANGED CONDITIONS APR 1984

52.245-1 GOVERNMENT PROPERTY. SEP 1991

52.245-9 USE AND CHARGES APR 2012

52.246-21 WARRANTY OF CONSTRUCTION MAR 1994

52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) . APR 1984

52.252-2 CLAUSES INCORPORATED BY REFERENCE. FEB 1998

52.253-1 COMPUTER GENERATED FORMS. JAN 1991

1452.204-70 RELEASE OF CLAIMS - DEPARTMENT OF THE INTERIOR JUL 1996

The following clauses are provided in full text:

52.213-4 – TERMS AND CONDITIONS – SIMPLIFIED ACQUISITIONS (OTHER THAN COMMERCIAL PRODUCTS

AND COMMERCIAL SERVICES (FEB 2024)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN

2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-

235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(ii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by

Kaspersky Lab Covered Entities (DEC 2023) (Section 1634 of Pub. L. 115-91).

(iii) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or

Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(iv) 52.204-27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L.

117-328), unless the agency grants an exception - see paragraph (b) of 52.204-27.

(v) 52.204–30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (DEC 2023) (Pub. L. 115–

390, title II).

(vi) 52.222-3, Convict Labor (JUN 2003) (E.O.11755).

(vii) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

(viii) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).

https://www.acquisition.gov/far/52.203-19#FAR_52_203_19 https://www.acquisition.gov/far/52.204-23#FAR_52_204_23 https://www.acquisition.gov/far/52.204-25#FAR_52_204_25 https://www.acquisition.gov/far/52.204-27#FAR_52_204_27 https://www.acquisition.gov/far/52.204-30#FAR_52_204_30 https://www.acquisition.gov/far/52.222-3#FAR_52_222_3 https://www.acquisition.gov/far/52.222-21#FAR_52_222_21 https://www.acquisition.gov/far/52.222-26#FAR_52_222_26

(ix) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

(x) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) ( 31 U.S.C.

3903 and 10 U.S.C. 3801).

(xi) 52.233-3, Protest After Award (AUG 1996) ( 31 U.S.C.3553).

(xii) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) ( Pub. L. 108-77 and 108-78 ( 19 U.S.C.

3805 note)).

(2) Listed below are additional clauses that apply:

(i) 52.232-1, Payments (APR 1984).

(ii) 52.232-8, Discounts for Prompt Payment (FEB 2002).

(iii) 52.232-11, Extras (APR 1984).

(iv) 52.232-25, Prompt Payment (JAN 2017).

(v) 52.232-39, Unenforceability of Unauthorized Obligations (JUN 2013).

(vi) 52.233-1, Disputes (MAY 2014).

(vii) 52.244-6, Subcontracts for Commercial Products and Commercial Services (DEC 2023).

(viii) 52.253-1, Computer Generated Forms (JAN 1991).

(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:

(1) The clauses listed below implement provisions of law or Executive order:

(i) 52.203-17, Contractor Employee Whistleblower Rights (NOV 2023) ( 41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

(ii) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020)(Pub. L. 109-

282) ( 31 U.S.C. 6101 note) (Applies to contracts valued at or above the threshold specified in FAR 4.1403(a) on the date of award of this contract).

(iii) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (FEB 2024) (E.O. 13126) (Applies to contracts for supplies exceeding the micro-purchase threshold, as defined in 2.101 on the date of award of this contract).

(iv) 52.222-20, Contracts for Materials, Supplies, Articles, and Equipment., Contracts for Materials, Supplies, Articles, and Equipment (JUN 2020) ( 41 U.S.C.chapter 65) (Applies to supply contracts over the threshold specified in FAR

22.602 on the date of award of this contract, in the United States, Puerto Rico, or the U.S. Virgin Islands).

(v) 52.222-35, Equal Opportunity for Veterans (JUN 2020) ( 38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).

(vi) 52.222-36, Equal Employment for Workers with Disabilities (JUN 2020) ( 29 U.S.C. 793) (Applies to contracts over the threshold specified in FAR 22.1408(a) on the date of award of this contract, unless the work is to be performed outside the United States by employees recruited outside the United States). (For purposes of this clause, "United States" includes https://www.acquisition.gov/far/52.225-13#FAR_52_225_13 https://www.acquisition.gov/far/52.232-40#FAR_52_232_40 https://www.govinfo.gov/link/uscode/31/3903 https://www.govinfo.gov/link/uscode/31/3903 https://www.govinfo.gov/link/uscode/10/3801 https://www.acquisition.gov/far/52.233-3#FAR_52_233_3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.233-4#FAR_52_233_4 https://www.govinfo.gov/link/plaw/108/public/77 https://www.govinfo.gov/link/uscode/19/3805 https://www.govinfo.gov/link/uscode/19/3805 https://www.acquisition.gov/far/52.232-1#FAR_52_232_1 https://www.acquisition.gov/far/52.232-8#FAR_52_232_8 https://www.acquisition.gov/far/52.232-11#FAR_52_232_11 https://www.acquisition.gov/far/52.232-25#FAR_52_232_25 https://www.acquisition.gov/far/52.232-39#FAR_52_232_39 https://www.acquisition.gov/far/52.233-1#FAR_52_233_1 https://www.acquisition.gov/far/52.244-6#FAR_52_244_6 https://www.acquisition.gov/far/52.253-1#FAR_52_253_1 https://www.acquisition.gov/far/52.203-17#FAR_52_203_17 https://www.govinfo.gov/link/uscode/41/4712 https://www.acquisition.gov/far/3.900#FAR_3_900 https://www.acquisition.gov/far/52.204-10#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/4.1403#FAR_4_1403 https://www.acquisition.gov/far/52.222-19#FAR_52_222_19 https://www.acquisition.gov/far/2.101#FAR_2_101 https://www.acquisition.gov/far/52.222-20#FAR_52_222_20 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/22.1303#FAR_22_1303 https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/22.1408#FAR_22_1408 the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin

Islands, and Wake Island.)

(vii) 52.222-37, Employment Reports on Veterans (JUN 2020) ( 38 U.S.C. 4212) (Applies to contracts valued at or above the threshold specified in FAR 22.1303(a) on the date of award of this contract).

(viii) 52.222-41, Service Contract Labor Standards (AUG 2018) ( 41 U.S.C. chapter 67) (Applies to service contracts over $2,500 that are subject to the Service Contract Labor Standards statute and will be performed in the United States, District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston

Island, Wake Island, or the outer Continental Shelf).

(ix) (A) 52.222-50, Combating Trafficking in Persons (NOV 2021) ( 22 U.S.C. chapter 78 and E.O. 13627)

(Applies to all solicitations and contracts).

(B) Alternate I (MAR 2015) (Applies if the Contracting Officer has filled in the following information with regard to applicable directives or notices: Document title(s), source for obtaining document(s), and contract performance location outside the United States to which the document applies).

(x) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States, the

District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, and the outer Continental Shelf as defined in the Outer Continental Shelf Lands Act (43 U.S.C. 1331, et seq.))).

(xi) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 13706) (Applies when 52.222-

6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of

Columbia.))

(xii) 52.223-5, Pollution Prevention and Right-to-Know Information (MAY 2011) (E.O. 13423) (Applies to services performed on Federal facilities).

(xiii) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN

2016) (E.O. 13693)(applies to contracts for products as prescribed at FAR 23.804(a)(1)).

(xiv) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN

2016) (E.O. 13693) (Applies to maintenance, service, repair, or disposal of refrigeration equipment and air conditioners).

(xv) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) ( 42 U.S.C. 8259b) (Unless exempt pursuant to 23.204, applies to contracts when energy-consuming products listed in the ENERGY STAR® Program or

Federal Energy Management Program (FEMP)) will be-

(A) Delivered;

(B) Acquired by the Contractor for use in performing services at a Federally-controlled facility;

(C) Furnished by the Contractor for use by the Government; or

(D) Specified in the design of a building or work, or incorporated during its construction, renovation, or maintenance).

(xvi) 52.223-20, Aerosols (JUN 2016) (E.O. 13693) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons as a propellant or as a solvent; or contracts for maintenance or repair of electronic or mechanical devices).

https://www.acquisition.gov/far/52.222-37#FAR_52_222_37 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/22.1303#FAR_22_1303 https://www.acquisition.gov/far/52.222-41#FAR_52_222_41 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-chapter67-front&num=0&edition=prelim https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.222-55#FAR_52_222_55 https://www.acquisition.gov/far/52.222-6#FAR_52_222_6 https://www.acquisition.gov/far/52.222-41#FAR_52_222_41 https://www.acquisition.gov/far/52.222-62#FAR_52_222_62 https://www.acquisition.gov/far/52.222-6#FAR_52_222_6 https://www.acquisition.gov/far/52.222-6#FAR_52_222_6 https://www.acquisition.gov/far/52.222-41#FAR_52_222_41 https://www.acquisition.gov/far/52.223-5#FAR_52_223_5 https://www.acquisition.gov/far/52.223-11#FAR_52_223_11 https://www.acquisition.gov/far/23.804#FAR_23_804 https://www.acquisition.gov/far/52.223-12#FAR_52_223_12 https://www.acquisition.gov/far/52.223-15#FAR_52_223_15 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/23.204#FAR_23_204 https://www.acquisition.gov/far/52.223-20#FAR_52_223_20

(xvii) 52.223-21, Foams (JUN 2016) (E.O. 13693) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons as a foam blowing agent; or contracts for construction of buildings or facilities.

(xviii) (A) 52.225-1, Buy American-Supplies (OCT 2022) ( 41 U.S.C. chapter 67) (Applies to contracts for supplies, and to contracts for services involving the furnishing of supplies, for use in the United States or its outlying areas, if the value of the supply contract or supply portion of a service contract exceeds the micro-purchase threshold, as defined in 2.101 on the date of award of this contract, and the acquisition-

(1) Is set aside for small business concerns; or

(2) Cannot be set aside for small business concerns (see 19.502-2), and does not exceed $50,000).

(B) Alternate I (OCT 2022) (Applies if the Contracting Officer has filled in the domestic content threshold below, which will apply to the entire contract period of performance. Substitute the following sentence for the first sentence of paragraph (1)(ii)(A) of the definition of domestic end product in paragraph (a) of 52.225-1: (A) The cost of its components mined, produced, or manufactured in the United States exceeds ____ percent of the cost of all its components.

[ Contracting officer to insert the percentage per instructions at 13.302-5(d)(4). ])

(xix) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations., Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) ( 42 U.S.C. 1792) (Applies to contracts greater than the threshold specified in FAR 26.404 on the date of award of this contract, that provide for the provision, the service, or the sale of food in the United

States).

(xx) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (OCT 2013)(Applies when the payment will be made by electronic funds transfer (EFT) and the payment office uses the System for Award Management

(SAM) as its source of EFT information).

(xxi) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management (JUL

2013) (Applies when the payment will be made by EFT and the payment office does not use the SAM database as its source of

EFT information).

(xxii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV 2021) ( 46 U.S.C.

55305)(Applies to supplies transported by ocean vessels (except for the types of subcontracts listed at 47.504(d)).

(2) Listed below are additional clauses that may apply:

(i) 52.204-21, Basic Safeguarding of Covered Contractor Information Systems (NOV 2021) (Applies to contracts when the contractor or a subcontractor at any tier may have Federal contract information residing in or transiting through its information system.)

(ii) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (NOV 2021) (Applies to contracts over the threshold specified in FAR 9.405-2(b) on the date of award of this contract).

(iii) 52.211-17, Delivery of Excess Quantities (Sept 1989) (Applies to fixed-price supplies).

(iv) 52.247-29, F.o.b. Origin (FEB 2006) (Applies to supplies if delivery is f.o.b. origin).

(v) 52.247-34, F.o.b. Destination (NOV 1991) (Applies to supplies if delivery is f.o.b. destination).

(c) FAR 52.252-2, Clauses Incorporated by Reference (Feb 1998). This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/far/52.223-21#FAR_52_223_21 https://www.acquisition.gov/far/52.225-1#FAR_52_225_1 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/2.101#FAR_2_101 https://www.acquisition.gov/far/19.502-2#FAR_19_502_2 https://www.acquisition.gov/far/52.225-1#FAR_52_225_1 https://www.acquisition.gov/far/13.302-5#FAR_13_302_5…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .