Statement of Work Summary: Pocosin Lakes Field Station Roof Repair
This Statement of Work outlines localized roof repair requirements for the Pocosin Lakes National Wildlife Refuge Field Station located at 3157 Shore Drive, Creswell, NC 27928-9259. The project addresses active roof leaks resulting from defective installation practices, including low nail count, improper valley cuts, missing drip edge, and improperly installed flashing. The contractor must complete all work within 45 calendar days following issuance of the Notice to Proceed during normal business hours (Monday through Friday, 8:00 a.m. to 4:30 p.m.). The scope of work includes removal and replacement of damaged soffit siding, rework or replacement of improperly installed flashing at the chimney and apron areas, installation of a properly constructed chimney cricket/saddle integrated with the existing roof system, necessary framing and carpentry, and removal of debris and hauling. Replacement shingles must be new asphalt composition shingles compatible with and matching the existing roofing system as closely as reasonably practicable. All underlayment, flashing, fasteners, and sealants must be new, suitable for their intended application, and installed per manufacturer requirements and applicable building codes.
The contractor must coordinate with the refuge manager for access and work scheduling and minimize disruption to on-site operations. The contractor is responsible for protecting the building, occupants, landscaping, and existing roof from damage, providing temporary weather protection, and restoring disturbed areas. Prior to final inspection, the contractor must submit a written summary of repairs performed to the Contracting Officer Representative. Final acceptance is contingent upon stopping all identified roof leaks, proper installation and integration of repair components, satisfactory cleanup of the premises, and completion of magnetic nail sweeps for loose fasteners. Quality control requirements include adherence to professional roofing industry standards, building code compliance for all flashing work, use of new materials appropriate for roofing applications, and availability of QC documentation upon request. Concealed damage discovered during work requires written authorization from the Contracting Officer before proceeding with additional repairs.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Construction Repair
Pocosin Lakes Field Station Roof Repair 19 August 2026
1. General:
Pocosin Lakes National Wildlife Refuge (205 S. Ludington Drive, Columbia, NC, 27925-9687) is seeking repair of a leaking roof located at the refuge Field Station (3157 Shore Drive, Creswell, NC 27928-9259). The work is intended as a localized repair and does not include complete roof replacement or correction of unrelated deficiencies in the existing roofing system.
Offerors are advised that removal or disturbance of soffit, shingles, flashing, and other components necessary to perform the specified repairs may reveal concealed deterioration or damage to roof sheathing, framing, or other directly associated components that cannot be fully identified prior to commencement of the work. Such conditions are reasonably anticipated as a potential condition that may be encountered in performing the specified repair work. The Contractor shall promptly notify the Contracting Officer in writing of any such conditions and shall not perform additional work beyond the awarded requirements without prior written authorization from the Contracting Officer. If the Government determines that repair or replacement of concealed damaged components is necessary to complete the specified roof repairs, any authorized change to the contract, including an adjustment to and increase in price and/or performance period as appropriate, will be accomplished by written contract modification with the Contracting Officer.
The existing roof has active leaks resulting from defective installation practices, including low nail count, improper valley cuts, missing drip edge, and improperly installed flashing. These issues have created ongoing water intrusion risks. The purpose of this project is to address the immediate leak points to stop water intrusion and prevent structural damage.
Contractor shall be experienced in roofing repair, capable of performing carpentry, flashing installation, and chimney construction per building code requirements. Experience in correcting improperly installed shingle systems preferred.
Repairs shall comply with applicable local building codes.
2. Place of Performance and Period of Performance (Where and When) the project is being completed.
Work is to be completed at 3157 Shore Drive, Creswell, NC 27928-9259.
Contractor shall complete work within 45 calendar days after issuance of the Notice to Proceed.
Normal duty hours Monday thru Friday 8:00 a.m. - 4:30 p.m. In the event of emergencies, Contractor shall provide contact information.
Non-duty hours include week nights, weekends, and Government holidays as prescribed by OPM
(New Year’s Day, Martin Luther King JR.s’s Birthday, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day, etc.).
3. Scope
The Contractor shall perform all labor and provide all materials necessary to complete the described repair. Contractor shall coordinate with refuge manager in advance of beginning work to obtain access and schedule work. Any on-site staging of equipment or materials shall be approved by refuge manager; on-site staging may not be permissible. Where possible, contractor shall work to minimize disruption to on-site operations and field station tenants. Contractor shall follow all local, state, and federal requirements for operations and building code requirements.
The Contractor shall protect the building, occupants, landscaping, and existing roof from damage resulting from the work; provide temporary weather protection whenever the building envelope is opened or exposed to adverse weather conditions; and restore areas disturbed by the repair to their pre-work condition.
The Contractor shall perform all labor and provide all materials necessary to complete the described repair. Work activities include, but are not limited to:
• Removal and replacement of soffit siding damaged by water intrusion or necessary to remove to access and complete the specified roof, flashing, chimney cricket, framing, and related repairs..
• Remove, rework, or replace, as necessary, improperly installed flashing at the chimney, apron areas, and identified leak points, and properly integrate repaired or replacement flashing with the existing roofing system.
• Installation of a properly constructed cricket/saddle behind the chimney that is integrated with the existing roof system.
• Perform necessary framing and rough carpentry to support repairs.
• Perform incidental work reasonably necessary to complete the specified repairs and stop the identified immediate leak(s), excluding repair or replacement of concealed damaged components requiring Contracting Officer authorization under Section 1 Removal of debris and hauling.
Replacement shingles shall be new asphalt composition shingles of a type and quality compatible with the existing roofing system. Replacement shingles shall be suitable for the existing roof application and installed in accordance with the shingle manufacturer's written installation instructions and applicable building code requirements.
Replacement shingles shall match the existing shingles as closely as reasonably practicable in type, profile, size, color, and appearance. Exact color matching is not required where differences result from age, weathering, fading, or product availability. Conrtactor is responsible for cooridating with the COR for approval on material selection before purchasing and use.
All underlayment, flashing, fasteners, sealants, and other roofing materials used in the repairs shall be new, suitable for their intended application, compatible with the existing roofing system and adjoining materials, and installed in accordance with applicable manufacturer requirements.
4. Deliverables
Final written summary of repairs performed provided to the Contracting Officer Representative by email at least two business days before final inspection and acceptance.
5. Site Cleanup and Nail Removal
The Contractor shall maintain the work area in a clean, orderly, and safe condition throughout performance. Construction debris, removed roofing materials, fasteners, packaging, and other waste generated by the work shall be collected and removed from the premises.
Upon completion of the work, the Contractor shall perform a thorough final cleanup of all areas affected by the work, including the building perimeter, walkways, driveways, landscaped areas, and other areas where roofing debris or fasteners may have fallen. The Contractor shall use a magnetic nail sweeper, or equivalent magnetic collection device, to collect loose nails, screws, and other ferrous metal fasteners from accessible ground surfaces surrounding the work area.
All construction debris and waste generated by the work shall be removed from Government property and properly disposed of in accordance with applicable requirements. The premises shall be left in a clean and safe condition satisfactory to the Government.
6. Inspectionand Acceptance
Upon completion, the Government will inspect the work for compliance with this SOW. The completed repairs shall stop the identified immediate roof leak(s) and associated water intrusion at the repaired locations. Acceptance is contingent upon correction of the identified active leak points and proper installation and integration of the chimney cricket/saddle, flashing, soffit siding, and associated repairs with the existing roofing system.
At the Government's discretion, verification that the repairs have stopped the identified leak(s) may include visual inspection, a controlled water test of the repaired areas, observation following rainfall, or a combination of these methods.
Any deficiencies identified during inspection or verification, including continued water intrusion at the repaired locations, shall be corrected by the Contractor prior to Government acceptance.
Final acceptance is also contingent upon satisfactory cleanup of the premises, removal of construction debris, and completion of the required magnetic sweep for loose nails and metal fasteners.
7. Quality Control/Quality Assurance:
• Work shall meet professional roofing industry standards.
• All flashing work must meet building code standards and manufacturer requirements.
• Contractor shall ensure all materials used are new and appropriate for roofing applications.
• QC documentation shall be made available upon request.
| 1. General: |
| 2. Place of Performance and Period of Performance (Where and When) the project is being completed. |
| Work is to be completed at 3157 Shore Drive, Creswell, NC 27928-9259. |
| Contractor shall complete work within 45 calendar days after issuance of the Notice to Proceed. |
| Normal duty hours Monday thru Friday 8:00 a.m. - 4:30 p.m. In the event of emergencies, Contractor shall provide contact information. |
| Non-duty hours include week nights, weekends, and Government holidays as prescribed by OPM (New Year’s Day, Martin Luther King JR.s’s Birthday, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Chris... |
| 3. Scope |
| 4. Deliverables |