Sol_140F0620R0025_Amd_0002.pdf
PDF 190 KB Posted
- Attached to
- CO-SAN LUIS VALLEY COMPLEX HQ OFC BLDG Federal contract opportunity
- Solicitation number
- 140F0620R0025
About this file
This document is an amendment to a solicitation for the construction of the San Luis Valley Complex HQ and Visitor Center building in Alamosa, Colorado. The amendment provides responses to contractor questions, extends the proposal due date to August 27, 2020 at 1900 hours, and lists firms that have expressed interest in the project. Key details include: construction of a 4,221 square foot facility to serve as the new headquarters for the Alamosa National Wildlife Refuge; a scope of work that encompasses parking lots, sidewalks, an access road, a water well system, propane and garbage enclosures, a septic system, and exterior electrical; a magnitude between $1-5 million; and designation as a total small business set-aside with the Fish and Wildlife Service as the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch 9 FWS San Luis-Alamosa Welcome Center-HQ - Geotechnical Report_0002.pdf | ||
| Sol_140F0620R0025_Amd_0001.pdf | ||
| Atch 1 San Luis-Alamosa HQ Specifications.pdf | ||
| Atch 2 San Luis-Alamosa HQ Plans.pdf | ||
| Atch 5 san Luis-Alamosa HQ Submittal Schedule.pdf | ||
| Atch 4 San Luis-Alamosa HQ Finish Board.pdf | ||
| Atch 8 San Luis Valley HQ Complex Bid Schedule.xlsx | XLSX spreadsheet | |
| Atch 7 San Luis Valley Alamosa HQ Past Perf Quest.doc | DOC document | |
| Sol_140F0620R0025.pdf | ||
| Atch 3 San Luis-Alamosa HQ REV 1 Replacement Pages Plans.pdf | ||
| Atch 6 San Luis Valley Alamosa HQ DBA Wage Det.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140F0620R0025 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
F06
Lakewood CO 80228-1807
134 UNION BOULEVARD
LAKE PLAZA NORTH
FWS, DIVISION OF CONTRACTING AND GE
19-01708/14/20200002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/17/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See Pages 2-5
Legacy Doc #: FWS
Period of Performance: 09/07/2020 to 09/06/2021
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Timothy Officer
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Solicitation Amendment
Document 140F0620R0025-0002
Document Title
CONSTRUCT SAN LUIS VALLEY HQ & VISITORS CENTER
COMLEX ALAMOSA CO
A. The purpose of this amendment is to respond to contractor questions, provide the geotech report, extend the proposal due date and provide a list of interested vendors.
B. The following is provided in response to contractor questions:
CONTRACTOR: 1) What is the deadline to submit pre-bid questions to you?
GOVERNMENT RESPONSE: There is no formal cutoff date for questions, however the end of the fiscal year is approaching and will limit our ability to extend the proposal due date to respond to questions.
CONTRACTOR: 2) Signs A4, are those panel signs also?
GOVERNMENT RESPONSE: They are a ¼” thick acrylic panel.
CONTRACTOR: 3) Is there a signage schedule for all signs?
GOVERNMENT RESPONSE: Sign Type A1 – 2; Sign Type A2 – 2; Sign Type A3 – 3; Sign Type A4 (C1F) – 3.
CONTRACTOR: 4) Can the schedule be excluded from the page count? Since the period of performance is 365 days, a detailed schedule will take multiple pages.
GOVERNMENT RESPONSE: Yes. The Schedule cited on page 36 of 42, Technical Proposal paragraph “2. Proposed Construction Progress Schedule, will not count against the overall page count.
CONTRACTOR: 5) According to Technical Proposal, 3.e, we are to provide resumes for our key personnel and subcontractors’ key personnel. This can take upward of 10 pages. Since we are limited to 40 pages, can resumes be excluded from the page count?
GOVERNMENT RESPONSE: Yes. The resumes will not count against the overall page count.
CONTRACTOR: 6) According to Technical Proposal 3.b, we are to provide a list of similar projects completed within the last 5 years. However, 3.d asks us to identify similar past or current contracts. Since 3.d asks for past or current contracts, can we include current projects in 3.b?
GOVERNMENT RESPONSE: Yes.
CONTRACTOR: 7) Technical Proposal 1.c asks us to provide an explanation of major subcontractors’ roles. Technical Proposal 3.c asks us to provide this same information again.
Since we are limited to 40 pages, where does the government want us to provide this information: 1.c or 3.c?
GOVERNMENT RESPONSE: Though the requirements are similar; they are different. Address each area and if needed refer to another paragraph of your offer.
Document 140F0620R0025-0002
Document Title
CONSTRUCT SAN LUIS VALLEY HQ & VISITORS CENTER
COMLEX ALAMOSA CO
CONTRACTOR: 8) Per page C301, please provide the topographical survey performed by DOWL in October 2019.
GOVERNMENT RESPONSE: The survey is available and attached to this amendment. The topographical survey is shown in the background of the Civil plan sheets. The selected contractor may request a CAD file of the topographical survey after selection; however, the contractor may not rely on the information provided in the CAD file and must rely on the sealed Project Plans.
CONTRACTOR: 9) Please confirm that no wet or dry type fire suppression system is required for this building.
GOVERNMENT RESPONSE: Fire suppression systems are not in the scope of work.
CONTRACTOR: 10) On sheet A104 the soffit shows T&T for the porch, nothing is shown for the soffits. Also see detail 3 A402. Detail 2 shows ½” plywood soffit and 1x8 T&G.
GOVERNMENT RESPONSE: All soffits shall be 1” x 8” wood tongue and groove.
CONTRACTOR: 11) The mechanical plans show a complete HVAC system and is also calling for radiant floor heating. Is it the intent to have a duel heating system?
GOVERNMENT RESPONSE: Yes, the building will have a dual heating system.
CONTRACTOR: 12) The outside of the trash enclosure is stucco. The inside finish is not specified. What is the finish on the inside of the trash enclosure?
GOVERNMENT RESPONSE: The inside finish shall be the same as the outside finish, both being stucco.
CONTRACTOR: 13) Paint Bollards correct?
GOVERNMENT RESPONSE: The bollards shall be painted yellow as specified in note 24 on sheet C201. This applies to bollards inside and outside of the propane and trash enclosures.
CONTRACTOR: 14) Can this bid form be simplified? As it is it has us breaking the bid down into two different breakdowns. Can this be done with the successful bidder only?
GOVERNMENT RESPONSE: No. We appreciate the effort offerors go to in providing this level of detail, however the division breakout will facilitate our evaluation process and the accounting breakout will aid in our subsequent award process.
Document 140F0620R0025-0002
Document Title
CONSTRUCT SAN LUIS VALLEY HQ & VISITORS CENTER
COMLEX ALAMOSA CO
CONTRACTOR: 15) What is the exterior wall top plate elevation on common exterior walls? I see the Well Building is +9.0’. What is wall height for the H.Q. / Office Building?
GOVERNMENT RESPONSE: The wall top plate elevation is +9.0’.
CONTRACTOR: 16) Please specify SIPS Wall hold down anchor type, part model no. if Simpson type or other manufacturer, + anchor locations. Then we can provide them based on your lateral load design requirements.
GOVERNMENT RESPONSE: Per specification section 06 1200 1.4-B, the SIP panel supplier shall submit calculations and shop drawings detailing the connections and hardware used for the lateral resisting system. The design shear loads and chord forces transferred into the SIP panels from the roof diaphragm are summarized on the Roof Framing Plan, drawing S202.
CONTRACTOR: 17) We are not FSC certified. Is non-FSC framing members manufactured internally in our SIPS acceptable? FYI, There is no FSC Certified OSB wood sheathing manufacturers in the industry.
GOVERNMENT RESPONSE: The FSC certification provides confirmation that the conditions of the ‘Buy America Act’, applicable to this project, are satisfied. The intent of the ‘Buy America Act’ is to demonstrate full chain of custody for the SIP panel project materials. If non-FSC framing members are supplied the source of material, from forest to supplier, must be included with the submittal for review by the owner and design team. If all material, processes and suppliers involved in the product delivery are responsibly sourced in the United States a variance from the FSC certification requirement will most likely be approved.
CONTRACTOR: 18) Regarding the Total Small Business Set Aside requirement for this project – Do all Subcontractors need to be below the $39.5 Million threshold?
GOVERNMENT RESPONSE: No. The successful awardee must be a small business as cited in the Federal Acquisition Regulation (FAR) provisions FAR Part 19.1, Size Standards, 52.219-6 Notice of Total Small Business Set-Aside and underlying CFR, and comply with the FAR provision cited on page 19, 52.219-14 Limitations on Subcontracting; see paragraph c (3); "...(3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees..."
CONTRACTOR: 19) Will the Government preapprove materials and equipment?
GOVERNMENT RESPONSE: No. We don't preapprove material or equipment submittals during the solicitation phase. It is the successful contractors responsibility to comply with the specifications and drawings. If the successful, awarded contractor wants to offer an equal product, they may do so through the material submittal phase, after contract award. Based on a review of available data the following is added to the specifications:
Document 140F0620R0025-0002
Document Title
CONSTRUCT SAN LUIS VALLEY HQ & VISITORS CENTER
COMLEX ALAMOSA CO
1. MECHANICAL EQUIPMENT SUBSTITUTION APPROVALS: Prior approvals for equipment substitutions are based upon manufacturer’s name only. No material submissions have been reviewed. Any substitutions shall meet the specification for the product specified. Any costs associated with electrical modifications necessary due to a product substitution shall be the responsibility of the mechanical contractor.
a. Specification 238316 Radiant-Heating Hydronic Piping: Legend Hydronics PEX Piping, Radiant insulation panels, brass and stainless steel manifolds, hydraulic separators.
C. The following firms and individuals have shown interest in the project:
Firm POC Phone Pole-Tech Co., Inc. Cyrena Barbarite 800-633-6733 Alcon Construction Co Brian Cook 719-589-4084 Dormakaba USA Inc Cindy Code 303.704.2293
Roxy Stewart 720.448.6773 Henry Company Jeffrey Alley 970-786-6748 E-Corp Russ Tonks 702-533-6120 Enercept Larry McCoy 605.882.2222 RMS Utilities Neff Malouff 719-589-4263 PRT Builders Nephi Jeffs 435-218-9682 Shamrock Sales Inc. Kenji V. Thomas 303-399-9181 x5490 Rize Construction Ryan Messmore (720)436-6762 Wood Brothers Water Quality Treatment “
Tyler Cruthers 800-383-1236 402-476-1236
HPM Contracting Ray Hallquist 720-575-9896
D. The response due date and time is extended to Thursday, 27 Aug 2020 at 1900 hours local mountain time. Please provide acknowledgement of this amendment.
E. All other terms and conditions remain unchanged.