Sol_140F0219R0019_Amd_0001.pdf

PDF 89 KB Posted

Attached to
ARANSAS HURRICANE VC AND DEMO Design Build Federal contract opportunity
Solicitation number
140F0219R0019
Issued by
Department of the Interior Fish and Wildlife Service Region 9 Headquarters

About this file

140F0219R0019

View the file

Other files for this federal contract opportunity

Other files attached to ARANSAS HURRICANE VC AND DEMO Design Build, newest first.
File Type Posted
1.9.4_Bubble_Diagrams.pdf PDF
Attachment_3_,_Prime_Contractor_Past_Performance_Survey.doc DOC document
1.9.7_Standard_Floor_Plan.pdf PDF
Attachment_6,_Bidschedule.xlsx XLSX spreadsheet
Attachment_2,_ARANSAS_Demo_SOW.pdf PDF
1.9.1_Original_Plot_Plan.pdf PDF
1.9.14_Tower_Scope.pdf PDF
1.9.5_Campus_redevelopment_plan.pdf PDF
1.9.9_FEMA_Map_48007C0100G_.pdf PDF
1.9.15_Demolition_Map.pdf PDF
Attachment_3_,_Prime_Contractor_Past_Performance_Survey.doc DOC document
Attachment_5,_Davis_Bacon_Wage_Determination.pdf PDF
1.9.13_PACS_DESIGN_GUIDELINES.pdf PDF
Attachment_2,_ARANSAS_Demo_SOW.pdf PDF
Sol_140F0219R0019.pdf PDF
Attachment_2,_ARANSAS_Demo_SOW.pdf PDF
1.9.10_Archeological_information.pdf PDF
Attachment_4_,_Design_Contractor__Past_Performance_Survey.doc DOC document
1.9.1_Original_Plot_Plan.pdf PDF
1.9.8_Interpretive_Plan.pdf PDF
1.9.4_Bubble_Diagrams.pdf PDF
Attachment_3_,_Prime_Contractor_Past_Performance_Survey.doc DOC document
1.9.15_Demolition_Map.pdf PDF
Attachment_1,_ARANSAS_Construction__SOW.pdf PDF
Attachment_4_,_Design_Contractor__Past_Performance_Survey.doc DOC document
Sol_140F0219R0019.pdf PDF
1.9.3_Architectural_Program.pdf PDF
Attachment_3_,_Prime_Contractor_Past_Performance_Survey.doc DOC document
1.9.4_Bubble_Diagrams.pdf PDF
1.9.15_Demolition_Map.pdf PDF
Attachment_6,_Bidschedule.xlsx XLSX spreadsheet
1.9.4_Bubble_Diagrams.pdf PDF
Sol_140F0219R0019.pdf PDF
1.9.1_Original_Plot_Plan.pdf PDF
1.9.10_Archeological_information.pdf PDF
1.9.2_Geotech_Report.pdf PDF
1.9.7_Standard_Floor_Plan.pdf PDF
Attachment_3_,_Prime_Contractor_Past_Performance_Survey.doc DOC document
1.9.12_IDS_DESIGN_GUIDELINES.pdf PDF
Attachment_4_,_Design_Contractor__Past_Performance_Survey.doc DOC document
Attachment_4_,_Design_Contractor__Past_Performance_Survey.doc DOC document
Attachment_5,_Davis_Bacon_Wage_Determination.pdf PDF
1.9.8_Interpretive_Plan.pdf PDF
Attachment_6,_Bidschedule.xlsx XLSX spreadsheet
1.9.1_Original_Plot_Plan.pdf PDF
Sol_140F0219R0019.pdf PDF
1.9.7_Standard_Floor_Plan.pdf PDF
Attachment_3_,_Prime_Contractor_Past_Performance_Survey.doc DOC document
1.9.14_Tower_Scope.pdf PDF
1.9.4_Bubble_Diagrams.pdf PDF
Show all 50

ARANSAS HURRICANE VC AND DEMO Design Build has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140F0219R0019 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

F02

ALBUQUERQUE NM 87102-3118

500 GOLD AVENUE SW

DIVISION OF CONTRACT & GS

F02

ALBUQUERQUE NM 87102-3118

500 GOLD AVENUE SW

P.O. BOX 1306

FWS, DIVISION OF CONTRACTING AND GE

06/25/20190001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/25/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Design and Construction of an Administration/Visitor Center Building and Associated

Maintenance and Volunteer Buildings for Aransas National Wildlife Refuge in Austwell, TX.

The purpose of this amendment to solicitation 140F0219R0019 is as follows:

Respond to Phase I RFIs. We received three RFIs for Phase I - see below. The due date for

Phase I remain Monday July 22, 2019.

Phase I Response to RFIs

1.Question: In Section M. Evaluation Factors, Part C. Evaluation Approach, FACTOR 1, prime

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Rey F. Aragon

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140F0219R0019/0001 contractor project relevance is defined as

"similar in scope and price to the work required." Would the government accept as relevant several individual projects that collectively meet the defined relevance criteria as opposed to each project individually meeting all aspects of relevance?

Answer: Yes

2.Question: In Section M - Evaluation Factors for

Award Submission, it states that Prime

Contractors shall have and provide proof of their state license, as a General Contractor, in the

State of Texas. However, the State of Texas does not require a license for General Contractors and neither does the City of Austwell, nor the County of Refugio. Typically, if a project is Federally funded, a state license as a General Contractor is not required. Please confirm Offeror¿s do not need to provide proof of a state license, as a

General Contractor.

Answer: This is an oversight. While State licensing is required for certain types of contractors such as Electricians, Plumbers, HVAC

Contractors, Well drilling Specialists, and

Architects and Engineers; it is not required for

General Contractors. The requirement for the

Prime Contractor to have a state license as a general contractor in the State of Texas has been removed from Factor 1.

3.Question: Please confirm there is not an overall page limitation for the Phase 1 Proposals

Answer: Confirm, there is no page limit for

Phase I Proposals.

Legacy Doc #: FWS

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110