B12 RFI Questions and Answers. Amend 4. Revision Date 7-28-20_0004.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
NV-MOAPA VALLEY NWR D/B NEW STREAM CHANN
Solicitation number
140F0120R0019
Issued by

About this file

This document contains questions and answers related to solicitation number 140F0120R0019 for a new stream channel project at the Moapa Valley National Wildlife Refuge. The Fish and Wildlife Service revised the evaluation criteria to remove the requirement for initial 20% schematic design documents due to concerns about cost and reimbursement. Offerors now have the option to submit initial drawings and specifications at their discretion to assist with establishing phase two pricing, though there is no page limit. If offerors submit designs in phase one but are not selected for phase two, the agency reserves the right to use ideas and concepts from the drawings, which would then become agency property. The deadline for questions was extended to August 10th to match the new phase one submission due date of August 20th.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

RFI Questions and ResponsesYellow Highlighted Cells are Amendment No. 4 Questions and Responses Added.
No.Question and/or NotesResponseDate of Posting
11. L.2.1..1 Technical Capability and L.2.1.2 Past Performance- no questions for clarification.If there are any follow-up questions on this section, please let us know.17-Jul-20
L.2.1.3- Evaluation Factor 3; Technical Approach: States we are to provide 20% Schematic Design Documents. We are looking at an outlay cost for 20% drawings.
220% drawings typically are part of a Design/Build contract- Does the USFWS want 20% drawings at the cost of the contractor without any consideration for the drawings? If I am interpreting Section L correctly, this is a 2 part process requesting substantial initial work on the project itself with no guarantee of being able to actually be called upon to provide a price. Please confirm that is the intent of the solicitation.The USFWS has decided to revise the Evaluation Factor 3. The requirement for Initial 20% Schematic Design Documents is deleted. Refer to Revised Section L and M and Strikethroughs.

The 20% drawing requirement was determined to be overly burdensome and there is no mechanism In-Place to reimburse proposal costs for this item. The orginal purpose of the Initial 20% Drawings was to serve as an Evaluation Item in Phase 1 and Firm Up the Basis of a Price Proposal if the Contrator was selected for Phase 2.

You are correct, this is a two (2) Part Process and only Contractors selected in Phase 1 will be advanced to Phase 2 Evaluation and only one (1) contractor will be selected for Contract Award at the conclusion of Phase 2.

In addition to the Strikethrough, the following was inserted into Factor 3:

The Contractor also may present initial Drawings and Specifications for Evaluation in Phase 1 and to assist with establishing the Bid Proposal in Phase 2. Whether the Contractor decides to present initial Drawings and Specifications in Phase 1 is at the discretion of the Design-Build Contractor. If the Contractor decides to present Initial Drawings and Specifications there will be no page limitation or maximum number of pages...Lastly, the Construction Prime Contractor and their Team shall explain how current project solicitation attachments will be developed to meet project outcomes and what conditions and/or assumptions were established.17-Jul-20
3Do the drawings then become the property of the USFWS, should the contractor not be moved into Phase 2 and/or awarded the project?Refer to above response. If the Contractor decides to present initial Drawings and Specifications in Phase I and the Contractor is not selected to advance to Phase 2 and/or is not awarded the Project, the USFWS would reserve the right to use the ideas and/or concepts shown in those drawings and own those drawings.17-Jul-20
4Section L2.1.3. of the Instructions indicates a maximum of 5 pages allowed for the 20% Schematic Design Documents.

Q: Are 11x17 sheets (or other sizes larger than 8.5x11) allowed with the submittal for the drawings? You may use 11 x 17 or 22 x 34 Electronic Size Drawing Pages.

Please note, under Amendment 2, the Initial 20% Schematic Design Drawings are now an Optional Submittal now referred to as "Initial Drawings and Specifications.

The Page limitation for Initial Drawings and Specifications was elminated. Refer to Question No. 2 (Amendment No. 2) response above. You may use unlimited number of Pages for Drawings and Specifications and at the discretion of the Contractor.28-Jul-20
5Section L.1.3. States that all questions regarding the solicitation must be submitted by 7/31. Amendment one extended the due date for the Phase 1 submittal from 8/10 to 8/20.

Q: Will the deadline for questions be similarly extended 10 days? The due date for questions will be extended by 10 days to 8/10/2020. 28-Jul-20