B09_SA_0002_Q_A__3_0002.pdf
PDF 159 KB Posted
- Solicitation number
- 140D0427Q0915
About this file
This is a Questions and Answers form for RFQ 140D0427Q0915, documenting responses to bidder inquiries regarding a scaffolding rental and related services contract.
The document addresses five key questions spanning contractual and technical requirements. Question 1 clarifies bonding requirements, specifying that quoters must follow FAR 52.228-15 and provide evidence of bonding ability per Volume II Section 3, with performance and payment bonds required after award and before Notice to Proceed. Question 2 addresses licensing requirements for out-of-state specialty scaffold contractors, directing compliance with all applicable federal, state, and local licensing, registration, permitting, and regulatory requirements, with licenses to be maintained where applicable by jurisdiction. Question 3 permits monthly inspections during the three-month rental period to be performed by a Louisiana-based competent person acting under the contractor's direction, rather than requiring the contractor's own employee. Question 4 addresses staging platform specifications, clarifying that contractors have discretion in determining elevation placement for at least five staging platforms rated 1,000 pounds each, spaced no more than 21 feet apart, to facilitate mason access to materials. Question 5 confirms that five additional 3,000-pound-rated decks for water tank storage are intended primarily for pressure washing and bronze cleaning operations. No changes to the RFQ were made in response to these inquiries.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ 140D0427Q0915
Attachment 3, Questions Form
QUESTIONS FORM
# RFQ
Section
Question Response Change to RFQ?
Description of Change Technical/ Contractual
1 SF-1442
Blocks 12a/12b;
RFQ
Volume
II,
Section 3 (Evidence of Ability to Obtain Bonding)
SF-1442 Block 12a is checked YES for performance and payment bonds. If the awarded price is at or under $150,000, are 100% performance and payment bonds still required within 7 calendar days of award, or does the Government intend to waive/reduce bonding at that dollar level? Separately, will a surety commitment letter issued under the SBA Surety Bond Guarantee (QuickApp) program satisfy the Volume II Section 3 evidence requirement?
Follow RFO FAR 52.228-15 for bonding requirements.
Evidence showing the quoter’s ability to be bonded is required in accordance with Volume II Section 3.
Any applicable Performance and
Payment bonds will be required after award and before Notice to Proceed is issued.
No N/A Contractual
2 Attachme nt 1, Statemen t of Work §4c
What specific Louisiana license, if any, must an out-of-state specialty scaffold contractor hold to perform scaffold
The Contractor shall comply with all applicable federal, state, and local licensing, registration, permitting, and regulatory
No N/A Technical
(Contract or Responsi bilities — licenses/ permits) design/erection/dismantling only (no masonry or general construction) under this contract — is a Louisiana Commercial Contractor license required, and if so in what classification? Must any required license be held at time of quote, or is it sufficient to obtain it before award / notice to proceed?
requirements governing the performance of scaffolding services.
Where applicable, the Contractor shall maintain all licenses and qualifications required by the jurisdiction in which the work is performed.
The Contractor shall demonstrate adequate bonding capability and maintain required insurance coverage in accordance with the contract requirements.
All scaffolding work, including erection, modification, inspection, maintenance, and dismantling, shall comply with applicable OSHA regulations and project-specific safety requirements.
3 Attachme nt 1, Statemen t of Work §3r (compete nt-person pre-use and monthly inspectio ns)
For the monthly inspections during the 3-month rental period, must the inspections be performed by the Contractor's own employee traveling to the site, or may they be performed by a Louisiana-based competent person engaged by and acting under the Contractor's direction? The Contractor will self-perform all erection, dismantling, and inspection responsibility and is asking only about the physical location/personnel performing the monthly visit.
Inspections may be performed by a Louisiana-based competent person engaged by and acting under the Contractor's direction.
4 Provide at least five staging platforms, each rated at least 1,000 lb, with no more than 21 feet between successive staging platforms.
At what elevations?
Staging platforms shall be integrated into the scaffold design at regular intervals to allow masons ready access to materials.
Specific locations are up to the contractor’s discretion per overall design.
5 Provide five additional decks rated at least 3,000 lb each for water tank storage, distributed at approximately equal intervals. Is this water for pressure washing?
Yes, primarily for pressure washing and bronze cleaning.
*Note: Quoters only need to fill out the highlighted columns: Company, RFQ Section (please include the section, paragraph, and page number that your question refers to), and Question. Quoters may add additional rows, if necessary. Please do not add/remove columns or change column width. Please keep this in MS Word.