B09_SA_0002_Q_A__1_0002.pdf

PDF 123 KB Posted

Attached to
Scaffolding for Repair and Repoint Chalmette Monum
Solicitation number
140D0427Q0915
Issued by

About this file

This is a Questions and Answers form for RFQ 140D0427Q0915, documenting inquiries submitted by potential quoters regarding a scaffolding construction project. The document contains three questions addressing technical requirements for the project.

The first question concerns Section 5 regarding a stated two-week (10-day) work window for scaffolding erection and dismantling. The quoter indicated this timeframe is infeasible based on their project modeling and requested clarification, noting that their calculations indicate approximately four weeks for erection and two weeks for dismantling would be necessary. The government response referenced the Statement of Work provision that "A written target schedule shall be agreed upon prior to arrival of Contractor to site," indicating the schedule is negotiable. The second question addresses Section 3 regarding debris netting specifications and cost implications. The quoter sought clarification on the type of debris netting required and pressure per square foot (PSF) rating needed. The government response specified FR HDPE scaffold debris netting with a minimum 60 percent open area, securely attached per manufacturer recommendations, and clarified the netting is solely for falling-object containment and shall not be considered fall-arrest protection. The third question concerns Section 3 regarding the percentage load the base is allowed to bear and its impact on design calculations. The government response indicated no specified percentage and noted the design should minimize obstructions across base steps due to specified masonry repairs. None of the responses indicated changes to the RFQ were necessary.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ 140D0427Q0915

Attachment 3, Questions Form

QUESTIONS FORM

# RFQ

Section

Question Response Change to RFQ?

Description of Change Technical/ Contractual

1 Section 5 construct ion

This states there is a 2 week (10 day) work window for scaffolding. This is not a feasible timeframe. We have already created a model for this project, and with the piece count we currently have and the time per piece method we use to calculate timeframes, we would need closer to 4 weeks for an erection and approx. 2 weeks for the dismantle.

Per the SOW, “A written target schedule shall be agreed upon prior to arrival of Contractor to site.”

No N/A Technical

2 Section 3

Page 2.

E.

The type of debris netting will affect the cost. Do we have a suggested debris netting type or a required PSF the netting will need to be capable of withstanding?

The netting type will also play a factor in the engineering of the

FR HDPE scaffold debris netting with a minimum 60 percent open area.

Netting shall be securely attached to the scaffold structure in accordance with the manufacturer's recommendations. Debris netting shall be used

No N/A Technical

RFQ 140D0427Q0915

Attachment 3, Questions Form scaffolding for wind rating and uplift rating. Please advise here.

solely for falling-object containment and shall not be considered fall-arrest protection.

3 Section 3

B.

What percentage will the base be allowed to bear?

This will impact design changes with the need to correct these calculations.

There is no specified percentage. In addition to the unknown construction of the base support, the design should minimize obstructions across the base steps as masonry repairs are specified throughout the steps.

No N/A

*Note: Quoters only need to fill out the highlighted columns: Company, RFQ Section (please include the section, paragraph, and page number that your question refers to), and Question. Quoters may add additional rows, if necessary. Please do not add/remove columns or change column width. Please keep this in MS Word.