About this file

This is a Door Schedule specification document for an Electrical Substation (Pintah Power & Light Co.) project. The schedule specifies 28 doors required for the facility, with detailed specifications for each door installation.

The doors vary in size, style, and material composition. Door sizes range from 1'-6"x6'-8" to 2'-2"-8"x6'-8", with most standard openings at 3'-0"x6'-8". Three style options are specified: Style A (6-panel configuration), Style B (flush design), and Style C (flush design with two panels). All doors require paint finish. Material types include H.C. Metal (hollow core metal) for doors 1, 14, 15, and 28, and S.C. Wood (solid core wood) for the remaining 24 doors. Frame materials are specified as MTL (metal) for metal doors and noted where applicable. Hardware specifications (HDW) are listed with numerical values ranging from 14 to 18, likely indicating hardware sets or specifications. The schedule provides a comprehensive bill of materials for procurement and installation, essential for project budgeting, material ordering, and construction sequencing at the electrical substation facility.

View the file

Other files for this federal contract opportunity

Other files attached to Qtrs Renovation Havasupai, newest first.
File Type Posted
Sol_140A2326R0008_Amd_0005.pdf PDF
Sol_140A2326R0008_Amd_0004.pdf PDF
Sol_140A2326R0008_Amd_0003.pdf PDF
IMG_7764_0002.jpeg JPEG file
IMG_7767_0002.jpg JPG image
IMG_7759_0002.jpeg JPEG file
Sol_140A2326R0008_Amd_0002.pdf PDF
IMG_7763_0002.jpg JPG image
IMG_7758_0002.jpeg JPEG file
IMG_7761_0002.jpeg JPEG file
A12_RFP_Questions_and_Answers_Log_B_Government_Response_0002.xlsx XLSX spreadsheet
IMG_7761_1__0002.jpeg JPEG file
IMG_7760_0002.jpeg JPEG file
IMG_7765_0002.jpg JPG image
IMG_7768_0002.jpg JPG image
A12_RFP_Questions_and_Answers_Log_A_Government_REsponse_0001.xlsx XLSX spreadsheet
Sol_140A2326R0008_Amd_0001.pdf PDF
A3_SF24_Bid_Bond.pdf PDF
A4_SF25_Performance_Bond.pdf PDF
A8_-_WAGE_RATES.pdf PDF
A10_IA_Form_C713_Progress_Report.pdf PDF
A14_IA_Form_3000_Material_Approval_Submittal.pdf PDF
A15_IA_Design_Handbook_for_BIE_School_Facilities.pdf PDF
Sol_140A2326R0008.pdf PDF
A6_SF1413_Statement_and_Acknowledgement.pdf PDF
A7_IA_Safety___Health_Adopted_Codes__Policy___Mandatory.pdf PDF
A11_Past_Performance_Questionnaire.doc DOC document
A12_RFP_Questions_and_Answers_Log.xlsx XLSX spreadsheet
A1_-_IE056_Havasupai_Otrs_SOW_2025_7_11_CC.docx DOCX document
A2_-_Project4-Tasks-Photos-Plans.pdf PDF
A5_SF25A_Payment_Bond.pdf PDF
A9_IA_Form_C113_Progress_Schedule.pdf PDF
A13_-_BSR_IEE_Representation.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .