About this file

This document is a Question Log for Solicitation 140A2325Q0142, a fixed-price construction project for replacing and installing a chain link fence at the BIE Wingate High School Sewer Lagoon in Fort Wingate, New Mexico. The solicitation is set aside exclusively for Indian Small Business Economic Enterprises (ISBEE) and involves detailed fencing work, including vegetation clearing, fence removal, potential terrain leveling, and erosion control. Key project parameters include removing approximately 3,626 linear feet of existing fencing, with contractors permitted to take down the entire fence for production purposes, and mulching of cleared vegetation.

The solicitation is issued by the Department of the Interior's Bureau of Indian Education, with a site visit scheduled for Tuesday, May 27, 2025, and a firm deadline for questions on Thursday, May 30, 2025. The full solicitation response is due on Monday, June 16, 2025, at 12:00 p.m. Mountain Daylight Time. Interested contractors must submit two volumes: a Price Schedule (Volume I) and a Response to Evaluation Factors (Volume II). Project-specific details from the question log indicate the contractor will be responsible for engineering slope correctness, with the agency offering support for terrain preparation and t-post staging.

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE/INSTALL CHAIN LINK FENCE LAGOON, newest first.
File Type Posted
Sol_140A2325Q0142_Amd_0002.pdf PDF
Sol_140A2325Q0142_Amd_0001.pdf PDF
SF-25A_Payment_Bond_Form.pdf PDF
IA_Form_C713_Progress_Report.pdf PDF
SF-24_Bid_Bond_Form.pdf PDF
RFI_Form.pdf PDF
A7_DIAR_1452_Clause-Provision_Supplement.pdf PDF
Sol_140A2325Q0142.pdf PDF
IA_-_IEE_Representation_Form.pdf PDF
SF-25_Performance_Bond_Form.pdf PDF
A04_SOW_0001_pdf_(1).docx DOCX document
IA_Form_C113_Progress_Schedule.pdf PDF
IA_Form_3000v2_Material_Approval_Submittal_BIE_revised.pdf PDF
A21_-_PR_44017529_Site_Photo_0001.pdf PDF
SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting).pdf PDF
3_Question_Log.xlsx XLSX spreadsheet
B03_-_WAGE_DETERMINATION.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Question Log 140A2325Q0142 FENCING - Razor Consulting Solutions, Inc.
1Are we to backfill behind the eastern middle section of the fence to prevent erosion that is seemingly certain?If needed to complete project.
2When clearing vegetation are we to completely remove it from property or simply mulch it into the ground as the mowers did around the outside fence perimeter?Mulching is acceptable, if finely ground.
3Can the entire fence be taken down prepped for installing new fence for production and scheduling reasons?Yes, this would be acceptable.
4What is the maximum length of the current fence that can be removed at any one time? Or per day?3,626ft. approximated
5Given that there will be a period where the area is unfenced during the removal and installation, is a temporary fence required?No, not required.
6If the area is left open at any point, who assumes responsibility for it?B.I.E.
7Who will be responsible for the engineering to ensure the slope is correct? As the area on the north side of the center and right ponds, the embankment is quite steep. This will need to be brought to grade level to be modified (shelved out), or may be necessary for some form of erosion control. Who will be responsible for the engineering to ensure the slope is correct and meets all requirements.Contractor.
8The area between the main pond and the pond to its right on the property map? There appears to be a 15' to 20' swell in the terrain. Can this be filled in and leveled out in preparation for fence material installation.Yes, N.M.N.S.Agency can have our Heavy Equipment Operator fill in.
9Where will be storing all the T-Post that will be utilized by BIE?A staging area will be desgnated nearby site for the t-post.
10
11
12