B08__A17_Contractor_Access_Exhibit_0001.pdf
PDF 256 KB Posted
- Attached to
- Wapato Drop One Water Screens Federal contract opportunity
- Solicitation number
- 140A1625R0017
About this file
This document is a Contractor Access Exhibit for the Wapato Drop Pumping Plant Water Screens Project for the Bureau of Indian Affairs, located in Wapato, Washington. The exhibit provides a detailed site plan showing equipment and vehicle access areas within a specified project location, with a checkered area indicating the primary access and staging zone adjacent to an existing canal with concrete lining.
The exhibit includes specific notes outlining contractor requirements for access, setup, and equipment positioning. Contractors are required to designate access, set up locations, and provide equipment lists with significant point loads for review and approval by the contracting officer or representative. The document emphasizes that equipment and vehicle access in the designated areas is subject to certain limitations, and contractors must coordinate their proposed matting, decking, or load distribution methods with the project team.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C O N
TR
AC
TO
R A C C
ES
S
EX
H
IB
IT
G
EN
ER
AL
PR
M B
KL
FILENAME: PLOT DATE: PLOT TIME:
JA
C O
BS
0.
A
LL
R
IG
H
TS
R
ES
ER
VE
D
JA
C O
BS
A N D
IS
N O T
TO
B E U
SE
D , I N W
H O
LE
O R
IN
P
AR
T, F O R A N Y O
TH
ER
P R O
JE
C T W
IT
H O U T
TH
E W R
IT
TE
N A U
TH
O R
IZ
AT
IO
N O F
JA
C O
BS
TH
IS
D O C U M
EN
T, A N D T H E
ID
EA
S
AN
D D
ES
IG
N S
IN
C O R
PO
R
AT
ED
H
ER
EI
N , A
S
AN
IN
ST
R U M
EN
T O F
PR
O
FE
SS
IO
N
AL
S
ER
VI
C E, IS
T H E
PR
O
PE
R
TY
O F
R
EU
SE
O F D O C U M
EN
TS
1 2 3 4 5 6
B
C
D
VERIFY SCALE
BAR IS ONE INCH ON
ORIGINAL DRAWING.
1"0 c
PROJ
DATE
D
AT
E N O
D
SG
N D R
R
EV
IS
IO
N
C H K
AP
VD
BY
AP
VD
SHEET
DWG
A of
6/20/2025 9:46:26 AMContractor Access Exhibit.dwg
FI
N
AL
D
ES
IG
N
10/2024 D3673800
W
AP
AT
O
IR
R
IG
AT
IO
N P R O
JE
C T
D R O P
PU
M
PI
N G P
LA
N T
W
AT
ER
S C R
EE
N S
PR
O
JE
C T
BU
R
EA
U O F
IN
D
IA
N A
FF
AI
R S
W
AP
AT
O , W
A
PR
R F
EXHIBIT A
AS SHOWN
0 20 40
SCALE IN FEET
1. AS PART OF THE PROJECT SPECIFICATIONS
SECTION 01 50 00 TEMPORARY FACILITIES AND
CONTROLS AND THE REQUIRED STAGING AREA
LOCATION PLAN SUBMITTAL, CONTRACTOR IS
REQUIRED TO DESIGNATE ACCESS, SET UP
LOCATIONS, EQUIPMENT LIST, AND EQUIPMENT
SPECIFICATIONS FOR CONCRETE TRUCKS,
CRANES, FORKLIFTS, TELEHANDLERS, BOOM
LIFTS, AND OTHER EQUIPMENT WITH
SIGNIFICANT POINT LOADS FOR REVIEW AND
APPROVAL BY THE CONTRACTING OFFICER
REPRESENTATIVE OR BIA REPRESENTATIVE.
2. CONSTRUCTION EQUIPMENT ACCESS AND SET
UP WITHIN AREAS INDICATED MAY BE PERMITTED
UPON REOVIEW F CONTRACTOR'S PROPOSED
MATTING, DECKING, OR OTHER MEANS FOR
DISTRIBUTING LOADS.
NOTES
AD
AM
S
LA
N E
EQUIPMENT AND VEHICLE
ACCESS IN THESE AREAS IS
SUBJECT TO LIMITATIONS,
SEE NOTES 1 AND 2
EDGE OF EXISTING CANAL
CONCRETE LINING
| Sheets and Views |
| CA Exh |
File details come from the government source that posted it. Updated .