Attachment_3___Representative_TO__2___Annual_Operation_and_Maintenance_Services_SOW.docx

DOCX document 61 KB Posted

Attached to
Safety of Dams Environmental Monitoring System Ope
Solicitation number
140A1624R0009
Issued by

About this file

This document is a Statement of Work (SOW) for an Annual Operation and Maintenance Services Task Order under a federal contract opportunity for the Bureau of Indian Affairs' (BIA) Early Warning System (EWS) program.

The SOW outlines the contractor's responsibilities for providing annual maintenance, emergency repairs, reservoir elevation surveys, and training services for over 230 EWS monitoring sites across various tribal lands. Key requirements include: performing site inspections and preventative maintenance on equipment such as pressure transducers, rain gauges, and power systems; monitoring site deficiencies; coordinating with BIA and tribal staff; and submitting detailed site visit reports. The contractor is required to adhere to Bureau of Reclamation safety standards. The period of performance is through December 2025, with annual maintenance in the Rocky Mountain Region to be completed by May 2025. Deliverables include a work plan, job hazard analysis, site visit reports, and weekly summaries of maintenance issues. The related federal contract opportunity is Solicitation 140A1624R0009 for Safety of Dams Environmental Monitoring System Operation, Data and Support.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Annual Site Maintenance

Representative Task Order - Scope of Work May 2024

Background

BIA’s early warning system (EWS) monitors environmental conditions at dams on tribal lands and sends notifications when specific conditions are met. Assurance that an EWS will function as designed is enhanced by the maintenance and exercise of the system prior to a live event. If these activities are not completed regularly, then a hazardous event could go undetected, and the proper people not warned.

To ensure the EWS sites function as designed, the BIA provides annual EWS maintenance and training services for the sites. BIA staff alone cannot attend to all maintenance needs associated with the large EWS inventory of 260+ sites. This statement of work (SOW) provides for annual EWS maintenance.

Project Management The contractor shall perform project, schedule, and budget management throughout the duration of the project, and organize and attend periodic project meetings as needed. Periodic project meetings shall be held weekly, with more frequent meetings scheduled as needed. It is anticipated that the periodic project meetings can all be held by conference call.

Contractor shall submit a resource-loaded schedule including anticipated submission dates of each deliverable described in this SOW. This schedule shall be used as the BIA’s basis for tracking actual project progress. Once accepted by the BIA, this schedule shall become the basis for the Period of Performance of the Task Order and shall be contractually binding. Should conditions or events beyond the control of the Contractor occur which cause delays, a modification may be issued by BIA. The contractor shall update the schedule weekly, as necessary based on changes.

In addition, the contractor shall prepare monthly progress reports and submit these to the Contracting Officer’s Representative (COR). These reports shall summarize the work completed during the previous month and shall include updates to the project schedule and details regarding the remaining project budget and percentage of work completed. In addition to the above-mentioned items, this task includes Quality Assurance/Quality Control (QA/QC) throughout the project and performing any other project management, subcontracting, and coordination tasks that may be needed to complete the project including but not limited to scheduling and organizing any required site inspection trips, reviewing and preparing invoices, and transmitting the final reports and supporting files.

The Project Manager shall provide the following items as part of their duties to the BIA.

· Meeting minutes for all project meetings

· Monthly progress reports

· Invoices

· Resource-loaded schedule

Scheduling of site visits will be arranged by the Contractor in coordination with the BIA Lakewood Office, the appropriate local BIA/Tribal Reservation staff, and the BIA Regional SOD Officer. To meet the contract performance date and travel approval requirements, it is advised that work activities be scheduled with as much advance notice as possible. Contractor shall report site visits through text and email notifications and by phone to National Monitoring Center (NMC) so that notification phone calls based on false alarms are not triggered.

Scheduling for site visits will be prioritized based on maintenance need (emergency repairs, sites that are out of working order), time since prior maintenance visit, seasonal weather conditions, site accessibility, BIA/Tribe Staff schedule, and other variable elements. The BIA will provide the Contractor with contacts for each reservation and assist with the scheduling of the site visits if required. The Contractor shall inquire and adhere to any BIA Regional and Tribal protocols prior to entering Tribal Lands. Short term scheduling of maintenance visits should be for emergency repairs only.

Scope of Work

For Task 1, the contractor shall provide field maintenance site visits that include annual maintenance, emergency repairs, reservoir elevation surveys, and training services for each of the monitoring sites listed in Table 1, or as modified by mutual agreement of the BIA and Contractor.

For Task 2, Contractor shall monitor deficiencies for all BIA EWS sites, including site outage alarms, low battery voltages, high byte counts, and sensor outages. The focus of this effort is to ensure reliable monitoring of reservoir levels.

All service activities will be fully documented in a report for each reservation. The documentation shall include monitoring sensor parameters, any measured equipment performance criteria, and detailed photographs including site conditions, reservoir elevation, and the staff gage, as applicable. Additional equipment or infrastructure repairs or other site work identified during each site visit shall be documented in the EWS inventory database (maintenance worksheets uploaded for each site and updates of site inventory completed).

During the course of work, it may become evident that other activities not explicitly outlined in this Scope of Work may be necessary to maintain functioning EWS Sites. Other tasks which are necessary to accomplish this will be evaluated by the BIA individually and executed under separate contract action.

Specific contractor services expected for annual maintenance, repair, and training; travel; and emergency maintenance are listed below.

Contractor is required to be compliant with Bureau of Reclamation safety standards at the link below:

· https://www.usbr.gov/safety/rshs/index.html

Contractor Services

Task 1 – Annual Maintenance

Annual maintenance and repair* activities shall include:

· Provide pre-site visit data check (including latency) and discussion with BIA Denver Office Staff to identify any site/sensor issues to be addressed.

· Provide repair or replacement of damaged and/or missing parts. When available, equipment in the BIA’s spare parts inventory will be utilized for the repair work required.

· Survey and verify Pressure Transducer readings and update to known reference value. Confirm water elevation as tied to spillway or local datum and adjust reference accordingly.

· Test and tune or repair (if needed) of all radios for remote site link.

· Verify telemetry operations for primary and standalone sites (end to end communications sensors to the EWS website.

· Test/calibrate and clean rain gage in accordance with manufacturer’s recommendations.

· Perform field check of other meteorological sensors for accuracy and repair/calibrate or replace instruments, when necessary and in accordance with manufacturer’s recommendations.

· Test and repair or replace as needed power system components – solar panel, battery, power regulator, trickle charger, etc, in accordance with manufacturer's recommendations.

· Maintain cables, connectors, antennas, grounding systems, intrusion sensor/cable and other system components as needed and in accordance with manufacturer’s recommendations.

· Clean all housings, solar panels, and equipment.

· Test float switches by lifting the highest float first, then subsequently lower floats.

· Clean float switches as needed.

· Contact the BIA Denver Office staff about incidents, such as vandalism, sensor problems, and other concerns with the monitoring site.

· If provided, relay information related to contacts receiving EWS notifications (Tribal and BIA Staff phone numbers/email addresses used for site notifications) to BIA Denver Office.

· Replace or repair radio, cellular, or satellite antenna or interface as needed.

· Replace or repair failed sensors and batteries with new equipment as necessary and in accordance with manufacturer’s recommendations.

· Update datalogger programming to current version, as needed.

· Provide general site maintenance including upkeep of NEMA boxes, mountings, and repair of minor damage due to wear and tear, weather, and vandalism.

· Diagnose and troubleshoot failures to the component or board level and return equipment to service given available spare parts.

· Reinstall site electronics removed for dam rehabilitation or install new sites.

· Remove equipment from sites that are being decommissioned.

· Adjust the EWS website, such as adding or removing sensors and sites or putting sensors or site in maintenance mode or make them only viewable by administrative users, as applicable.

· Contractor is responsible for maintaining all equipment on site, including electronics, conduit, and other infrastructure.

· Measure reservoir elevation to 0.1 ft accuracy in NAVD88 or another agreed upon datum and using the most recent available geoid. The measured elevation and time of measurement will be reported in the site visit report.

· BIA may direct Contractor to measure the elevation of up to 5 other locations at the dam site during the site visit.

· Report any PT datum adjustments required to BIA within 5 days of site visit.

* Replacements will be the same make and model as the original. Substitutions must be approved by the BIA prior to installation.

Every effort should be made to have each monitoring site fully functional before leaving the site. If annual maintenance deficiencies remain after site visit, contractor shall revisit the site to address the deficiency within 7 days unless BIA approves additional time.

Training services Onsite, hands-on training will be offered to local staff during each annual maintenance site visit. The training is anticipated to last 30-60 minutes for each reservation.

· Provide the most updated EWS Training Manual, if needed.

· Provide on-site training for available Tribal and BIA Staff during maintenance visits so that they can perform monthly maintenance and typical troubleshooting and repair activities, including:

· Maintain and clean housings, float switches, solar panels, rain gage, PT, and other sensors/equipment.

· Properly reboot the site.

· Troubleshoot components and replace standard components.

· Verify EWS website data compared to field conditions.

· Additional EWS training as requested by local staff during site visits.

Travel costs

· Airfare, car rental, and vehicle mileage, as needed to get to the site.

· Per diem meals and hotel costs.

· Other travel costs, as applicable.

· Contractor shall be compliant with Department of the Interior travel regulations.

Maintenance supplies to be furnished by Contractor

· 12 Amp-Hour Battery only (pass through), 2

· 35 Amp-Hour Battery only (pass through), 50

· 100 Amp-Hour Battery with fused harness (field ready) - excludes shipping, 6

· Additional Shipping from Contractor to BIA Destination

· Additional equipment or supplies anticipated by contractor to be needed for maintenance must be included in the task order proposal. Any equipment not used in this year’s annual maintenance task order will be stored at the contractor’s facility for use in future maintenance and repair activities.

Government furnished equipment and services

· Government furnished equipment and supplies stored at the contractor’s facility

· Contact information for coordinating with Regional and local staff

Task 2 – Deficiency Monitoring

Contractor shall monitor deficiencies for all BIA EWS sites, including site outage alarms, low battery voltages, high byte counts, and sensor outages. The focus of this effort is to ensure reliable monitoring of reservoir levels. Historically, this work has taken 1-2 hours weekly throughout the year.

In addition, the Contractor shall also monitor site and sensor status to ensure accurate rain and stream levels. For deficiencies that require follow-up, Contractor shall reach out to local staff and the Regional SOD Officer, copying EWS@BIA.GOV on all email correspondence, to resolve the issue. When required, Contractor shall work with local/Agency, Regional, and Central Office EWS staff to schedule a site visit to resolve the deficiency. Additional equipment or infrastructure repairs or other site work identified during maintenance deficiency follow-up shall be documented in the EWS inventory database. Contractor shall log deficiencies and any actions taken and submit a summary to the BIA weekly.

Deficiency monitoring services shall include:

· Repairs, troubleshooting support (via phone or email), site work, and other critical EWS support as-needed and agreed upon by BIA, the Contractor, and local staff.

· Monitoring maintenance issues at sites (including site outages, low batteries, high byte count, and sensor outages) and coordinating follow-up and repairs as necessary.

· Maintain a log of maintenance and operation deficiencies at all monitoring sites.

Period of Performance

The requested maintenance and associated activities for this SOW shall be completed by December 31, 2025. Annual maintenance for sites in the Rocky Mountain Region will be completed by May 1, 2025 unless alternative dates are arranged with the BIA Central Office and Rocky Mountain Region Safety of Dams Officer.

Deliverables

· A Work Plan summarizing the planned schedule for performing the annual maintenance site visits. The Work Plan shall be submitted to the BIA in PDF format for their review and approval within one month of task order being awarded.

· By the 10th of each month, confirm the dates of each trip scheduled for the following month. This includes advanced coordination with local staff, BIA Regional SOD Officers, and BIA Central Office staff as listed in the EWS Contact List provided by the BIA.

· A Job Hazard Analysis (JHA) describing the safety hazards that may be encountered by site visit attendees and ways to mitigate them. The JHA shall also include the location of the nearest emergency services from the field locations. The JHA shall be submitted to the BIA in PDF format for review and approval a minimum of two weeks prior to each site visit.

· A site visit report for each trip summarizing the work completed and relevant observations and follow-up work required. The site visit report will include a minimum of one photo per site visited.

· A completed OTS Trip Report for each reservation visited. The template for this report will be provided by BIA. The OTS Trip Report must be submitted to the BIA within 5 working days of trip completion.

· Weekly summary of critical maintenance required and follow-up actions to troubleshoot and resolve issue(s). Critical maintenance includes activities that are required to monitor reservoir elevations at high hazard potential dams in the BIA dam safety program.

Table 1. FY23 EWS Maintenance Site Locations. Remote sites have radio connections to satellite transmission sites.

No.
Site Name
Site Type
Reservation
Region
1
Acomita Dam
Remote
Acoma
Southwest
2
Acomita Dam Camera
Cellular
Acoma
Southwest
3
Acomita Upstream
Satellite
Acoma
Southwest
4
Chester Lake Dam
Satellite
Annette Island
Northwest
5
Chester Lake Display
Remote
Annette Island
Northwest
6
Four Horns Dam
Satellite
Blackfeet
Rocky Mountain
7
Four Horns Downstream
Remote
Blackfeet
Rocky Mountain
8
Lower Two Medicine Dam
Satellite
Blackfeet
Rocky Mountain
9
Lower Two Medicine Dam Camera
Cellular
Blackfeet
Rocky Mountain
10
Lower Two Medicine Downstream
Satellite
Blackfeet
Rocky Mountain
11
Pushmataha Dam
Satellite
Choctaw
Eastern
12
Pushmataha Dam Camera
Cellular
Choctaw
Eastern
13
Granite Creek
Satellite
Colville
Northwest
14
Owhi Dam
Satellite
Colville
Northwest
15
Owhi Downstream
Remote
Colville
Northwest
16
Twin Lakes (North) Downstream
Satellite
Colville
Northwest
17
Twin Lakes Dam (North)
Satellite
Colville
Northwest
18
Twin Lakes Dam (South)
Satellite
Colville
Northwest
19
Fourth Creek Dam
Satellite
Coquille
Northwest
20
Fourth Creek Downstream
Remote
Coquille
Northwest
21
Tarheel Dam
Satellite
Coquille
Northwest
22
Tarheel Downstream
Remote
Coquille
Northwest
23
Cow Creek Dam 1
Internet with Satellite Backup
Cow Creek
Northwest
24
Cow Creek IWR Auxillary
Internet
Cow Creek
Northwest
25
Cow Creek IWR Dam
Internet
Cow Creek
Northwest
26
Cow Creek Lagoon
Internet
Cow Creek
Northwest
27
Cow Creek Weir Building
Internet
Cow Creek
Northwest
28
Willow Creek Dam
Satellite
Crow
Rocky Mountain
29
Willow Creek Diversion
Satellite
Crow
Rocky Mountain
30
Willow Creek Downstream
Remote
Crow
Rocky Mountain
31
Ambrose Dam
Satellite
Crow Creek
Great Plains
33
Black Lake Dam
Satellite
Flathead
Northwest
34
Crow Dam
Satellite
Flathead
Northwest
35
Crow Downstream
Satellite
Flathead
Northwest
36
Crow Upstream
Satellite
Flathead
Northwest
37
Hubbart Dam
Satellite
Flathead
Northwest
38
Hubbart Downstream
Satellite
Flathead
Northwest
39
Kicking Horse Dam
Remote
Flathead
Northwest
40
Kicking Horse Downstream
Satellite
Flathead
Northwest
41
Little Bitterroot Dam
Satellite
Flathead
Northwest
42
Little Bitterroot Downstream
Satellite
Flathead
Northwest
43
Lower Dry Fork Dam
Satellite
Flathead
Northwest
44
Lower Jocko Dam
Satellite
Flathead
Northwest
45
Lower Jocko Downstream
Satellite
Flathead
Northwest
46
McDonald Dam
Satellite
Flathead
Northwest
47
McDonald Dam Camera
Cellular
Flathead
Northwest
48
McDonald Downstream (Post Creek)
Satellite
Flathead
Northwest
49
Mission Dam
Satellite
Flathead
Northwest
50
Mission Dam Camera
Cellular
Flathead
Northwest
51
Mission Downstream
Satellite
Flathead
Northwest
52
Ninepipe Dam
Satellite
Flathead
Northwest
53
NinePipe North Canal
Satellite
Flathead
Northwest
54
Ninepipe South Canal
Remote
Flathead
Northwest
55
Pablo Dam
Satellite
Flathead
Northwest
56
Pablo Dam Camera
Cellular
Flathead
Northwest
57
Pablo Downstream
Remote
Flathead
Northwest
60
Tabor Dam
Satellite
Flathead
Northwest
61
Tabor Downstream
Satellite
Flathead
Northwest
62
Twin Turtle Dam
Satellite
Flathead
Northwest
63
Twin Turtle Downstream
Remote
Flathead
Northwest
64
Upper Dry Fork Dam
Satellite
Flathead
Northwest
65
A1 Dam
Satellite
Fort Apache
Western
66
Alchasey Hatchery
Satellite
Fort Apache
Western
67
Big Bear Dam
Satellite
Fort Apache
Western
68
Bog Tank Dam
Remote
Fort Apache
Western
69
Bootleg Dam
Satellite
Fort Apache
Western
70
Christmas Tree Dam
Satellite
Fort Apache
Western
71
Cooley Dam
Satellite
Fort Apache
Western
72
Cooley Dam Camera
Cellular
Fort Apache
Western
73
Cordoroy Creek
Satellite
Fort Apache
Western
74
Cyclone Dam
Satellite
Fort Apache
Western
75
Davis Dam
Satellite
Fort Apache
Western
76
Diamond Creek
Satellite
Fort Apache
Western
77
Drift Fence Dam
Satellite
Fort Apache
Western
78
Earl Park Dam
Satellite
Fort Apache
Western
79
Horseshoe Cienga Dam
Satellite
Fort Apache
Western
80
Little Bear Dam
Satellite
Fort Apache
Western
81
Lower Log
Satellite
Fort Apache
Western
82
McCoys Bridge
Satellite
Fort Apache
Western
83
Pacheta Dam
Satellite
Fort Apache
Western
84
Pacheta Downstream
Satellite
Fort Apache
Western
85
Paradise
Satellite
Fort Apache
Western
86
Reservation Dam
Satellite
Fort Apache
Western
87
Reservation Downstream
Satellite
Fort Apache
Western
88
Sunrise Dam
Satellite
Fort Apache
Western
89
Upper Log Gage
Satellite
Fort Apache
Western
90
Upper Log Siren
Satellite
Fort Apache
Western
91
Blackfoot Dam
Satellite
Fort Hall
Northwest
92
Blackfoot Downstream – Rocky Ford
Satellite
Fort Hall
Northwest
93
Equalizer Dam
Satellite
Fort Hall
Northwest
94
Equalizer Downstream
Satellite
Fort Hall
Northwest
95
Equalizer Upstream – Rich Lane
Satellite
Fort Hall
Northwest
96
Pasture Canyon Dam
Remote
Hopi
Western
97
Pasture Canyon Dam Camera
Cellular
Hopi
Western
98
Pasture Canyon Downstream
Satellite
Hopi
Western
99
Dulce Dam
Satellite
Jicarilla
Southwest
100
Dulce Downstream
Remote
Jicarilla
Southwest
101
Fourth of July Dam
Satellite
Jicarilla
Southwest
102
LaJara Dam
Satellite
Jicarilla
Southwest
103
LaJara N Flasher
Remote
Jicarilla
Southwest
104
LaJara S Flasher
Remote
Jicarilla
Southwest
105
Lower Mundo Dam
Satellite
Jicarilla
Southwest
106
Lower Mundo Dam Camera
Cellular
Jicarilla
Southwest
107
Lower Mundo Downstream
Remote
Jicarilla
Southwest
108
Pappaws Dam
Satellite
Jicarilla
Southwest
109
Pine Tree Dam
Satellite
Jicarilla
Southwest
110
Stone Lake Dam
Satellite
Jicarilla
Southwest
111
Stone Lake Downstream
Satellite
Jicarilla
Southwest
112
Stone Lake Siren
Remote
Jicarilla
Southwest
113
Paguate Dam
Satellite
Laguna
Southwest
114
Neopit Dam
Satellite
Menominee
Midwest
115
Neopit Downstream
Remote
Menominee
Midwest
116
Cienegita Dam*
Satellite
Mescalero
Southwest
117
Eagle Creek Dam
Satellite
Mescalero
Southwest
118
Eagle Creek Downstream
Remote
Mescalero
Southwest
119
Jose Second Dam*
Satellite
Mescalero
Southwest
120
Mescalero Dam
Satellite
Mescalero
Southwest
121
Mescalero Dam Camera
Cellular
Mescalero
Southwest
122
Mescalero Downstream
Remote
Mescalero
Southwest
123
Sego Creek
Satellite
Mescalero
Southwest
124
Silver Lake Dam
Satellite
Mescalero
Southwest
125
Silver Lake Dam Camera
Cellular
Mescalero
Southwest
126
Asaayi Dam
Satellite
Navajo
Navajo
127
Asaayi Downstream
Remote
Navajo
Navajo
128
Asaayi Upstream
Satellite
Navajo
Navajo
129
Captain Tom Dam
Satellite
Navajo
Navajo
130
Captain Tom Dam Camera
Cellular
Navajo
Navajo
131
Captain Tom Downstream
Satellite
Navajo
Navajo
132
Charley Day Dam
Satellite
Navajo
Navajo
133
Cutter Dam
Satellite
Navajo
Navajo
134
Cutter Dam Camera
Cellular
Navajo
Navajo
135
Cutter Downstream
Satellite
Navajo
Navajo
136
Ganado Dam
Satellite
Navajo
Navajo
137
Many Farms Dam
Satellite
Navajo
Navajo
138
Red Lake Dam
Satellite
Navajo
Navajo
139
Round Rock Dam
Satellite
Navajo
Navajo
140
Todacheene Dam
Satellite
Navajo
Navajo
141
Todacheene Downstream
Remote
Navajo
Navajo
142
Tsaile Creek (Upstream)
Satellite
Navajo
Navajo
143
Tsaile Dam
Satellite
Navajo
Navajo
144
Tsaile Dam Camera
Cellular
Navajo
Navajo
145
Wheatfields Dam (p)
Satellite
Navajo
Navajo
146
Wheatfields Downstream
Remote
Navajo
Navajo
147
Wheatfields Upstream
Satellite
Navajo
Navajo
148
Window Rock Dam
Satellite
Navajo
Navajo
149
Window Rock Downstream
Remote
Navajo
Navajo
150
Mem Dam (Top Cat Dam)
Satellite
Paskenta
Pacific
151
Mem Dam (Top Cat Dam) Camera
Cellular
Paskenta
Pacific
152
Mem Dam (Top Cat Dam) Downstream
Remote
Paskenta
Pacific
153
Allen Dam
Satellite
Pine Ridge
Great Plains
154
Kyle Dam
Satellite
Pine Ridge
Great Plains
155
Kyle Dam Camera
Cellular
Pine Ridge
Great Plains
157
White Clay Dam
Satellite
Pine Ridge
Great Plains
158
White Clay Dam Camera
Cellular
Pine Ridge
Great Plains
159
White Clay Downstream
Satellite
Pine Ridge
Great Plains
160
Bonneau Dam
Satellite
Rocky Boys
Rocky Mountain
161
Bonneau Dam Camera
Cellular
Rocky Boys
Rocky Mountain
162
Bonneau Downstream
Satellite
Rocky Boys
Rocky Mountain
163
East Fork Dam
Satellite
Rocky Boys
Rocky Mountain
164
East Fork Downstream
Remote
Rocky Boys
Rocky Mountain
165
Antelope Dam
Satellite
Rosebud
Great Plains
166
Ghost Hawk Dam
Satellite
Rosebud
Great Plains
167
He Dog Dam
Satellite
Rosebud
Great Plains
168
He Dog Dam Camera
Cellular
Rosebud
Great Plains
169
Indian Scout Dam
Remote
Rosebud
Great Plains
170
Indian Scout Downstream
Satellite
Rosebud
Great Plains
171
Parmelee Dam
Satellite
Rosebud
Great Plains
172
Ponca Dam
Satellite
Rosebud
Great Plains
173
Ponca Dam Camera
Cellular
Rosebud
Great Plains
174
Ring Thunder Dam
Satellite
Rosebud
Great Plains
175
Rosebud Creek
Remote
Rosebud
Great Plains
176
Rosebud Dam
Satellite
Rosebud
Great Plains
177
Rosebud Dam Camera
Cellular
Rosebud
Great Plains
178
South Okreek Dam
Satellite
Rosebud
Great Plains
179
Sully 2 Dam
Satellite
Rosebud
Great Plains
180
Dry Lake Dam
Satellite
San Carlos
Western
181
Elgo Dam
Satellite
San Carlos
Western
182
Elgo Dam Camera
Cellular
San Carlos
Western
183
Elgo Downstream
Remote
San Carlos
Western
184
Elgo Upstream - Blue River
Satellite
San Carlos
Western
185
Elgo Upstream - Warm Springs
Satellite
San Carlos
Western
186
Gilson Wash
Satellite
San Carlos
Western
187
Point of Pines Dam
Satellite
San Carlos
Western
188
Point of Pines Downstream
Satellite
San Carlos
Western
189
Sevenmile Wash
Satellite
San Carlos
Western
190
Tufa Stone Dam
Satellite
San Carlos
Western
191
San Francisco Dam
Satellite
San Felipe
Southwest
192
San Francisco Dam Camera
Cellular
San Felipe
Southwest
193
Water Tank Dam
Satellite
San Felipe
Southwest
194
Santa Ana Dam
Satellite
Santa Ana
Southwest
195
Santa Ana Dam Camera
Cellular
Santa Ana
Southwest
196
Santa Ana Dam Downstream
Remote
Santa Ana
Southwest
197
Lake Capote Dam
Satellite
Southern Ute
Southwest
198
Lake Capote DS
Remote
Southern Ute
Southwest
199
Prairie No. 1 Dam
Satellite
Standing Rock
Great Plains
200
Standing Rock Dam
Satellite
Standing Rock
Great Plains
201
Tesuque Dam
Satellite
Tesuque
Southwest
202
Menagers Dam
Satellite
Tohono O'odham
Southwest
203
Menagers Dam Camera
Cellular
Tohono O'odham
Southwest
204
Menagers Upstream
Satellite
Tohono O'odham
Southwest
205
Tat Momolikot Dam
Satellite
Tohono O'odham
Southwest
206
Belcourt Dam
Remote
Turtle Mountain
Southwest
207
Belcourt Dam Camera
Cellular
Turtle Mountain
Great Plains
208
Gordon Dam
Satellite
Turtle Mountain
Great Plains
209
Gordon Downstream
Remote
Turtle Mountain
Great Plains
210
Bottle Hollow Dam
Satellite
Uintah and Ouray
Western
211
Bottle Hollow Downstream
Remote
Uintah and Ouray
Western
212
Midview Dam
Remote
Uintah and Ouray
Western
213
Midview Downstream
Satellite
Uintah and Ouray
Western
214
North Bottle Hollow Downstream
Satellite
Uintah and Ouray
Western
215
Indian Lake Dam
Remote
Umatilla
Northwest
216
Indian Lake Downstream
Satellite
Umatilla
Northwest
217
Weber Downstream
Satellite
Walker River
Western
218
Happy Valley Dam
Remote
Warm Springs
Northwest
219
Happy Valley Downstream
Satellite
Warm Springs
Northwest
220
Ray Lake Dam
Satellite
Wind River
Rocky Mountain
221
Ray Lake Downstream
Remote
Wind River
Rocky Mountain
222
Washakie Dam
Satellite
Wind River
Rocky Mountain
223
Washakie Dam Camera
Cellular
Wind River
Rocky Mountain
224
Washakie Downstream - Dike
Satellite
Wind River
Rocky Mountain
225
Lauer Dam
Satellite
XL Ranch
Pacific
226
Lauer Dam Camera
Cellular
XL Ranch
Pacific
227
Lauer Downstream
Satellite
XL Ranch
Pacific
228
Black Rock Dam
Satellite
Zuni
Southwest
229
Black Rock Downstream
Remote
Zuni
Southwest
230
Black Rock Mesa
Satellite
Zuni
Southwest
231
HorseHead Canyon
Satellite
Zuni
Southwest
232
Nutria 2 Dam*
Satellite
Zuni
Southwest
233
Pescado Dam
Satellite
Zuni
Southwest
234
Pescado Downstream
Remote
Zuni
Southwest
235
Pescado Upstream
Satellite
Zuni
Southwest
236
Stockyard Mesa
Satellite
Zuni
Southwest
237
Trapped Rock Dam
Satellite
Zuni
Southwest
238
Trapped Rock Dam Camera
Cellular
Zuni
Southwest

*These dams are not classified as high hazard dams. They are being monitored as upstream sites to one of BIA’s high hazard dams.