Sol_140A1125B0001_Amd_0003.pdf
PDF 92 KB Posted
- Attached to
- WHITE MOUNTAIN APACHE ADULT DETENTION - WALL REPAI Federal contract opportunity
- Solicitation number
- 140A1125B0001
About this file
This document is an Amendment (Amendment No. 3) to a federal solicitation for wall repair at the White Mountain Apache Adult Detention facility. The amendment primarily provides responses to eight contractor questions, revealing key project details. Notable responses include: the government has not engaged a structural engineer to confirm the proposed work as a permanent solution, the root cause of structural cracking has been identified, full-time onsite government escorts will be provided, and entry/exit inspections of workers, tools, and equipment will be required. The contract includes a five-year warranty for workmanship that applies only to the repairs performed, not to future structural movements. No prior monitoring documentation of movement or settlement was located in the program files, and no sample warranty template will be provided by the government.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140A1125B0001_Amd_0002.pdf | ||
| H52-32-85_FCA_REPORT_0002.pdf | ||
| Photo_of_Door_0002.pdf | ||
| WMAT_Detention_Adult___Juvenile_1_15_08_0002.pdf | ||
| White_Mountain_ApacheDetention_Facility_Exterior_Repairs_-SOW_5_19_25_0001.pdf | ||
| Sol_140A1125B0001_Amd_0001.pdf | ||
| Wage_Determination_AZ20250027_02142025.pdf | ||
| Questions_and_Answers_Log.xlsx | XLSX spreadsheet | |
| SOW.pdf | ||
| Sol_140A1125B0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140A1125B0001 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Phoenix AZ 85004
A11
SUITE 400 MAILROOM
2600 N CENTRAL AVENUE
Contracting Office
DOI, BIA WRO
Phoenix AZ 85004
A11
SUITE 400 MAILROOM
Contracting Office
2600 N CENTRAL AVENUE
BIA WRO 00011
05/30/20250003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/11/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment No. 3 is issued as follows:
1. Responses to questions are provided:
Question 1: Has a structural engineer been engaged by the Government to confirm that the proposed scope of work will serve as a permanent solution?
Response 1: No.
Question 2: Has the root cause of the cracking or structural movement been identified and addressed as part of this project?
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Renee Holly
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140A1125B0001/0003
Response 2: Yes.
Question 3: Will the Government provide a sample or template of the required 5-year warranty for review?
Response 3: No, the government requires the contractor to provide a standard construction five-year warranty for their workmanship.
Question 4: Will the warranty apply only to the workmanship of the repairs performed, or is the contractor expected to warrant against any future structural movement, regardless of cause?
Response 4: The warranty will apply only to the workmanship of the repairs performed.
Question 5: Has there been any prior monitoring or documentation of movement, settlement, or shifting in this area? If so, can those records be made available? This will help us assess whether the issue is ongoing or already stabilized.
Response 5: No.
Question 6: Does the government intend to provide fulltime onsite escorts for the duration of the project?
Response 6: Yes
Question 7: Will entry and exit inspections of workers, tools, and equipment be required as part of site access procedures?
Response 7: Yes
Question 8: On page 8, item 2 of the 2019
Facility Condition Assessment Report, B Shell recommends that an engineering study be performed to evaluate the cracking wall and settlement.
Could you please confirm whether this study has been completed? If so, we kindly request a copy of the report for our review.
Response 8: A report was not located in the files
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140A1125B0001/0003 the program files.
2. All other terms and conditions remain unchanged.