Sol_140A0425Q0003_Amd_0001.pdf

PDF 90 KB Posted

Attached to
QTRS 140 RENOVATION
Solicitation number
140A0425Q0003
Issued by

About this file

This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a renovation project issued by the Bureau of Indian Affairs (BIA) Midwest Regional Office. The amendment changes the closing date from September 15, 2025, to September 22, 2025, at 5:00 PM CDT and provides clarifications through a series of Request for Information (RFI) questions and answers. Key details include material specifications for a small one-level house renovation, such as hail-resistant siding, waterproof flooring, and weather-treated wood for the deck. The government will require 100% replacement of siding, with other components (sheetrock, plumbing, electrical) to be assessed visually. The contractor will identify and replace faulty appliances, and the BIA facility manager will have jurisdiction over inspections, potentially with an independent vendor's assessment. The period of performance is set from September 29, 2025, to December 31, 2025.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140A0425Q0003 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

A06

Bloomington MN 55437 Contracting Office

5600 WEST AMERICAN BOULEVARD

BIA MWRO 00006

08/19/20250001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/19/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The Purpose of this Amendment is to:

1.) The closing date has changed from 15-SEP-25 to 22-SEP-25 at 5:00 PM (CDT).

2.) Includes the following RFI questions and answers:

* Will a floor layout with dimensions be provided? Small one level house. See attached.

* Are there specifications for materials or will this be at the discretion of the

Contractor? Please let me know materials are for discussion. The roof material is in the

SOW. The siding should be hail resistant. The flooring should be waterproof. Deck material

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Margie Tahdooahnippah

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140A0425Q0003/0001 should be of weather treated wood.

* Will a percentage be given for the replacement of roof sheathing/insulation, siding, subfloor, sheetrock, plumbing, HVAC and electrical? Does the government want to account for 100% replacement or will findings after start of construction be per 52.236-2 Differing Site

Conditions? No percentage for roof sheathing. All siding to be replaced 100%. Sheetrock by visual assessment. Plumbing by assessment. No HVAC.

Electrical by assessment. 52.236-2 Differing Site

Conditions: should apply if a determination is made outside of initial assessment.

* Renovations: Contractor will identify any faulty appliances and inform facilities for replacement. Is the government (facilities) responsible for replacement and installation? We will replace faulty appliances.

* Who is the authority having jurisdiction for building, mechanical, electrical, and plumbing inspections? Most federal property and reservations conduct their own assessments; The

BIA facility manager has jurisdiction, oversees inspections along with independent assessment provided from an outside vendor.

All other terms and conditions of this solicitation remain the same and in full effect.

Period of Performance: 09/29/2025 to 12/31/2025