B08_ATTACHMENT__3_Bid_Schedule_B-119.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- BRIDGE REPLACEMENT CONSTRUCTION PROJECT Federal contract opportunity
- Solicitation number
- 140A0324R0003
About this file
This document contains a bid schedule and related federal contract opportunity notice. The bid schedule outlines specifications for a bridge replacement construction project for the Kickapoo Tribe, including item quantities, units, unit prices, and amounts for various construction activities. These include mobilization, clearing and grubbing, removal of existing structures, common excavation, compaction, entrance pipes, end sections, a field office, construction staking, water, signage, guardrails, foundation stabilization, curing, concrete seal course, temporary surfacing, excavation classes, structural concrete, reinforcing steel, steel piles, pile points, pile holes, riprap stone, geotextile fabric, aggregate base, erosion control, seeding, and traffic control. The related federal contract opportunity is solicitation number 140A0324R0003 for a bridge replacement construction project issued by the Bureau of Indian Affairs Southern Plains Region Department of the Interior.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09_AMEND__3_ATTACHMENT__1_Revised_Bid_Schedule_B-104_0003.xlsx | XLSX spreadsheet | |
| Sol_140A0324R0003_Amd_0003.pdf | ||
| Geotechnical_Report_BRIDGE_B104_0002.pdf | ||
| Sol_140A0324R0003_Amd_0002.pdf | ||
| REVISED_Bid_Schedule_B-119_0002.xlsx | XLSX spreadsheet | |
| PEBID_QUESTIONS_AND_ANSWERS_0002.docx | DOCX document | |
| Geotechnical_Report_BRIDGE_B119_0002.pdf | ||
| Sol_140A0324R0003_Amd_0001.pdf | ||
| B08_ATTACHMENT__5_WAGE_RATES.pdf | ||
| B08_ATTACHMENT__1_B119_Final_Plans.pdf | ||
| Sol_140A0324R0003.pdf | ||
| B08_ATTACHMENT__6__SF-24_BID_BOND_FORM.pdf | ||
| B08_ATTACHMENT__2_B104_Final_Plans.pdf | ||
| B08_ATTACHMENT__4_Bid_Schedule_B-104.xlsx | XLSX spreadsheet |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B119 BID SCHEDULE FINAL
KICKAPOO TRIBE BRIDGE B119
BID SCHEDULE - 2024-02-08
| Spec Sect | Item No. | ITEMS | QUANTITY | UNIT | UNIT PRICE | AMOUNT | |
| 801 | 25323 | Mobilization | 1 | L. S. | |||
| 201 | 256361 | Clearing and Grubbing | 1 | L. S. | |||
| 202 | 25200 | Removal of Existing Structures | 1 | L. S. | |||
| 205 | 12411 | Common Excavation | |||||
| 1550 | cu.yd. |
205 12332 Compaction of Earthwork (Type B)(MR-90) 150 cu.yd.
| 817 | 50775 | Entrance Pipe (24") | 30 | L.F. | |
| 817 | 54500 | End Section (24") | 2 | Ea. | |
| 803 | 25602 | Field Office and Laboratory (Type C) | 1 | Ea. | |
| 802 | 20100 | Construction Staking | 1 | LS. | |
| 200 | 10114 | Water (Grading)(Set Price) | 1 | M Gal. | |
| 812 | 14177 | Signing Object Markers (Type 3) | 4 | ea. | |
| 827 | 23447 | Guardrail, Steel Plate | 100 | L.F. | |
| 827 | 23448 | Guardrail End Section (SRT)(Alt.1) | 4 | Ea. | |
| 827 | 23410 | Guardrail End Terminal (FLEAT)(Alt. 2) | 4 | ea. | |
| 204 | 12340 | Foundation Stabilization (Set Price) | 1 | cu.yd. | |
| 405 | 40707 | Curing Environment | 1 | L.S. | |
| 204 | 71554 | Concrete for Seal Course (Set Price) | 1 | cu.yd. | |
| 840 | 11590 | Temporary Surfacing Material (Aggregate)(Set Price) | 1 | cu.yd | |
| 204 | 12400 | Class I Excavation | 103 | cu.yd | |
| 204 | 12401 | Class II Excavation | |||
| 74 | cu.yd | ||||
| 710 | 12073 | Concrete (Grade 4.0)(AE)(SW) | 232.9 | cu.yd | |
| 710 | 72350 | Concrete (Grade 4.0)(AE) | 80 | cu.yd. | |
| 711 | 25100 | Reinforcing Steel (Grade 60) | 66,750 | Lbs. | |
| 704 | 14069 | Piles (Steel)(HP 10x42) | 751 | L.F. | |
| 704 | 14053 | Test Piles (Special)(HP 10x42) | 90 | L.F. | |
| 704 | 14094 | Cast Steel Pile Points | 24 | Ea. | |
| 704 | 14240 | Pre-Drilled Pile Holes | 220 | L.F. | |
| 830 | 70974 | Slope Protection (Riprap Stone) | 608 | cu.yds | |
| 830 | 13209 | Geotextile Fabric | 197 | sq. yd | |
| 305 | 10169 | Aggregate Base (AB-3)(6") | 483 | sq. yd | |
| 902 | 72402 | Temporary Erosion & Pollution Control | 1 | L.S. | |
| 904 | 30148 | Seeding | 1 | L.S. | |
| 805 | 25324 | Traffic Control | 1 | L.S. | |
| SUB-TOTAL | |||||
| C.E.10% | |||||
| Grand Total |
B119 BID SCHED FINAL (2)
KICKAPOO TRIBE BRIDGE B119
BID SCHEDULE - 2024-02-08
| Spec Sect | Item No. | ITEMS | QUANTITY | UNIT | |
| 801 | 25323 | Mobilization | 1 | L. S. | |
| 201 | 256361 | Clearing and Grubbing | 1 | L. S. | |
| 202 | 25200 | Removal of Existing Structures | 1 | L. S. | |
| 205 | 12411 | Common Excavation | |||
| 1550 | cu.yd. |
205 12332 Compaction of Earthwork (Type B)(MR-90) 150 cu.yd.
| 817 | 50775 | Entrance Pipe (24") | 30 | L.F. | |
| 817 | 54500 | End Section (24") | 2 | Ea. | |
| 803 | 25602 | Field Office and Laboratory (Type C) | 1 | Ea. | |
| 802 | 20100 | Construction Staking | 1 | LS. | |
| 200 | 10114 | Water (Grading)(Set Price) | 1 | M Gal. | |
| 812 | 14177 | Signing Object Markers (Type 3) | 4 | ea. | |
| 827 | 23447 | Guardrail, Steel Plate | 100 | L.F. | |
| 827 | 23448 | Guardrail End Section (SRT)(Alt.1) | 4 | Ea. | |
| 827 | 23410 | Guardrail End Terminal (FLEAT)(Alt. 2) | 4 | ea. | |
| 204 | 12340 | Foundation Stabilization (Set Price) | 1 | cu.yd. | |
| 405 | 40707 | Curing Environment | 1 | L.S. | |
| 204 | 71554 | Concrete for Seal Course (Set Price) | 1 | cu.yd. | |
| 840 | 11590 | Temporary Surfacing Material (Aggregate)(Set Price) | 1 | cu.yd | |
| 204 | 12400 | Class I Excavation | 103 | cu.yd | |
| 204 | 12401 | Class II Excavation | |||
| 74 | cu.yd | ||||
| 710 | 12073 | Concrete (Grade 4.0)(AE)(SW) | 232.9 | cu.yd | |
| 710 | 72350 | Concrete (Grade 4.0)(AE) | 80 | cu.yd. | |
| 711 | 25100 | Reinforcing Steel (Grade 60) | 66,750 | Lbs. | |
| 704 | 14069 | Piles (Steel)(HP 10x42) | 751 | L.F. | |
| 704 | 14053 | Test Piles (Special)(HP 10x42) | 90 | L.F. | |
| 704 | 14094 | Cast Steel Pile Points | 24 | Ea. | |
| 704 | 14240 | Pre-Drilled Pile Holes | 220 | L.F. | |
| 830 | 70974 | Slope Protection (Riprap Stone) | 608 | cu.yds | |
| 830 | 13209 | Geotextile Fabric | 197 | sq. yd | |
| 305 | 10169 | Aggregate Base (AB-3)(6") | 483 | sq. yd | |
| 902 | 72402 | Temporary Erosion & Pollution Control | 1 | L.S. | |
| 904 | 30148 | Seeding | 1 | L.S. | |
| 805 | 25324 | Traffic Control | 1 | L.S. |
File details come from the government source that posted it. Updated .