B08_ATTACHMENT__1_B119_Final_Plans.pdf

PDF 30 MB Posted

Attached to
BRIDGE REPLACEMENT CONSTRUCTION PROJECT Federal contract opportunity
Solicitation number
140A0324R0003
Issued by
Department of the Interior Bureau of Indian Affairs Southern Plains Region

About this file

This document provides details for a federal contract opportunity for bridge replacement construction. The solicitation number is 140A0324R0003 from the Department of the Interior Bureau of Indian Affairs Southern Plains Region for a BRIDGE REPLACEMENT CONSTRUCTION PROJECT. The opportunity type is a solicitation to replace bridges. The attached file appears to include final plans for the bridge replacement project. No other salient details regarding response dates, pricing terms, set asides, or incumbent contractors are provided in this document.

View the file

Other files for this federal contract opportunity

Other files attached to BRIDGE REPLACEMENT CONSTRUCTION PROJECT, newest first.
File Type Posted
B09_AMEND__3_ATTACHMENT__1_Revised_Bid_Schedule_B-104_0003.xlsx XLSX spreadsheet
Sol_140A0324R0003_Amd_0003.pdf PDF
Geotechnical_Report_BRIDGE_B104_0002.pdf PDF
PEBID_QUESTIONS_AND_ANSWERS_0002.docx DOCX document
Sol_140A0324R0003_Amd_0002.pdf PDF
REVISED_Bid_Schedule_B-119_0002.xlsx XLSX spreadsheet
Geotechnical_Report_BRIDGE_B119_0002.pdf PDF
Sol_140A0324R0003_Amd_0001.pdf PDF
B08_ATTACHMENT__5_WAGE_RATES.pdf PDF
Sol_140A0324R0003.pdf PDF
B08_ATTACHMENT__6__SF-24_BID_BOND_FORM.pdf PDF
B08_ATTACHMENT__2_B104_Final_Plans.pdf PDF
B08_ATTACHMENT__3_Bid_Schedule_B-119.xlsx XLSX spreadsheet
B08_ATTACHMENT__4_Bid_Schedule_B-104.xlsx XLSX spreadsheet
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X X X X X X X X XX

X X

X X X X X X X X X X X X X X X X

XXX

T T T T T

T T T T

FL=1054.86FL=1056.02

T

X X

XXXXXX

X X X X X X X X X X X X X X X X X X X X X X X X X

XXXXXXXXX

T T T T T T T T T T T T T

T T T

T T T T T T T

100" TREE

120" TREE

120" TREE

200" TREE

50" TREE

50" TREE

50" TREE

50" TREE

50" TREE

50" TREE

50" TREE

50" TREE

60" TREE

60" TREE

60" TREE

60" TREE

60" TREE

T

1054 1054 10

106210

10561057

37 10 40 10

371038

10401041

10491045

10351033

40 1035

XXXXXXXXXXXX

X

X X X X X X X X X X X X X X X X X X

T T T T T T T T T T T

T T T T T T T

T

T

T T T

T T

T T T T T T T T T

T

58 105

37 10

10491045

EARTHWORK

RECAPITULATION OF ROAD QUANTITIES

RECAPITULATION OF BRIDGE QUANTITIES

STATION to STATION

EXCAVATION

COMMON ROCK

VMF

CONTR.

FURN.

CU.YDS.CU.YDS. VMFCU.YDS.

COMPACTION

CU.YDS. CU.YDS.

TYPE AA

MR-

TYPE B

MR-90

THROUGH CUTS

NOT SUBGRADED

CU.YDS. CU.YDS.

TYPE AACOMM. INITIAL

CONSOL. MENT CU.YDS.

PLACE.

SELECT

SOIL

EMBANKMENT

(CU.YDS.)

BRIDGE NUMBER STATION SEE SHEET NO.

SETTLE-

TOTALS

See General note.Subsidiary (see General Note).

24" x 20.6' Ent. Pipe

DRAINAGE STRUCTURES

Location

L Sta. 13+60

Station Side Size Type

Structure

(For Information Only)

GUARDRAIL, STEEL PLATE

Location Lin. Ft.

SRT End

Terminals (Alt. 1)

FLEAT End Terminals

(Alt. 2)

SW Quadrant SE Quadrant NE Quadrant NW Quadrant

25.00 25.00 25.00 25.00

Total 100.00 4 4

Entrance Pipe (Ft.) End. Sections (ea.)

Each

L.S.

L.S.

Cu. Yds.

Each

Cu. Yds.

L.S.

L.S.

Cu. Yds.

Cu. Yds.

Mgal.

L.F.

Each Each

L.S.

Lump Sum

Lump Sum

1,550 Lump Sum Lump Sum

Lump Sum

Signing Object Markers (Type 3)

Contractor Construction Staking Temporary Surfacing Material (Aggregate)(Set Price)

Water (Grading)(Set Price) Field Office and Laboratory (Type C)

Compaction of Earthwork (Type B)(MR-90)

Mobilization

Common Excavation Removal of Existing Structures Clearing and Grubbing

Concrete For Seal Course (Set Price) Foundation Stabilization (Set Price)

*Guardrail, Steel Plate Guardrail End Terminals (SRT)(Alt. 1) Guardrail End Terminals (FLEAT)(Alt. 2)

Curing Environment

See Sheet No. 28 for Temporary Erosion and Pollution Control Quantities.

See Sheet No. 35 for Seeding Quantities.

00000000000B119 Sheet No. 1415+15

1,550 150L Sta. 12+60 to Sta. 18+25 0.80

TOTAL

C

REMOVAL OF EXISTING

STRUCTURES

C

Cu.Yds.1

See Sheet No. 42 for Traffic Control Quantities.

See Sheet No. 14 for Bridge Quantities.

1,550 150

Existing BridgeL Sta. 15+04.80C

13+60 Rt. 24" Ent. Pipe 30.1 2

24" 24"

30.1 2

Each L.F.30.1

End Section (24") Entrance Pipe (24")

See Sheet No. 36 for Surfacing Quantities.

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SFSFSFSFSFSFSF

SF

SF

SFSFSF

SFSF

SFSF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF

SF SF

SF SF SF SF SF SF SF SF SF SF SF SF SF

SF

140th Rd.

140th Rd.

Recapitulation Of Quantities Work Zone Sign (Special)

Work Zone Signs

Lighted Devices

0-9.25

Sign No. 16.25 Sq.Ft. & Less 16.26 Sq.Ft. & Over

Sign No. 9.26-16.25 16.26 & Over Size - Sq.Ft.

Item Quantity Unit Work Zone Signs (O To 9.25 Sq.Ft.)

Work Zone Signs (9.26 To 16.25 Sq.Ft.)

Work Zone Signs (16.26 Sq.Ft. & Over)

Channelizer (Fixed) Channelizer (Portable)

Work Zone Warning Light (Type "A" Low Intensity) Work Zone Warning Light (Red Type "B" High Intensity) Arrow Display Portable Changeable Message Sign Pavement Marking (Temporary)

Solid (Line Masking Tape) Broken (Line Masking Tape)

Pavement Marking Removal Work Zone Sign (Special) (16.25 Sq. Ft. & Less) Work Zone Sign (Special) (16.26 Sq. Ft. & More) Temporary Raised Pavement Marker (Type I) Temporary Raised Pavement Marker (Type I) Traffic Signal Installation (Temporary) Traffic Control (Initial Set Up) Traffic Control Flagger (Set Price)

Lump Sum 1 Hour

Lump Sum Lump Sum Lump Sum

Each Each Each Each

Lin. Ft.

Sta./Line Sta./Line Sta./Line Sta./Line

Sta./Line

Sta./Line Sta./Line Sta./Line Sta./Line Sta./Line Sta./Line

Each Per Day Each Per Day Each Per Day Each Per Day

Each Per Day Each Per Day

Each Per Day Each Per Day Each Per Day Each Per Day

Arrow Display

Portable Changeable Message Sign

Channelizing Devices

Fixed Portable

Barricades

Sta./LineFlexible Raised Pavement Marker (4" Broken (8.0'))

Work Zone Barricades (Type 3 - 4' To 12')

Symbol (Type I) Symbol (Type II)

Quantity Most Used On The Project At Any One Time

Work Zone Warning Light (Type "A" Low Intensity)

Work Zone Warning Light (Red Type "B" High Intensity)

Type 3 (4' To 12')

Each Each

Summary Of Traffic Control Devices

(Each Per Day)

Summary Of Traffic Control Devices

(Each)

4" Broken (8.0') (Type I) 4" Broken (8.0') (Type II) 4" Broken (3.0') (Type I) 4" Broken (3.0') (Type II) 4" Dotted Extension (Type I) 4" Dotted Extension (Type II)

4" Solid (Type II) 4" Solid (Type I)

Each Per DayWork Zone Barricades (Pedestrian)

Channelizer (Pedestrian) Each Per Day

Flexible Raised Pavement Marker (4" Broken (3.0') )

PedestrianPedestrian

D ra w n

By

Fi le

U

SE

R N

AM

E$

Pl ot te d

D

G N

SP

EC

$S

YT

IM

E$

KD

O

TG

R P$

KANSAS DEPARTMENT OF TRANSPORTATION

File details come from the government source that posted it. Updated .