B11_Q_A_140A0125Q0021_9-4-2025_0002.docx

DOCX document 20 KB Posted

Attached to
Fire Suppression System 5-year Inspection at the W
Solicitation number
140A0125Q0021
Issued by

About this file

This document is a Questions and Answers (Q&A) file for a fire suppression system 5-year inspection solicitation (140A0125Q0021) issued by the Department of the Interior Bureau of Indian Affairs Northwest Region for the Walter Miner Law Enforcement Center. The solicitation involves a comprehensive inspection of a single wet pipe sprinkler system in one building, with key technical details including a 4" grooved fire department connection (FDC) with appropriate plugs/caps, no fire pump, and no antifreeze in the system.

The Q&A document reveals critical operational requirements, including that the prime contractor must hold a South Dakota fire suppression contractor license, work must be performed between 8 am and 5 pm with an escort due to the facility being a jail, and no current as-built drawings are available. Vendor questions addressed system specifics such as number of systems, inspection requirements, site access, and scheduling constraints. No specific pricing details or award dates are provided in the document, but the solicitation appears to be actively seeking qualified contractors for the 5-year fire suppression system inspection.

View the file

Other files

File Type Posted
Sol_140A0125Q0021_Amd_0003.pdf PDF
Sol_140A0125Q0021_Amd_0002.pdf PDF
Sol_140A0125Q0021_Amd_0001.pdf PDF
Sol_140A0125Q0021.pdf PDF
Attachment_2_IA_-_IEE_Representation_Form.pdf PDF
Attachment_3_Wage_Determination.pdf PDF
Attachment_1_Statement_of_Work.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140A0125Q0021 – Fire Suppression System 5-Year Inspection at the Walter Miner Law Enforcement Center Questions and Answers 8/21/2025 Request clarification and supporting reports regarding the facility’s wet pipe sprinkler system(s). Specifically, to determine:

Q1. How many wet pipe sprinkler systems are present at the site.

A1, It's one whole system for the building.

Q2. Whether multiple buildings are included under this solicitation.

A2. It’s one building.

Q3. Detailed reports or records related to the systems.

A3. We have attached the last inspection report.

8/27/2025 Q1. Could you please confirm whether the prime contractor must hold a South Dakota fire suppression contractor license to perform this work?

A1. The person(s) completing the work must be licensed.

Q2. If a state license is required, would the Government accept a licensed subcontractor fulfilling that portion, or must the prime itself be licensed?

A2. If this license is required then the Prime must be licensed.

9/4/2025 Q1. How many fire sprinkler systems and/or zones are present within the facility?

A1. One.

Q2. What is the type of each system (e.g., wet, dry, pre-action, deluge, antifreeze)?

• If any systems are filled with antifreeze, please specify which ones, as draining, refilling, and concentration testing will affect the quoted price.

• Please note: dry, pre-action, and deluge systems require full internal inspection every 5-year cycle. Wet systems are typically staggered, with half inspected during the first 5-year cycle and the remaining half on the next cycle.

A2. It is a wet system with no antifreeze that we know of.

Q3. Is there a fire pump supplying any of the fire sprinkler systems?

A3. Not that we know of.

Q4. Is a 5-year hydrostatic test of the FDC included in the intended scope?

• If so, please confirm the size and type of check valve on the FDC (grooved or flanged).

A4. 4” grooved.

• Are the exterior FDC connections equipped with the appropriate plugs/caps?

A4. Yes.

Q5. Is there a scissor lift or any other aerial lift available on site that we can use to access branch lines and cross mains, or will rental be required?

A5. Shouldn't be needed but we have a skid lift. Otherwise, no.

Q6. Are there any scheduling restrictions or blackout dates we should be aware of (e.g., during business hours, holidays, sensitive areas)?

A6. No holidays, no weekends, working hours are 8 am to 5 pm. One of our personnel will escort the contractor since this is a jail - for security purposes.

Q7. Are current as-built drawings or zone maps available for review?

A7. No.

Questions are listed on the date received by the Bureau of Indian Affairs from Vendors with the most current listed ones on top