14-Attachment D CIP 10323 Waters Ave FM 60% Technical Specs.pdf

PDF 5 MB Posted

Attached to
Waters Avenue Force Main Replacement CEI Services
Solicitation number
RPS-26-00423
Issued by
Hillsborough County, Florida

About this file

This is a 60% submittal technical specifications document prepared by Hillsborough County Water Resources Technical Services Department for the Waters Avenue Force Main Replacement project (CIP No. 10323). The specifications detail comprehensive construction requirements for the force main replacement, encompassing site work, concrete construction, and utility installation. The document includes detailed sections on site preparation, erosion and sedimentation control, seeding and sodding, tree protection and trimming, concrete formwork, concrete reinforcement, cast-in-place concrete, horizontal directional drilling, and wastewater force mains and appurtenances. The specifications establish quality assurance standards, material requirements, execution procedures, and field quality control protocols. Multiple sections reference Hillsborough County Standard Technical Specifications and incorporate modifications specific to this project. The document designates specific concrete compressive strengths (4,000 psi for structurally reinforced concrete, 3,000 psi for exterior work and flatwork), air entrainment requirements, curing procedures, and tolerance limits for construction. Special conditions address soil and material testing responsibilities, with the contractor required to employ testing laboratory services for soil compaction density and materials verification.

The project specifications mandate compliance with numerous industry standards including ACI, ASTM, AWWA, and FDOT standards. Contractors must submit detailed submittals including design mixes, product data, shop drawings, formwork design certified by Florida Registered Structural Engineers, and certificates of compliance for materials. The document establishes that the contractor bears full responsibility for formwork adequacy, concrete production quality, and overall construction execution. Construction must follow recognized erosion and sedimentation control procedures, with the contractor responsible for immediate remediation of any control measure deficiencies. Tree protection requirements include monthly certifications from a licensed tree surgeon regarding protection compliance. A 90-day landscape maintenance period is required following installation. All defective work, including concrete failing strength requirements or damaged surfaces, must be repaired or replaced at no additional cost to the county. The specifications impose strict environmental and quality controls, requiring contractor coordination with county inspectors and project managers, with concrete placement prohibited until 24-hour advance notice is provided and prior approvals are obtained.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

60% SUBMITTAL TECHNICAL SPECIFICATIONS

JUNE 2026

Hillsborough County Water Resources Technical Services Department

925 E. Twiggs Street Tampa, FL 33602

WATERS AVENUE

FORCE MAIN REPLACEMENT

CIP No. 10323 Prepared for

TOC-1

TABLE OF CONTENTS

WATERS AVENUE FORCE MAIN REPLACEMENT

TECHNICAL SPECIFICATIONS

DIVISION 0 – SPECIAL CONDITIONS

00700 Special Project Conditions .............................................................00700-1 – 1

DIVISION 1 – GENERAL REQUIREMENTS (NOT INCLUDED)

01010 Summary of Work ........................................................................01010-1 – 2

01040 Project Coordination .....................................................................01040-1 – 3

01300 Design-Builder Submittals ............................................................01300-1 – 5

01340 Shop Drawings, Product Data, and Samples ................................ 01340-1 – 12

01400 Quality Control ..............................................................................01400-1 – 3

01500 Temporary Facilities ......................................................................01500-1 – 6

01505 Mobilization ................................................................................... 01505-1 – 1

01560 Temporary Environmental Controls ............................................. 01560-1 – 2

DIVISION 2 – SITE WORK

02100 Site Preparation ...............................................................................02100-1 – 2

02260 Finish Grading ................................................................................02260-1 – 2

02276 Temporary Erosion and Sedimentation Control .............................02276-1 – 2

02485 Seeding and Sodding.......................................................................02485-1 – 2

02900 Tree Protection and Trimming ........................................................02900-1 – 3

DIVISIONS 3 – CONCRETE

031000 Forms and Formwork .....................................................................031000-1 – 6

032000 Concrete Reinforcement ................................................................032000-1 – 5

TOC-2

033000 Cast-in-Place Concrete ...................................................................033000-1 – 1

DIVISION 4 THROUGH 32 (NOT USED)

DIVISION 33 – UTILITIES

330523 Horizontal Directional Drilling .......................................................330523-1 – 7

330524 Boring and Jacking ........................................................................330524-1 – 7

333002 Wastewater Force Mains and Appurtenances ................................333002-1 – 24

339000 High Density Polyethylene Pipe .....................................................339000-1 – 7

DIVISIONS 34 THROUGH 46 (NOT USED)

APPENDICES

Appendix A 2025 Hillsborough County Public Utilities Standard Abbreviations

Appendix B 2025 Hillsborough County Public Utilities Approved Products and

Materials

00700-Special Project Conditions 1 / 1

SECTION 00700 - SPECIAL PROJECT CONDITIONS

PART 1 GENERAL

1.01 SCOPE OF WORK

A. These Special Conditions are intended to modify or supplement the Hillsborough County Public

Utilities Standard Technical Specifications and other provisions of the Contract Documents. To extend the extent such provisions are not modified or supplemented herein all provisions remain in full force and effect.

1.02 SOIL AND MATERIAL TESTING

A. For tests required by the Contract Documents, the CONTRACTOR shall be responsible for employing the services of a testing laboratory for soil compaction density and materials testing.

Additional testing may be required to verify compliance with these specifications and minimum criteria shown on the plans.

Modifications to the Hillsborough County Standard Technical Specifications:

NOTE: As the design progresses, required modifications to the Hillsborough County Standard Technical

Specifications will be listed here.

2.01 Changes to Specification Section 330523 Horizontal Directional Drilling

1. Part 2.0 ADD Part 2.3 High Density Polyethylene Pipe (see Specification Section 339000)

2. Part 2.1.2 ADD Specification 339000.

2.02 Changes to Specification Section 333002 Wastewater Force Mains and Appurtenances

1. Part 2.8.2 ADD unless otherwise noted on the drawings to the end of the sentence.

2. Part 3.1.1 Include 24” to the first column second row.

END OF SECTION

02100 - Site Preparation.docx 1 / 2

SECTION 02100 - SITE PREPARATION

A. This Section covers clearing, grubbing and stripping of the project site and/or along the pipeline route.

B. The Contractor shall clear and grub all of the area within the limits of construction or as required, which includes, but is not limited to utility easements. The width of the area to be cleared shall be reviewed by the County prior to the beginning of any clearing.

C. The Contractor's attention is directed to any Soil Erosion and Sediment Control Ordinances in force in Hillsborough County. The Contractor shall comply with all applicable sections of these ordinances.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION

3.01 CLEARING

The surface of the ground, for the area to be cleared and grubbed shall be completely cleared of all timber, brush, stumps, roots, grass, weeds, rubbish and all other objectionable obstructions resting on or protruding through the surface of the ground. However, trees shall be preserved as hereinafter specified unless otherwise designated by the County. Clearing operations shall be conducted so as to prevent damage to existing structures and installations and to those under construction, so as to provide for the safety of employees and others. Soil erosion control devices such as hay bales and silt fences shall be installed to satisfy all Federal, State and County requirements.

3.02 GRUBBING

Grubbing shall consist of the complete removal of all stumps, roots larger than 1-1/2 inches in diameter, matted roots, brush, timber, logs and any other organic or metallic debris not suitable for foundation purposes, resting on, under or protruding through the surface of the ground to a depth of

18 inches below the subgrade. All depressions excavated below the original ground surface for or by the removal of such objects, shall be refilled with suitable materials and compacted to a density conforming to the surrounding ground surface.

3.03 STRIPPING

In areas so designated, topsoil shall be stockpiled. Topsoil so stockpiled shall be protected until it is placed as specified. The County shall have the option to receive all excess topsoil materials. The

Contractor shall pay all equipment and labor cost to deliver excess topsoil material to a remote site chosen by the County within a five mile radius of the construction site. Should County not choose to receive any or all excess topsoil materials, the Contractor shall dispose of said material at no additional cost to County.

3.04 DISPOSAL OF CLEARED AND GRUBBED MATERIAL

The Contractor shall dispose of all material and debris from the clearing and grubbing operation by hauling such material and debris off site. The cost of disposal (including hauling) of cleared and grubbed material and debris shall be considered a subsidiary obligation of the Contractor; the cost of which shall be included in the prices bid for the various classes of work.

02100 - Site Preparation.docx 2 / 2

3.05 PRESERVATION OF TREES

Those trees which are not designated for removal by the County shall be carefully protected from damage. The Contractor shall erect such barricades, guards and enclosures as may be considered necessary by him for the protection of the trees during all construction operation.

3.06 PRESERVATION OF DEVELOPED PRIVATE PROPERTY

A. The Contractor shall exercise extreme care to avoid unnecessary disturbance of developed private property adjacent to proposed project site. Trees, shrubbery, gardens, lawns and other landscaping, which are not designated by the County to be removed, shall be replaced and replanted to restore the construction easement to the condition existing prior to construction.

B. All soil preservation procedures and replanting operations shall be under the supervision of a nursery representative experienced in such operations.

C. Improvements to the land such as fences, walls, outbuildings, and other structures which of necessity must be removed, shall be replaced with equal quality materials and workmanship.

D. The Contractor shall clean up the construction site across developed private property directly after construction is completed upon approval of the County.

3.07 PRESERVATION OF PUBLIC PROPERTY

The appropriate paragraphs of these Specifications shall apply to the preservation and restoration of public lands, parks, rights-of-way, easements, and all other damaged areas. This includes, but is not limited to, the trimming of trees damaged by Contractor's equipment.

02260 - Finish Grading.docx 1 / 2

SECTION 02260 - FINISH GRADING

1.01 WORK INCLUDED

A. The Contractor shall finish grade sub-soil.

B. The Contractor shall cut out areas to receive stabilizing base course materials for paving and sidewalks.

C. The Contractor shall place, finish grade and compact topsoil.

1.02 PROTECTION

The Contractor shall prevent damage to existing fencing, trees, landscaping, natural features, benchmarks, pavement and utility lines. Damage shall be corrected at no cost to the County.

PART 2 PRODUCTS

A. Topsoil: Shall be friable loam free from subsoil, roots, grass, excessive amount of weeds or other organics, stones, and foreign matter; acidity range (pH) of 5.5 to 7.5; containing a minimum of 4 percent and a maximum of 25 percent organic matter. The Contractor may use topsoil stockpiles on site if they conform to these requirements.

3.01 SUB-SOIL PREPARATION

A. The Contractor shall rough grade sub-soil systematically to allow for a maximum amount of natural settlement and compaction. Uneven areas and low spots shall be eliminated. Debris, roots, branches or other organics, stones, and sub-soil shall be removed by the Contractor and disposed of in a manner consistent with the latest Hillsborough County Standards as well as any affected regulatory agency. Should contaminated soil be found, the Contractor shall notify the County.

B. The Contractor shall cut out areas to sub-grade elevation to stabilize base material for paving and sidewalks and shall be compacted to 98 percent of the maximum dry density of the material as determined by AASHTO T-180 and shall have moisture content optimized to allow the required density.

C. The Contractor shall bring sub-soil to required profiles and contour graces gradually; and blend slopes into level areas.

D. The Contractor shall slope the structure grade a minimum of two (2) inches in ten (10) feet unless indicated otherwise on the Drawings.

E. The Contractor shall cultivate sub-grade to a depth of 3 inches where the topsoil is to be placed. He shall repeat cultivation in areas where equipment use has compacted sub-soil.

F. The Contractor shall not make grade changes which causes water to flow onto adjacent lands.

3.02 PLACING TOPSOIL

A. The Contractor shall place topsoil in areas where seeding, sodding and planting is to be performed.

He shall place from the following minimum depths, up to finished grade elevations:

02260 - Finish Grading.docx 2 / 2

1. 6 inches for seeded areas

2. 4-1/2 inches for sodded areas

3. 24 inches for shrub beds

4. 18 inches for flower beds

B. The Contractor shall use topsoil in a dry state as determined by the County. He shall place the material during dry weather.

C. The Contractor shall use fine grade topsoil eliminating rough and low areas to ensure positive drainage. He shall maintain levels, profiles and contours of the sub-grades.

D. The Contractor shall remove stone, roots, grass, weeds, debris, and other organics or foreign material while spreading the material.

E. The Contractor shall manually spread topsoil around trees, plants and structures to prevent damage which may be caused by grading equipment.

F. The Contractor shall lightly compact and place the topsoil.

3.03 SURPLUS MATERIAL

A. The Contractor shall remove surplus sub-soil and topsoil from site at his expense.

B. The Contractor shall leave stockpile areas and entire job site clean and raked, ready for landscaping operations.

02276 - Temporary Erosion and Sedimentation Control.docx 1 / 2

SECTION 02276 - TEMPORARY EROSION AND SEDIMENTATION CONTROL

1.01 DESCRIPTION

A. The work specified in this Section consists of the design, provision, maintenance and removal of temporary erosion and sedimentation controls as necessary.

B. Temporary erosion controls include, but are not limited to: grassing, mulching, netting, watering, and the reseeding of on-site surfaces and spoil and borrow area surfaces, interceptor ditches at ends of berms and other such work at those locations which will ensure that erosion during construction will be either eliminated or maintained within acceptable limits as established by the County.

C. Temporary sedimentation controls include, but are not limited to: silt dams, traps, barriers, and appurtenances at the foot of sloped surfaces which shall ensure that sedimentation pollution will be either eliminated or maintained within acceptable limits as established by the County.

D. The Contractor is responsible for providing effective temporary erosion and sediment control measures during construction or until final controls become effective.

1.02 REFERENCE DOCUMENTS

A. Florida Building Code.

B. FDEP/COE Dredge and Fill Regulations and/or Permit as applicable.

C. SWFWMD Permit Regulations and/or Permit as applicable.

D. Florida Stormwater, Erosion and Sedimentation Control Inspector’s Manual.

2.01 EROSION CONTROL

A. Netting - fabricated of material acceptable to the County.

B. Seed and sod.

2.02 SEDIMENTATION CONTROL

A. Bales - clean, seed free cereal hay type.

B. Netting - fabricated of material acceptable to the County.

C. Filter stone - crushed stone conforming to Florida Dept of Transportation specifications.

D. Concrete block - hollow, non-load-bearing type.

E. Concrete - exterior grade not less than one inch thick.

3.01 EROSION CONTROL

A. Minimum procedures for grassing shall be:

02276 - Temporary Erosion and Sedimentation Control.docx 2 / 2

1. Scarify slopes to a depth of not less than six inches and remove large clods, rock, stumps, roots larger than 1/2 inch in diameter and debris.

2. Sow seed within twenty-four (24) hours after the ground is scarified with either mechanical seed drills or rotary hand seeders.

3. Apply mulch loosely and to a thickness of between 3/4-inch and 1-1/2 inches.

4. Apply netting over mulched areas on sloped surfaces.

5. Roll and water seeded areas in a manner which will encourage sprouting of seeds and growing of grass. Reseed areas which exhibit unsatisfactory growth. Backfill and seed eroded areas.

3.02 SEDIMENTATION CONTROL

A. The Contractor shall install and maintain silt dams, traps, barriers, and appurtenances as shown on the approved descriptions and working drawings. Deteriorated hay bales and dislodged filter stone shall be replaced by the Contractor at his expense.

3.03 PERFORMANCE

A. The Contractor, at his own expense, shall immediately take whatever steps are necessary to correct any deficiencies of the temporary erosion and sediment control measures employed if they fail to produce results or do not comply with the requirements of the State of Florida or any other federal, governmental or regulatory agency.

02485 - Seeding and Sodding.docx 1 / 2

SECTION 02485 - SEEDING AND SODDING

A. The Contractor shall furnish all labor, materials and equipment necessary to satisfactorily return all construction areas to their original conditions or better.

B. Work shall include furnishing and placing seed or sod, fertilizing, planting, watering and maintenance until acceptance by County.

1.02 RELATED WORK NOT INCLUDED

Excavation, filling and grading required to establish elevation shown on the Drawings are included under other sections of these Specifications.

1.03 QUALITY ASSURANCE

A. It is the intent of this Specification that the Contractor is obliged to deliver a satisfactory stand of grass as specified. If necessary, the Contractor shall repeat any or all of the work, including grading, fertilizing, watering and seeding or sodding at no additional cost to the County until a satisfactory stand is obtained. For purposes of grassing, a satisfactory stand of grass is herein defined as a full lawn cover over areas to be sodded or seeded, with grass free of weeds, alive and growing, leaving no bare spots larger than 3/4 square yard within a radius of 8 feet.

B. All previously grassed areas where pipelines are laid shall be sodded. All sodding and grassing shall be installed in accordance with these Specifications or as directed by the County.

2.01 MATERIALS

A. Fertilizer: The fertilizer shall be of the slow-release type meeting the following minimum requirements: 12 percent nitrogen, 8 percent phosphorus, 8 percent potassium; 40 percent other available materials derived from organic sources. At least 50 percent of the phosphoric acid shall be from normal super phosphate or an equivalent source which will provide a minimum of two units of sulfur. The amount of sulfur shall be indicated on the quantitive analysis card attached to each bag or other container. Fertilizer shall be uniform in composition, dry and free flowing delivered to sites in original unopened containers bearing manufacturer's statement or guarantee.

B. Seeding/Grassing: The Contractor shall grass all unpaved areas disturbed during construction which do not require sod. All grassing shall be completed in conformance with FDOT Specifications, Sections 570 and 981. The grassed areas shall be mulched and fertilized in accordance with FDOT

Specifications, except that no additional payment will be made for mulching, fertilizing and/or watering.

C. Sodding: Sod shall be provided as required on the construction drawings or at locations as directed by the County in accordance with Florida Department of Transportation, Specifications Section 575 and 981. The Contractor shall furnish bahia grass sod or match existing sod. Placement and watering requirements shall be in accordance with FDOT Specifications Section 575, except that no additional payment will be made for placement and/or watering. This cost shall be included in the

Contract price bid for sodding.

D. Topsoil: Topsoil stockpiled during excavation may be used as necessary. If additional topsoil is required to replace topsoil removed during construction, it shall be obtained off site at no additional

02485 - Seeding and Sodding.docx 2 / 2 cost to the County. Topsoil shall be fertile, natural surface soil, capable of producing all trees, plants and grassing specified herein.

E. Water: It is the Contractor's responsibility to supply all water to the site, as required during seeding and sodding operations and through the maintenance period and until the work is accepted. The Contractor shall make whatever arrangements that may be necessary to ensure an adequate supply of water to meet the needs for his work. He shall also furnish all necessary hose, equipment, attachments and accessories for the adequate irrigation of lawns and planted areas as may be required. Water shall be suitable for irrigation and free from ingredients harmful to plant life.

3.01 INSTALLATION

A. When the trench backfill has stabilized sufficiently, the Contractor shall commence work on lawns and grassed areas, including fine grading as necessary and as directed by the County.

B. Finish Grading: Areas to be seeded or sodded shall be finish graded, raked, and debris removed.

Soft spots and uneven grades shall be eliminated. The County shall approve the finish grade of all areas to be seeded or sodded prior to seed or sod application.

C. Areas to be sodded shall be excavated or cut-down to accept the approximate 2” thick sod, so finish grade matches existing. Sod shall not be thrown over top of existing sod or debris.

D. Protection: Seeded and sodded areas shall be protected against traffic or other use by placing warning signs or erecting barricades as necessary. Any areas damaged prior to acceptance by the

County shall be repaired by the Contractor as directed by the County.

3.02 CLEANUP

Soil or similar materials spilled onto paved areas shall be removed promptly, keeping those areas as clean as possible at all times. Upon completion of seeding and sodding operations, all excess soil, stones and debris remaining shall be removed from the construction areas.

3.03 LANDSCAPE MAINTENANCE

A. Any existing landscape items damaged or altered during construction by the Contractor shall be restored or replaced as directed by the County.

B. Maintain landscape work for a period of 90 days immediately following complete installation of work or until County accepts project. Watering, weeding, cultivating, restoration of grade, mowing and trimming, protection from insects and diseases, fertilizing and similar operations as needed to ensure normal growth and good health for live plant material shall be included at no additional cost to the County.

3.04 REPAIRS TO LAWN AREAS DISTURBED BY CONTRACTOR'S OPERATORS

Lawn areas planted under this Contract and all lawn areas damaged by the Contractor's operation shall be repaired at once by proper soil preparation, fertilizing and sodding, in accordance with these

Specifications.

02900 – Tree Protection 1 / 3

02900 - TREE PROTECTION AND TRIMMING

1.01 GENERAL

A. All areas outside the limits of construction shall remain in their existing conditions and shall not be disturbed by the Contractor.

B. Trees within the limits of construction which are to remain and be protected and those which are to be transplanted, are shown on the drawings. If the status of any tree is in question, the Contractor shall request clarification from the County prior to any disturbance of the tree or its root system area.

1.02 REFERENCES

A. Tree and shrub transplanting manual, International Society of Agriculture, Latest Edition.

1.03 SUBMITTALS

A. The Contractor shall submit written certification, on a monthly basis, by the licensed, qualified tree surgeon that trees indicated to remain have been protected during the course of construction in accordance with recognized standards of the industry Hillsborough Land Alteration Ordinance, and the contract documents, and that where damage did occur trees were promptly and properly treated.

1.03 JOB CONDITIONS

A. The Contractor shall protect trees and other plants from damage by providing temporary barricades as delineated in the Contract Documents.

B. The Contractor shall protect root systems. Construction materials, debris, or excavated materials shall not be stored within the drip line, which is the outer perimeter of branches. Vehicles shall not be parked nor operated within the drip line. Foot traffic shall be restricted to prevent excessive compaction of soil over root systems.

1.04 QUALITY ASSURANCE

A. The Contractor shall engage a licensed, qualified tree surgeon to perform the following work:

1. Remove branches from trees which are to remain, if required to clear new construction.

2. Pruning shall not be required to compensate for loss of roots where roots are removed to accommodate new construction.

3. Perform tree repair WORK for damage incurred by new construction.

4. Limb up existing trees to remain, and transplanted trees, to a 10 feet clear trunk condition, except over roads.

5. Remove or prune limbs extending over roadway to a clearance of 15 feet from the surface of the road to the lowest branch.

6. Root prune existing trees to be retained in the R-O-W when excavation occurs with the canopy dripline or as directed by the County.

2.01 MATERIALS

A. Drainage Fill: Selected non-alkaline stone or gravel, graded to pass a 3 inches sieve and less than 5% retained on a 1-inch sieve; or lightweight aggregate conforming to ASTM C-330, equal to "Solite", manufactured by Northeast Solite Corp., Brooks, Kentucky.

B. Topsoil: As specified in Section 02260.

02900 – Tree Protection 2 / 3

C. Timber: 6 x 8 inches pine treated in accordance with AWPB Standard LP22.

D. PVC Pipe and Fittings: ASTM D2241, Schedule 40, solid pipe and pipe perforated with 360-degree hole spacing.

E. Filter Fabric: Equal to Mirafi 140N.

F. Sidewalk and Curb Root Barrier: Equal to Typar "Bio barrier", by TYPAR Geosynthetics, Inc.

G. Tree Pruning Compound: Waterproof, antiseptic, elastic and free of kerosene, coal tar, creosote, and other similar substances.

3.01 GENERAL

A. The Contractor shall protect tree root systems from damage due to noxious materials in solution, caused by run-off or spillage during mixing and placement of construction materials, or drainage from stored materials. Root systems shall be protected from flooding, erosion, or excessive wetting resulting from dewatering operations.

B. Fires shall not be allowed under or adjacent to trees or other plants which are to remain.

C. Branches shall be removed from trees which are to remain, if required to clear new construction, and meet project sight clearance of 17 feet clear trunk, as measured from the ground to the lowest limb.

D. Pruning shall be used only to balance limb weight of tree or for clearance as stated in 1-05.A. 4 & 5.

E. Branches and roots shall be cut, if required, with sharp pruning instruments; and shall not be broken or chopped. Cuts over ½ inch in size shall be painted with tree pruning compound.

3.02 EXCAVATION AROUND TREES

A. Excavation shall be accomplished within the drip line of trees only where indicated. Root pruning shall be required when excavation occurs with the canopy dripline or as directed by County.

B. Where trenching for utilities is required within the dripline, the Contractor shall tunnel, in accordance with paragraph 3.03, or hand excavate under or around roots. Main lateral roots or tap roots shall not be cut. Smaller roots which interfere with installation of new WORK may be cut if permission is granted by the County.

C. Exposed roots shall not be allowed to dry out before permanent backfill is placed. The Contractor shall provide temporary earth cover, or pack with peat moss and wrap with burlap. Roots shall be watered and maintained in a moist condition, temporarily supported, and protected from damage until permanently relocated and covered with earth.

3.03 LOWERING GRADES AROUND TREES

A. Where new finish grade around trees is shown to be lower than existing grade, a tree retaining wall

OR a SLOPE OF 2.1 shall be constructed as shown on the drawings. Roots exposed by excavation shall be pruned by a tree surgeon prior to the excavation activity.

3.04 RAISING GRADES AROUND TREES

A. Minor Fills: Where proposed finish grade is shown to be up to 4 inch or less existing grade, a clean course sand fill material shall be used to bring the area to grade. Sand shall be placed in a single layer without compaction, hand graded to the required finish elevations.

B. Moderate Fills: Where proposed finish grade is shown to be more than 4-inch, but less than 6 inches, 02900 – Tree Protection 3 / 3 above existing grade elevation, the Contractor shall place a 8 inches layer of drainage fill on existing grade, covered by a layer of filter fabric, prior to placing topsoil. Stone or gravel layers shall not be compacted. Topsoil layers shall be lightly compacted utilizing hand operated equipment. Hand grade to required elevations. Where required, tree retaining walls shall be installed as shown on the drawings. The system shall be inspected and approved by the County before placing fill or topsoil over the filter fabric.

C. Major Fills: Where proposed finish grade is shown to be more than 6 inches above existing grade elevation, the Contractor shall construct a "Tree Well Aeration System", as shown on the drawings, to protect the root system from damage during and after construction. Stone or gravel layers shall not be compacted. Topsoil layers shall be lightly compacted utilizing hand operated equipment. The system shall be inspected and approved by the County prior to placing fill or topsoil over the layer of filter fabric.

3.05 DISPOSAL

A. Excess displaced trees, trimmings, or other debris are the property of the Contractor and are to be removed from the site. Burning or burial of trees or trimmings on site shall not be allowed.

3.07 REPAIR AND REPLACEMENT OF TREES

A. Repair trees and vegetation damaged by construction operations. Make repair promptly after damage occurs to prevent progressive deterioration of damaged trees. Repairs shall be made at the

Contractor’s expense.

B. The Contractor shall remove and replace dead, damaged, or unhealthy trees and vegetation which are determined by the County to be incapable of restoration to normal growth pattern.

October 2025 Specification 031000 | 1

DIVISION 03 – CONCRETE

SPECIFICATION 031000:

FORMS AND FORMWORK

PART 1.0 GENERAL

1.1 DESCRIPTION

The work of this specification includes furnishing of all labor, materials, equipment and incidentals to install, adjust, and remove all formwork required for the forming of cast-in-place concrete, as shown on the Construction Drawings and as specified herein. Forms must be either wood or steel designed to meet the conditions specified herein.

1.2 REFERENCE DOCUMENTS

• American Concrete Institute (ACI)

• American National Standards Institute (ANSI)

• American Plywood Association (APA)

• National Institute of Standards and Technology (NIST)

• NSF International (NSF)

• Codes and regulations of jurisdictional authorities

1.3 SUBMITTALS

1.3.1 Submit product technical data including:

Acknowledgement that products submitted meet the requirements of the referenced standards.

Manufacturer’s installation instructions.

Manufacturer’s type of proposed form materials.

Manufacturer’s type of proposed form ties.

Manufacturer’s type of proposed form coating material.

1.3.2 If forms and formwork are in contact with potable water, any form release agent must be NSF 61 certified.

1.3.3 Submit formwork layout plans, design data, and procedures certified by a Florida Registered Structural Engineer when requested by the Project Manager or Hillsborough County Inspector.

1.3.4 Submit a copy of any design exception prior to installation. Design exceptions are issued by the Utility Design Section Manager. Any deviation from the specifications requires a design exception.

1.4 RELATED WORK

• Specification 032000, Concrete Reinforcement

• Specification 033000, Cast-In-Place Concrete

• Hillsborough County Standard Lift Station Drawings

• Specification 333003, Wastewater Lift Stations

October 2025 Specification 031000 | 2

PART 2.0 PRODUCT

2.1 QUALITY ASSURANCE

2.1.1 The formwork must be designed and erected in accordance with ACI 117 “Specifications for Tolerances for Construction and Materials”; ACI 301 ”Specification for Concrete Construction”, ACI 318 ”Building Code requirements for Structural Concrete”, ACI 347 "Guide to Formwork for Concrete" for the loads, lateral pressure, and allowable stresses; and for design considerations, wind loads, allowable stresses and other applicable requirements of the local building code. The design and construction of the formwork must be the responsibility of the Contractor. Form design must be certified by a Professional Structural Engineer currently registered in the State of Florida.

2.1.2 The formwork must be true in every respect to produce hardened concrete to the required shape, size, grade, and alignment as indicated on the Construction Drawings, and of sufficient strength, bracing, and rigidity to maintain their position and shape under the loads and operations incidental to placing and curing the concrete, as well as other forces resulting from the movement of the forms.

The forms must be mortar-tight at the time concrete is placed in them and must be so constructed that the surfaces of the finished concrete will be reasonably free from ridges, fins, offsets, or similar defects. The Contractor under the guidance of the EOR must use a form release that does not adversely affect concrete surfaces to be painted, coated, or otherwise finished and does not affect the forming material. Form release agents used in potable water containment structures must be nontoxic and free of taste or odor. Adequate and suitable means for removing the forms without injury to the surfaces or edges of the finished concrete must be provided.

2.1.3 Formwork must be constructed such that the hardened surfaces must conform to the tolerance limits of ACI 347, and the values listed in Specification 033000, whichever is more stringent.

2.2 FORMS AND ACCESSORIES

2.2.1 Use smooth forms on all concrete surfaces exposed to view or water.

2.2.2 Plywood forms must be new 5/8 or 3/4-inch 5-ply structural plywood grade marked Exterior Grade, B-B Concrete Form or High-Density Overlay (HDO) Concrete Form B-B, conforming to the requirements of the NIST Voluntary Product Standard PS-1, Plywood.

2.2.3 Steel Forms will use smooth metal plate free of surface irregularities. Steel forms must be thoroughly cleaned, and mill scale and other ferrous deposits must be sandblasted or otherwise removed from the contact surface for all forms except those utilized for surfaces receiving a rough finish. All forms must have the contact surfaces coated with a form release agent.

2.2.4 Rough forms (not exposed to view or water) must be constructed of dressed or undressed lumber or plywood free of knots, splits, or other defects.

2.2.5 Form ties will be factory fabricated, snap-off metal type of adequate design to minimize form deflection and preclude concrete spalling upon removal.

2.2.6 Form ties will be fabricated so that set back in the concrete is such that the portion of the tie remaining after snap-off and removal of the exterior portions is at least 1-1/2 inches back from the concrete surface.

October 2025 Specification 031000 | 3

2.2.7 Form coating must comply with ACI 347 and must be non-grain-raising and non-staining resin or polymer type that will not leave residual matter on the surface of the concrete or adversely affect bonding to concrete of paint, plaster, mortar, protective coatings, waterproofing or other applied materials. For concrete surfaces contacting potable stored water, the coatings and form release agents must be completely non-toxic and approved by the EPA for the intended use.

2.2.8 All forms must be designed and constructed to provide a flat, uniform concrete surface requiring minimal finishing and repairs.

2.2.9 All joints or gaps in forms must be taped, gasketed, plugged, and/or caulked with an approved material so that the joint will remain watertight and will withstand placing pressures without bulging outward or creating surface patterns.

2.3 PRODUCT DELIVERY, STORAGE, AND HANDLING

Store and handle form coating to prevent contamination of coating in accordance with manufacturer's recommendation.

PART 3.0 EXECUTION

3.1 FABRICATION

3.1.1 Use forms that conform to ACI 347. Fabricate with facing materials that produce the specified tolerance requirements of ACI Special Publication No. 4, Formwork for Concrete, produce true surfaces, sharp corners and true lines and are free of offsets, ridges, bulging, waves and concave or convex areas. Forms must be sufficiently rigid to withstand construction loads and vibration and to prevent displacement or sagging between supports. Construct forms such that the concrete and/or exposed rebar (dowels) will not be damaged by their removal. The Contractor must be entirely responsible for the adequacy of the forming system.

3.1.2 Use regular and uniform pattern: long dimensions of panels must be vertical; joints horizontal, vertical, and aligned; form ties uniformly spaced and aligned in horizontal and vertical rows.

3.2 PREPARATION

3.2.1 Forms must not be reused if there is any evidence of surface wear and tear or defects which would impair the quality of the surface. All surfaces of forms and embedded materials must be cleaned of any mortar from previous concreting and of all other foreign material or water before coating is placed on them.

3.2.2 Forms must be coated in accordance with manufacturer's recommendations before the form or reinforcement is placed in final position. Surplus coating on form surfaces, or any coating on reinforcing steel and construction joints must be removed before placing concrete.

3.3 INSTALLATION, REMOVAL, AND SHORING

3.3.1 Installation of forms will comply with the following requirements:

October 2025 Specification 031000 | 4

Forms must be sufficiently tight to prevent loss of mortar from the concrete, set true to the lines and elevations indicated on the Drawings, tied, and braced to remain true during and after concrete placement within tolerances of Part 2.1 of this Specification. The Project Manager or Hillsborough County Inspector may at any time condemn any section or sections of forms found deficient in any respect, and such form must be promptly removed and replaced.

No wooden spreaders must be allowed to remain in the concrete.

Place chamfer strips in forms to bevel all corners, edges, joints and other structural elements exposed to views, including use of dummy chamfer and false joints to provide neat and uniform appearance. Exposed corners and edges must have 3/4-inch by 3/4-inch with 45- degree chamfers, unless otherwise indicated on the Construction Drawings.

Provide temporary openings at the base of wall forms and at the other points when necessary to facilitate cleaning and inspection immediately before depositing concrete.

Secure in position wedges used for final alignment and items to be embedded in concrete.

Forms for keyways must be prepared in advance of pouring concrete. Keyway forms in slab edges and vertical wall joints must be rigidly secured in place before the concrete is poured. Forms for keyways for horizontal joints in walls may be placed at the conclusion of the pour, but proper provision must be made for obtaining and holding the full depth and form of the keyway.

3.3.2 Adjustment of forms will comply with the following requirements:

Positive means of adjustment must be provided to permit realignment or readjustment of shores if excessive settlement occurs.

A pair of wedges may be used at the top or bottom of shores, but not at both ends, to facilitate vertical adjustment, to correct uneven settlements, or to facilitate dismantling of the formwork.

Screw jacks for pipe shores or scaffold-type shoring may be used both top and bottom so long as they are secured by the shore or scaffold leg against loosening or falling out, to avoid lateral deflections.

During and after concreting, but before initial set of the concrete, the elevations, camber, and plumbness of formwork systems must be checked, using telltale devices.

Appropriate adjustments must be promptly made where necessary. If, during construction, any weakness develops and the formwork shows any undue settlement or distortion, the work must be stopped, the affected construction removed if permanently damaged, and the formwork strengthened.

3.4 EMBEDDED ITEMS

3.4.1 Items to be embedded in concrete must be free from oil or foreign matter that would weaken the bonding of the concrete to these items.

3.4.2 Install in the formwork requisite inserts, anchors, sleeves, and other items specified under other sections of these Specifications. Close ends of conduits, piping, and sleeves embedded in concrete with caps or plugs.

3.4.3 Concrete pads, curbs, pedestals, and similar means devised by the Contractor to support the forms will be subject to review by the Project Manager or Hillsborough County Inspector.

3.4.4 Before depositing concrete, check the location and support of items which are to be wholly or partially embedded.

October 2025 Specification 031000 | 5

3.4.5 Place reinforcement so that there will be a clear distance of at least two inches between the reinforcement and any anchor bolts or other embedded metal work.

3.5 FIELD QUALITY CONTROL

3.5.1 Construct elements to meet the allowable tolerances of the dimensions, elevations, and positions specified in Specification 033000.

3.5.2 Deposit concrete only when the forms and placement of the reinforcement has been checked and approved by the Project Manager or Hillsborough County Inspector. The Contractor must provide notice to the Project Manager or Hillsborough County Inspector at least 24 hours in advance of any contemplated concrete pour.

3.5.3 Failure of the forms to comply with the requirements specified herein, or to produce concrete complying with the requirements of this Section, in the opinion of the EOR, the Project Manager, or Hillsborough County Inspector, will be grounds for rejection of that portion of the form/concrete work. Rejected work must be repaired or replaced as directed by the EOR or Hillsborough County Inspector at no additional cost to the County. Such repair or replacement will be subject to the requirements of this Section and approval of the EOR.

3.6 JOINTS

3.6.1 Unless otherwise directed, make contraction, expansion, and construction joints only where shown.

3.6.2 Continue reinforcing steel and wire fabric across construction joints which are not indicated as being free to move.

3.7 REMOVAL OF FORMS, FALSE WORK, AND CENTERING

3.7.1 Maintain forms, false work, and centering in place until the concrete has attained the minimum percentage of the design strength and met the criteria specified below in both 3.7.2 and 3.7.3. The design strength must include the strength of the concrete structural member(s) to carry their own weight and any loads to which they will be subjected without exceeding the permissible concrete stresses and without deforming.

3.7.2 Maintain forms, false work, and centering in place until the concrete has attained the minimum percentage of specified design strength listed in the following table and 3.7.3

Minimum Percent of Specified Design Strength

Structural Member Schedule 1 Footings; Inverts, sides of beams, slabs and girders;

Slabs and beams on grade

40%

Open cut structure exterior walls; Retaining walls 60% Soffits and beams; Slabs and girders under 20 feet clear span between supports

80%

Cantilevers and intersecting sections 90%

3.7.3 Maintain forms, false work, and centering for listed and non-listed members until the concrete has attained the minimum specified strength and at least one of the following criteria has been met:

October 2025 Specification 031000 | 6

The Project Manager has approved calculations showing the anticipated concrete strengths at the time of the proposed early removal based on:

a) Ratio of dead load over live load;

b) Span, height and shape;

c) Ratio of rise over span;

d) Shoring;

e) Loads, resultant stresses, and deformations to which the concrete and reinforcing steel will be subject at the time of removal, subsequent to the removal and until the concrete has attained its design strength;

f) Prevailing site conditions.

The concrete strength attained prior to form removal has been determined from tests of cylinders cured adjacent to and under the same conditions as the placed concrete.

Three test cylinders taken by the test laboratory have been tested by an independent testing laboratory retained by the Contractor and approved by the Project Manager or Hillsborough County Inspector and the tests performed in accordance with Specification 033000.

3.7.4 Do not alter the loading conditions on the concrete after the removal of the forms if it results in exceeding the permissible stresses and deformation at the attained concrete strengths.

3.7.5 If formwork is removed from a surface prior to the specified curing period, provide curing and protection per Specification 033000, Part 3.6.

October 2025 Specification 032000 | 1

SPECIFICATION 032000:

CONCRETE REINFORCEMENT

PART 1.0 GENERAL

1.1 DESCRIPTION

Furnish all labor, materials, equipment, and incidentals to install all steel bars, steel wire, fiber and wire fabric required for the reinforcement of concrete, as shown on the Construction Drawings and as specified herein.

1.2 REFERENCE DOCUMENTS

• American Concrete Institute (ACI)

• American Society for Testing and Materials (ASTM)

• American Welding Society (AWS)

• Concrete Reinforcing Steel Institute (CRSI)

• Codes and regulations of jurisdictional authorities.

1.3 SHOP DRAWINGS AND SUBMITTALS

1.3.1 Detail reinforcing in accordance with the requirements of ACI MNL-66 Detailing Manual

1.3.2 Shop drawing submittals must include bar lists and bending diagrams showing the individual weight of each bar; the total weight of each bar size; and the total weight of bars on the list. Bars to have special coatings and/or to be of special steel or special yield strength must be clearly identified.

1.3.3 Submit certified copies of mill tests on each steel proposed for use showing the physical properties of the steel and chemical analyses.

1.3.4 Have testing performed in accordance with ASTM A615 as modified by ACI 318 Building Code Requirements for Structural Concrete.

1.3.5 Submit certificates stating that materials meet the specified requirements.

1.3.6 Submit a copy of any design exception prior to installation. Design exceptions are issued by the Utility Design Section Manager. Any deviation from the specifications requires a design exception.

1.3.7 Welder certifications must be in accordance with AWS D1.4 when welding of reinforcement is required.

1.4 RELATED WORK

• Cast-In-Place Concrete, Specification 033000

• Forms and Formwork, Specification 031000

October 2025 Specification 032000 | 2

2.1 GENERAL

2.1.1 All reinforcement steel must be of the grade and type as specified herein or indicated on the Construction Drawing. Bars must be bent cold to the shapes and dimensions as indicated in the Construction Drawings, or as required by the current "Manual of Standard Practice" of the CRSI.

Steel must not be bent or straightened in a manner that will injure the material. Bars with kinks or improper bends must not be used.

2.1.2 Reinforcing steel must be substantially free from mill scale, rust, grease, or other foreign matter.

2.1.3 The diameter of bend measured on the inside of the bar for standard hooks, other than stirrups and tie hooks, must not be less than the values in the following table.

Bar Size Minimum Diameter

#3 through #8 6 bar diameters #9, #10, and #11 8 bar diameters

#14 and #18 10 bar diameters

2.2 QUALITY ASSURANCE

2.2.1 In no case must any reinforcing steel be covered with concrete until the installation of the reinforcement, including the size, spacing, and position of the reinforcement, has been observed by the EOR, or Hillsborough County Project Manager or Inspector, and they accept the installation and authorize the Contractor to proceed with concrete placement.

2.2.2 All testing agencies must meet the requirements of "Recommended Practice for Inspection and Testing Agencies for Concrete, Steel and Bituminous Materials as Used in Construction", ASTM E329.

2.2.3 Qualifications:

Welding Operators, processes, and procedures to be qualified in accordance with AWS

D1.4.

Welding operators to have been qualified during the previous 12 months prior to commencement of welding.

2.2.4 Cut and bend reinforcing steel to conform to the dimensions shown and within the following tolerances:

Reinforced Steel Tolerance Sheared length +1 inch

Stirrups, ties, and spirals +1/2 inch All other bends +0, -1/2 inch

2.3 MATERIAL

2.3.1 Reinforcing Bars: Deformed and Plain Billet-Steel Bars:

• ASTM A615, Grade 60, deformed of USA Manufacture.

• Low Alloy Steel Deformed Bars: ASTM A706.

October 2025 Specification 032000 | 3

2.3.2 Welded Wire Fabric: Conform to ASTM A185 or ASTM A497, with the gauge and mesh as indicated on the Plan.

2.3.3 Plain Tie Wire: Conform to Cold Drawn Steel Wire for Concrete Reinforcement, ASTM A82, 16 gauge minimum.

2.3.4 Coated Tie Wire: Epoxy-coated reinforcing bars must be tied with plastic-coated, epoxy-coated, or nylon-coated tie, 16 gauge minimum.

2.3.5 Metal Bar Supports

Type 1, Standard: All metal bar supports must be fabricated from cold-drawn steel wire in accordance with current CRSI Standards.

Type 2, Stainless Steel Protected: Must be Type 1, with stainless steel wire conforming to ASTM A493 attached to the tips of the support so the non-stainless wire will lie no closer than 1/4 inch from the form surface.

Type 3, Plastic Protected: Must be of Type 1, with plastic coating of polyethylene conforming to ASTM D1248 on the legs and tips.

2.3.6 Concrete Bar Supports: Precast Concrete Brick Supports Conform to ASTM C55, Type 1 Grade N.

2.4 PRODUCT DELIVERY, STORAGE, AND HANDLING

2.4.1 Ship reinforcing steel in bundles.

2.4.2 Tag each bundle at the mill with a waterproof tag, in accordance with "Manual of Standard Practice" of the CRSI, showing the name of the mill, heat number, grade, size and identifying number. Mark designation must be the same as those shown on the submitted placement drawings.

2.4.3 Concrete reinforcement must be stored above ground on platforms or other supports, in an orderly manner to facilitate inspection and checking, and be protected from physical damage, moisture, and kept free from dirt, oil, or other injurious contaminants.

3.1 CUTTING AND BENDING – REINFORCEMENT

Do not bend bars in the field except to correct minor errors or damage in shipment or handling, or to make shipment of certain bars practicable. Bending must be in accordance with Part 2.1.

Welding of reinforcement will not be permitted.

3.2 BAR SUPPORTS AND SPACERS

3.2.1 Support bars by means of bolsters or chairs with no less than the minimum required by ACI MNL- 66 Detailing Manual.

3.2.2 Reinforcing steel in slabs resting on earth must be supported by bolsters or chairs with a base plate to prevent any sinking. Welded wire fabric supports must be spaced at 3 feet or less. Spacing must be reduced if the reinforcement deflects by more than 1/2 inch.

3.2.3 Hold reinforcing steel in position in walls, columns, piers, and abutments by means of bar supports, or spacers wired to reinforcing steel.

October 2025 Specification 032000 | 4

3.2.4 Do not use stones, clay bricks, wood blocks, or pieces of broken concrete to support reinforcing steel.

3.2.5 Do not place bars or fabricated mats on layers of fresh concrete as the work…