1386968-event.pdf

PDF 369 KB Posted

Attached to
Tipton Building Re-Roof
Solicitation number
645-DOTRFQ-2734-2026
Issued by
Muscatine County, Iowa

About this file

This is a Request for Quote (RFQ) document issued by the Iowa Department of Transportation (Iowa DOT) for the Tipton Maintenance Garage roof replacement project. The Iowa DOT is seeking competitive quotes for the removal of existing shingles and re-roofing with metal panels at the Tipton Maintenance Garage according to attached project manuals and plans. The RFQ was posted on May 14, 2026, with a submission deadline of May 28, 2026, at 1:00 PM CDT. The estimated project completion date is July 15, 2026, with the contract commencing upon issuance of the Notice to Proceed. Site visits are available at the contractor's discretion with 24-hour advance notice required by emailing Kyle Williams at Kyle.Williams@iowadot.us. The award will be made to the responsible bidder whose submission is most advantageous to the Iowa DOT, considering cost and other factors including mandatory requirements, proposed staffing, time schedule compliance, past work performance, and work capacity. A Notification of Intent to Award and bid tabulation will be posted publicly on the IMPACS Business Opportunities site following evaluation.

Payment terms are Net 60 with F.O.B. Destination shipping. The Iowa DOT is a tax-exempt agency and will provide tax exemption certificates upon request; Davis-Bacon wages do not apply. Bidders must be registered with the Iowa Department of Workforce Development Division of Labor according to Iowa Code Chapter 91C and must provide their contractor number. All bidders must disclose lead times for any fabricated or custom-built materials and provide estimated project completion timelines. If the contract award exceeds $25,000, the successful bidder must furnish a performance and payment bond covering 100 percent of the contract value. All work shall be performed under direct Iowa DOT supervision with periodic site inspections, and contractors must provide at least 24 hours' notice before installation begins. The contractor must maintain required insurance coverage as specified in the Standard Terms and Conditions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

14 May 2026

Tipton Building Re-Roof Tipton Building Re-Roof

14 May 2026

Open 5/14/2026 1:00 PM CDT Type DOT Request for Quote Close 5/28/2026 1:00 PM CDT Number 645-DOTRFQ-2734-2026 Currency US Dollar

Sealed Until 5/28/2026 1:00 PM CDT

Payment Terms 0% 0, Net 60

14 May 2026

Contacts Kyle Williams Kyle.Williams@iowadot.us

Phone +1 515-233-7960

14 May 2026

Commodity Codes Commodity Code Description 90638 General Construction, Architectural Services

90900 BUILDING CONSTRUCTION SERVICES, NEW, INCLUDING MAINTENANCE AND

REPAIR SERVICES

90924 Building Construction, Commercial and Institutional 91066 Roofing, Gutters, and Downspouts Maintenance and Repair Services 91473 Roofing and Siding 92581 Roofing Engineering

14 May 202614 May 202614 May 202614 May 202614 May 202614 May 202614 May 202614 May 202614 May 2026 mailto:Kyle.Williams@iowadot.us

Overview

The Iowa DOT is seeking competitive quotes for the removal of existing shingles and re-roof with metal panels at the Tipton Maintenance Garage as per the attached Project Manual and Plans documents (Buyer Attachment). The Iowa DOT bidding process is subject to the procedures and requirements established in Iowa Administrative Code 761--20.

Shipping Terms

Deliveries shall be F.O.B Destination.

Award - Cost and Other Factors

It is the intent of the Iowa DOT to award the contract to the responsible bidder whose submission is the most advantageous to the Iowa DOT, cost and other factors considered. Other factors include, but are not limited to: meeting or exceeding mandatory requirements, proposed staffing, and meeting required time schedule. Other factors may also include a comprehensive review of bidders past work performance, and work capacity.

Notification of Intent to Award

After responses are evaluated, a Notification of Intent to Award (NOIA) and bid tabulation will be posted publicly on the IMPACS Business Opportunities site.

Communication

Until a contract is awarded, the sole point of contact for this bid opportunity will be the Purchasing Agent listed in the event. All questions must be directed solely to the Purchasing Agent and will not be accepted after the Q&A Submissions Close Date. Bidders are strongly encouraged to submit all questions through the Q&A Board. Responses to questions will be posted on the Q&A Board.

Contract Term

DOT estimated start date: Upon issuance of Notice to Proceed

DOT estimated completion date: July 15, 2026

DOT Responsibility-Inspection and Supervision

• All work shall be according to the approved design and shall be under the direct supervision of the Iowa DOT.

• Periodic site inspections will be carried on by the Iowa DOT with the Contractor to ensure coordination of the project.

• The Iowa DOT will provide a list of items requiring inspection prior to or during installation. The Contractor is to give the Iowa DOT notice no less than 24 hours in advance of installation.

• The Iowa DOT point of contact after the contract award shall be determined.

Site Visits

A site visit is at the discretion of the contractor. To schedule a site visit please email Kyle Williams at Kyle.Williams@iowadot.us with the requested date and time for the visit. Please give a 24-hour notice in advance of the requested date. Any questions that arise during the site visit must be emailed to the Purchasing Agent listed above or submitted through the Q & A Board on the solicitation.

Description https://bids.sciquest.com/apps/Router/PublicEvent?tab=PHX_NAV_SourcingClosed&CustomerOrg=DASIowa&SourcingPublicSite_FILTER_BY_BUSINESS_UNIT=undefined&SourcingPublicSite_FILTER_BY_BUSINESS_UNIT_buDisplayName=&SimpleSearch_Keyword=&tmstmp=1741986176410

Tax Exemption

The Iowa Department of Transportation is a tax-exempt agency. Tax exemption certificates will be provided upon request.

Davis-Bacon wages do not apply.

Required to View Event

Prerequisites Required to Enter Bid

14 May 2026

1. Bidder shall certify that they have read, understand, and accept.

2. Bidder shall certify that they have read, understand, and accept.

3. Bidder shall certify that they have read, understand, and accept.

4. Bidder shall certify that they have read, understand, and accept.

5. Bidder shall certify that they have read, understand, and accept.

6. Bidder shall certify that they have read, understand, and accept.

7. Bidder shall certify that they have read, understand, and accept.

14 May 202614 May 202614 May 202614 May 202614 May 202614 May 202614 May 2026

Buyer Attachments

1. Project Manual - D6-TIPTON MG ADDITION ROOF REPAIR 05-08-2026 02-37-22 PM.pdf

2. Plans - 20 MAR 2-26_D6_Tipton _DC.pdf

14 May 202614 May 202614 May 202614 May 202614 May 202614 May 2026 https://bids01.jaggaer.com/apps/Router/PublicEventDownload?file=U291cmNpbmdldmVudC8xMzg2OTY4LTIwMjQxMTI3NjNQcm9qZWN0IE1hbnVhbCAtIEQ2LVRJUFRPTiBNRyBBRERJVElPTiBST09GIFJFUEFJUiAwNS0wOC0yMDI2IDAyLTM3LTIyIFBNLnBkZg%3D%3D&auth=MDpBRVMyI0NQNVp4a2IvSnkxZDNIUm81TGpka2h4M0V4bkpBZDlVSkVFUnk5WnZrK2l5eGZjOVRGNkRHUlU9 https://bids01.jaggaer.com/apps/Router/PublicEventDownload?file=U291cmNpbmdldmVudC8xMzg2OTY4LTIwMjQxMTI3NzVQbGFucyAtIDIwIE1BUiAyLTI2X0Q2X1RpcHRvbiBfREMucGRm&auth=MDpBRVMyI0NQNVp4a2IvSnkxZDNIUm81TGpka2h4M0V4bkpBZDlVSkVFUnk5WnZrK2l5eGZjOVRGNkRHUlU9

Questions Required Questions

Group 1: Construction Instructions:

1.1

Labor Relations:

All Bidders, before entering into a contract with the Department, must be registered with the Division of Labor in the Iowa Department of Workforce Development (515-281-3606) according to chapter 91C, Code of Iowa 2015. This pertains to contractor’s who engage in the business of construction. Please provide your contractor number.

1.2 Is there a lead time on Fabricated or Custom-Built Materials? All Bidders must provide a lead time on any fabricated or custom-built product or products that will impact the project timeline. "No" indicates that all materials needed for the project are readily available with no known delays.

1.3 Project Period:

Please provide the estimated number of days needed to complete the project in this proposal once you have materials readily available.

1.4 Fabricated or Custom-Built Materials Lead Time: Lead times are to be listed for each fabricated product, including estimated product delivery date.

1.5 Bidder's Proposed Project Dates: If bidder wishes to propose alternate project start and end dates, please provide in response field. DOT will evaluate and consider the proposed dates.

1.6 Contract Signing Authority: In the event your company receives the award for this bid opportunity, please provide the following contact information for the person authorized to sign on your company's behalf: Name, Phone Number, Fax Number, and Email address.

1.7

Performance and Payment Bond:

If the contracted amount is $25,000 or more, the successful Bidder must furnish a performance and payment bond covering the faithful performance of 100% of the Contract and the payment of all obligations arising thereunder.

Iowa DOT will provide the Performance and Payment Bond Form 131070 upon contract award.

A Resident Commission Agent or attorney-in-fact must file a copy of the power of attorney.

1.8 Power of Attorney:

Attorney-in-fact who signs the Proposal Guaranty and/or Performance Bond must file with each bond a certified and effectively dated copy of the Power of Attorney.

1.9

Insurance Required:

The resulting Contract will require the successful Contractor to maintain insurance coverage(s) of the type and in the amounts set forth in the Standard Terms and Conditions or as otherwise specified.

14 May 202614 May 202614 May 202614 May 202614 May 2026

Product Line Items Product Line Items

1.

# Item Name, Commodity Code, Description Allow

Alternates Qty. UOM Requested Delivery

P1 Tipton Maintenance Garage Addition Building Re-roof 1 JA - Job 7/15/2026

Removal of existing Shingles and re-roof with metal panels

14 May 202614 May 202614 May 202614 May 2026

Service Line Items Service Line Items

There are no Items added to this event.

14 May 202614 May 202614 May 2026

File details come from the government source that posted it. Updated .